Chapter 10: The Basics of Capital Budgeting: Evaluating Cash Flows

Slides:



Advertisements
Similar presentations
Chapter 11: Capital Budgeting: Decision Criteria Overview and “vocabulary” Methods Payback, discounted payback NPV IRR, MIRR Profitability Index.
Advertisements

Should we build this plant? Lecture Twelve Capital Budgeting The Basics.
PERTEMUAN 6 PENILAIAN AKTIVA TETAP (1A) dikutip dari materi bahan ajar FE-UNTAR (2011) S1- ANALISIS KEUANGAN.
1 Chapter 12 Capital Budgeting: Decision Criteria.
CapitalBudgeting Payback Net present value (NPV)
Chapter 8 Capital Budgeting Techniques © 2005 Thomson/South-Western.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
CHAPTER 10 The Basics of Capital Budgeting 1. Payback Period 2. Discounted Payback 3. Net Present Value (NPV) 4. Internal Rate of Return (IRR) 5. Modified.
1 Chapter 12 Capital Budgeting: Decision Criteria.
Software Project Management
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
1 Chapter 12 The Basics of Capital Budgeting: Evaluating Cash Flows.
9 - 1 Copyright © 2001 by Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
Copyright © 2002 by Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
8-1 Chapter 8: Capital Budgeting Techniques. 8-2 n The process of planning and evaluating expenditures on assets whose cash flows are expected to extend.
1 Chapter 11 The Basics of Capital Budgeting: Evaluating Cash Flows.
Lecture 7 - Capital Budgeting: Decision Criteria.
Should we build this plant? The Basics of Capital Budgeting.
Chapter 6 Capital Budgeting Techniques © 2005 Thomson/South-Western.
1 Chapter 13 Capital Budgeting: Decision Criteria.
1 Chapter 10: The Basics of Capital Budgeting: Evaluating Cash Flows Overview and “vocabulary” Methods Payback, discounted payback NPV IRR, MIRR Profitability.
10-1 CHAPTER 10 The Basics of Capital Budgeting Should we build this plant?
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
10-1 The Basics of Capital Budgeting What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions; involve large.
Copyright © 2001 by Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
1 What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions; involve large expenditures. Very important to firm’s.
Copyright © 2002 Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 13 The Basics of Capital Budgeting: Evaluating Cash Flows.
Copyright © 2002 Harcourt College Publishers.All rights reserved. Should we build this plant? CHAPTER 11 C apital Budgeting: Decision Criteria.
11-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
8-1 Copyright (C) 2000 by Harcourt, Inc. All rights reserved. Chapter 8: Capital Budgeting Techniques Copyright © 2000 by Harcourt, Inc. All rights reserved.
1 Chapter 10 Capital Budgeting. 2 Topics Overview and “vocabulary” Methods NPV IRR, MIRR Profitability Index Payback, discounted payback Unequal lives.
Ch 12: Capital Budgeting Decision Criteria
1 Chapter 10 The Basics of Capital Budgeting. 2 Topics Overview and “vocabulary” Methods NPV IRR, MIRR Profitability Index Payback, discounted payback.
1 Chapter 10 The Basics of Capital Budgeting: Evaluating Cash Flows.
1 Chapter 12 Capital Budgeting: Decision Criteria.
10-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
CHAPTER 11 The Basics of Capital Budgeting
Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
1 Chapter 10 Capital Budgeting. 2 Topics Overview and “vocabulary” Methods NPV IRR, MIRR Profitability Index Payback, discounted payback Unequal lives.
Capital Budgeting: Decision Criteria
What is capital budgeting? Analysis of potential projects. Long-term decisions; involve large expenditures. Very important to firm’s future.
The Basics of Capital Budgeting: Investment Criteria and
1 Chapter 10 Capital Budgeting. 2 Topics Overview and “vocabulary” Methods NPV IRR, MIRR Profitability Index Payback, discounted payback Unequal lives.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
ALL RIGHTS RESERVED No part of this document may be reproduced without written approval from Limkokwing University of Creative Technology 1-1 Chapter 8.
1 Chapter 10 Capital Budgeting. 2 Topics Overview and “vocabulary” Methods NPV IRR, MIRR Profitability Index Payback, discounted payback Unequal lives.
1 Capital Budgeting Techniques © 2007 Thomson/South-Western.
PERTEMUAN 6 PENILAIAN AKTIVA TETAP (1A) dikutip dari materi bahan ajar FE-UNTAR (2011) S1- ANALISIS KEUANGAN.
CHAPTER 10 The Basics of Capital Budgeting
Chapter 10 Capital Budgeting.
Capital Budgeting: Decision Criteria
Chapter 10: The Basics of Capital Budgeting: Evaluating Cash Flows
The Basics of Capital Budgeting
The Basics of Capital Budgeting
CHAPTER 11 Capital Budgeting: Decision Criteria
The Basics of Capital Budgeting: Evaluating Cash Flows
The Basics of Capital Budgeting
Chapter 10 Capital Budgeting.
CHAPTER 10 The Basics of Capital Budgeting
The Basics of Capital Budgeting
Chapter 10 Capital Budgeting.
Chapter 11: Capital Budgeting: Decision Criteria Overview and “vocabulary” Methods Payback, discounted payback NPV IRR, MIRR Profitability Index.
Chapter 10 Capital Budgeting.
Chapter 10 Capital Budgeting.
CHAPTER 10 The Basics of Capital Budgeting
Chapter 10 Capital Budgeting.
The Basics of Capital Budgeting
The Basics of Capital Budgeting
Presentation transcript:

Chapter 10: The Basics of Capital Budgeting: Evaluating Cash Flows Overview and “vocabulary” Methods Payback, discounted payback NPV IRR, MIRR Profitability Index Unequal lives Economic life

MINICASE 10

What is capital budgeting? Analysis of potential projects. Long-term decisions; involve large expenditures. Very important to firm’s future.

Steps in Capital Budgeting Estimate cash flows (inflows & outflows). Assess risk of cash flows. Determine r = WACC for project. Evaluate cash flows.

Digression: What is the difference between independent and mutually exclusive projects? Projects are: independent, if the cash flows of one are unaffected by the acceptance of the other. mutually exclusive, if the cash flows of one can be adversely impacted by the acceptance of the other.

An Example of Mutually Exclusive Projects BRIDGE VS. BOAT TO GET PRODUCTS ACROSS A RIVER.

Normal Project Nonnormal Project

Normal Project Cost (negative CF) followed by a series of positive cash inflows. Nonnormal Project One or more outflows occur after inflows have begun. Most common: Cost (negative CF), then string of positive CFs, then cost to close project. Nuclear power plant, strip mine.

Inflow (+) or Outflow (-) in Year 1 2 3 4 5 N NN - + + + + + N - + + + + - NN - - - + + + N + + + - - - NN - + + - + - NN

c(1). What is the payback period?

What is the payback period? The number of years required to recover a project’s cost, or how long does it take to get our money back?

Payback for Project L (Long: Most CFs in out years) 1 2 2.4 3 CFt -100 10 60 80 Cumul -100 -90 -30 50 PaybackL = 2 + 30/80 = 2.375 years. n.b. Assumes CF’s occur evenly over the year.

Project S (Short: CFs come quickly) 1 1.6 2 3 CFt -100 70 50 20 Cumul -100 -30 20 40 PaybackS = 1 + 30/50 = 1.6 years. Payback is a type of breakeven analysis.

Strengths of Payback Weaknesses of Payback

c(2). Strengths of Payback Provides an indication of a project’s risk and liquidity. Easy to calculate and understand. Weaknesses of Payback Ignores the TVM. Ignores CFs occurring after the payback period.

c(3):Discounted Payback: Uses discounted rather than raw CFs. Apply to Project L. 2.7 1 2 3 10% CFt -100 10 60 80 PVCFt -100 9.09 49.59 60.11 Cumul -100 -90.91 -41.32 18.79 Disc. payback = 2 + 41.32/60.11 = 2.7 years. Recover invest. + cap. costs in 2.7 years.

d(1) Net Present Value (NPV)

Net Present Value (NPV) Sum of the PVs of inflows and outflows. n t=0 CFt (1 + k)t NPV =  If one expenditure at t = 0, then n t=1 CFt (1 + k)t NPV =  +CF0.

NET PRESENT VALUE NPV = CF0 + CF1/(1+k) + CF2/(1+k)2 + ... + CFn/(1+k)n

Project L: (Beware use of comp. fns) What is Project L’s NPV? Project L: (Beware use of comp. fns) 1 2 3 10% -100.00 10 60 80

What is Project L’s NPV? Project L: 18.78 = NPVL NPVS = $19.98. 1 2 3 1 2 3 10% -100.00 9.09 49.58 60.11 18.78 = NPVL NPVS = $19.98. 10 60 80

Calculator Solution Enter in CFLO for L: = 18.78 = NPVL. -100 10 60 80

d(2) Rationale for the NPV Method If NPV = 0, project breaks even; recovers cost of investment investors earn required rate of return (i.e. opportunity cost of capital) If NPV > 0; investors get above, plus additional $.

CONSIDER PROJECT L: SUM OF undiscounted CF’s = 150 Investors get $100 back Cover their 10% cost of capital; and have $18.79 left over. Who does this $18.79 belong to? Stockholders.

Rationale for the NPV Method NPV = PV inflows - PV of Cost = Net gain in wealth. Accept project if NPV > 0. Choose between mutually exclusive projects on basis of higher NPV. Adds most value.

Using NPV method, which project(s) should be accepted? If Projects S and L are mutually exclusive, ? If S & L are independent, ?

Using NPV method, which project(s) should be accepted? If Projects S and L are mutually exclusive,….. If S & L are independent, accept….. What happens to the NPV as the cost of capital changes?

e(1) What is the Internal Rate of Return (IRR) 1 2 3 CF0 CF1 CF2 CF3 Cost Inflows

Internal Rate of Return (IRR) 1 2 3 CF0 CF1 CF2 CF3 Cost Inflows IRR is the discount rate that forces PV inflows = cost. This is the same as forcing NPV = 0.

  NPV: Enter k, solve for NPV. CF k NPV   1 .    1 . IRR: Enter NPV = 0, solve for IRR.

What is Project L’s IRR? 1 2 3 IRR = ? -100.00 10 60 80 PV1 PV2 PV3 1 2 3 IRR = ? -100.00 10 60 80 PV1 PV2 PV3 0 = NPV

Enter CFs in CFLO, then press IRR: What is Project L’s IRR? 1 2 3 IRR = ? -100.00 10 60 80 PV1 PV2 PV3 Enter CFs in CFLO, then press IRR: 0 = NPV IRRL = 18.13%. IRRS = 23.56%.

e(2) How is a project’s IRR related to a bond’s YTM? 1 2 10 IRR = ? -1134.2 90 90 1090

How is a project’s IRR related to a bond’s YTM? They both measure percentage (rate of) return. A bond’s YTM is its IRR. 1 2 10 IRR = ? -1134.2 90 90 1090 IRR = 7.08% (use TVM or CFLO).

e(3) Rationale for the IRR Method?

Rationale for the IRR Method If IRR > WACC, then the project’s rate of return is greater than its cost--some return is left over to boost stockholders’ returns. Example: WACC = 10%, IRR = 15%. Profitable.

IRR Acceptance Criteria If IRR > k, accept project. If IRR < k, reject project.

Using IRR method, which project(s) should be accepted?

Using IRR method, which project(s) should be accepted? If S and L are independent, ………. If S and L are mutually exclusive, accept…………. What effect does a change in the cost of capital have on the IRR?

f(1) Define Profitability Index (PI)

Define Profitability Index (PI) PV of inflows PV of outflows PI = . PI measures a project’s “bang for the buck”.

Calculate each project’s PI.

Calculate each project’s PI. Project L: $9.09 + $49.59 + $60.11 $100 PIL = = 1.19. Project S: $63.64 + $41.32 + $15.03 $100 PIS = = 1.20.

PI Acceptance Criteria

PI Acceptance Criteria If PI > 1, accept. If PI < 1, reject. The higher the PI, the better the project. For mutually exclusive projects, take the one with the highest PI. Therefore, accept L and S if independent; only accept S if mutually exclusive. Any problems with using PI?

g(1) Construct NPV Profiles Enter CFs in CFLO and find NPVL and NPVS at different discount rates: NPVL 50 33 19 7 (4) NPVS 40 29 20 12 5 k 5 10 15 20

NPV ($) Discount Rate (%) NPVL 50 33 19 7 (4) NPVS 40 29 20 12 5 k 5 5 10 15 20 50 40 Crossover Point = 8.7% 30 20 S IRRS = 23.6% 10 L Discount Rate (%) 5 10 15 20 23.6 -10 Vertical intercept horizontal intercept crossover point IRRL = 18.1%

NPV and IRR always lead to the same accept/reject decision for independent projects. IRR > k and NPV > 0 Accept. k > IRR and NPV < 0. Reject. k (%) IRR

g(2) Mutually Exclusive Projects NPV k < 8.7: NPVL > NPVS , IRRS > IRRL CONFLICT L k > 8.7: NPVS > NPVL , IRRS > IRRL NO CONFLICT S IRRs % k 8.7 k IRRL

To Find the Crossover Rate 1. Find cash flow differences between the projects. 2. Enter these differences in CFLO register, then press IRR. Crossover rate = 8.68, rounded to 8.7%. 3. Can subtract S from L or vice versa, but better to have first CF negative. 4. If profiles don’t cross, one project dominates the other.

How do you calculate the crossover point?

Which project do you choose?

h(1) Why do NPV profiles cross? Size (scale) differences. Smaller project frees up funds at t = 0 for investment. The higher the opp. cost, the more valuable these funds, so high k favors small projects. Timing differences. Project with faster payback provides more CF in early years for reinvestment. If k is high, early CF especially good, NPVS > NPVL.

Reinvestment Rate Assumptions NPV assumes reinvestment at k (opportunity cost of capital). IRR assumes reinvestment at IRR. Reinvestment at opportunity cost, k, is more realistic, so NPV method is best. NPV should be used to choose between mutually exclusive projects.

i(1) Managers prefer IRR to NPV. Can we give them a better IRR?

Managers prefer IRR to NPV. Can we give them a better IRR? Yes, modified IRR (MIRR) is the discount rate which causes the PV of a project’s terminal value (TV) to equal the PV of costs. TV is found by compounding inflows at WACC. Thus, MIRR forces cash inflows to be reinvested at WACC.

MIRR for Project L (k = 10%): 1 2 3 10% 10.0 60.0 80.0 -100.0 10% 66.0 12.1 10% MIRR = 16.5% 158.1 -100.0 $158.1 (1+MIRRL)3 $100 = TV inflows PV outflows MIRRL = 16.5%

MIRR for Project L (k = 10%): 1 2 3 10% 10.0 60.0 80.0 -100.0 10% 66.0 12.1 10% 158.1 -100.0 TV inflows PV outflows MIRRL = 16.5%

EXCEL HAS MIRR FUNCTION!

Why use MIRR rather than IRR? MIRR correctly assumes reinvestment at opportunity cost = k. MIRR also avoids problems with multiple IRR’s with nonnormal projects. Managers like rate of return comparisons, and MIRR is better for this than IRR.

J: Pavillion Project: NPV and IRR? 1 2 k = 10% -800 5,000 -5,000 What is NPV?, IRR? What is MIRR?

Pavillion Project: NPV and IRR? 1 2 k = 10% -800 5,000 -5,000 Enter CFs in CFj, enter I/YR = 10. NPV = -$386.78 IRR = ERROR. Why?

How do we find the IRR on a 12c? Make a guess for i and key it in i. RCL g R/S.

We got IRR = ERROR because there are 2 IRRs. Nonnormal CFs with two sign changes. Here’s a picture: NPV NPV Profile IRR2 = 400% 450 k 100 400 IRR1 = 25% -800

Logic of Multiple IRRs At very low disc. rates, the PV of CF2 is large & negative, so NPV < 0. At very high disc. rates, the PV of CF1 and CF2 are both low, so CF0 dominates and again NPV < 0. In between, the disc. rate hits CF2 harder than CF1 , so NPV > 0. Result: 2 IRRs.

When there are nonnormal CFs, use MIRR: 1 2 -800,000 5,000,000 -5,000,000 PV outflows @ 10% = -4,932,231.40. TV inflows @ 10% = 5,500,000.00. MIRR = 5.6%

j(2) Accept Project P?

Accept Project P? NO. Reject because MIRR = 5.6% < k = 10%. Also, if MIRR < k, NPV will be negative: NPV = -$386,777.

NEW QUESTION: Which of the following mutually exclusive project’s is better? (000s) 1 2 3 4 Project S: (100) Project L: 60 33.5 60 33.5 33.5 33.5 23

S L CF0 -100,000 -100,000 CF1 60,000 33,500 Nj 2 4 I 10 10 NPV 4,132 6,190 NPVL > NPVS. But is L better? Can’t say yet. Need to perform common life analysis.

Note that Project S could be repeated after 2 years to generate additional profits. Can use either replacement chain or equivalent annual annuity analysis to make decision.

Franchise S with Replication: Replacement Chain Approach (000s) Franchise S with Replication: 1 2 3 4 Franchise S: (100) 60 60 (100) (40) 60 60 NPV = $7,547.

Or, use NPVs: 1 2 3 4 4,132 3,415 7,547 4,132 10% Compare to Franchise L NPV = $6,190.

Equivalent Annual Annuity (EAA) Approach Finds the constant annuity payment whose PV is equal to the project’s raw NPV over its original life. 28

EAA Calculator Solution Project S PV = Raw NPV = $4,132. n = Original project life = 2. k = 10%. Solve for PMT = EAAS = $2,381. Project L PV = $6,190; n = 4; k = 10%. Solve for PMT = EAAL = $1,953. 29

The project, in effect, provides an annuity of EAA. EAAS > EAAL so pick S. Replacement chains and EAA always lead to the same decision if cash flows are expected to stay the same. 30

If the cost to repeat S in two years rises to $105,000, which is best If the cost to repeat S in two years rises to $105,000, which is best? (000s) 1 2 3 4 Franchise S: (100) 60 60 (105) (45) 60 60 NPVS = $3,415 < NPVL = $6,190. Now choose L.

Abandon because losing money, e.g., smokeless cigarette. Types of Abandonment Sale to another party who can obtain greater cash flows, e.g., IBM sold typewriter division. Abandon because losing money, e.g., smokeless cigarette. 31

Consider another project with a 3-year life Consider another project with a 3-year life. If terminated prior to Year 3, the machinery will have positive salvage value. Year 1 2 3 CF ($5,000) 2,100 2,000 1,750 Salvage Value $5,000 3,100 2,000

CFs Under Each Alternative (000s) 1 2 3 1. No termination 2. Terminate 2 years 3. Terminate 1 year (5) 2.1 5.2 2 4 1.75

Assuming a 10% cost of capital, what is the project’s optimal, or economic life? NPV(no) = -$123. NPV(2) = $215. NPV(1) = -$273.

Conclusions The project is acceptable only if operated for 2 years. A project’s engineering life does not always equal its economic life.

The project is acceptable only if operated for 2 years. Conclusions The project is acceptable only if operated for 2 years. A project’s engineering life does not always equal its economic life. The ability to abandon a project may make an otherwise unattractive project acceptable. Abandonment possibilities will be very important when we get to risk. 35

Choosing the Optimal Capital Budget Finance theory says to accept all positive NPV projects. Two problems can occur when there is not enough internally generated cash to fund all positive NPV projects: An increasing marginal cost of capital. Capital rationing

Increasing Marginal Cost of Capital Externally raised capital can have large flotation costs, which increase the cost of capital. Investors often perceive large capital budgets as being risky, which drives up the cost of capital. (More...)

If external funds will be raised, then the NPV of all projects should be estimated using this higher marginal cost of capital.

Capital Rationing Capital rationing occurs when a company chooses not to fund all positive NPV projects. The company typically sets an upper limit on the total amount of capital expenditures that it will make in the upcoming year. (More...)

Reason: Companies want to avoid the direct costs (i. e Reason: Companies want to avoid the direct costs (i.e., flotation costs) and the indirect costs of issuing new capital. Solution: Increase the cost of capital by enough to reflect all of these costs, and then accept all projects that still have a positive NPV with the higher cost of capital. (More...)

Reason: Companies don’t have enough managerial, marketing, or engineering staff to implement all positive NPV projects. Solution: Use linear programming to maximize NPV subject to not exceeding the constraints on staffing. (More...)

Reason: Companies believe that the project’s managers forecast unreasonably high cash flow estimates, so companies “filter” out the worst projects by limiting the total amount of projects that can be accepted. Solution: Implement a post-audit process and tie the managers’ compensation to the subsequent performance of the project.