Chapter 9 - Capital Budgeting Decision Criteria. Capital Budgeting: The process of planning for purchases of long- term assets.  For example: Suppose.

Slides:



Advertisements
Similar presentations
 2005, Pearson Prentice Hall CHAPTER 11 Capital Budgeting Decision Criteria.
Advertisements

Hospitality Financial Management By Robert E. Chatfield and Michael C. Dalbor ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ.
Timothy R. Mayes, Ph.D. FIN 3300: Chapter 9
Chapter 10 Capital-Budgeting Techniques and Practice.
Chapter 9. Capital Budgeting: the process of planning for purchases of long- term assets. n example: Suppose our firm must decide whether to purchase.
9-0 Chapter 9: Outline Net Present Value The Payback Rule The Discounted Payback The Average Accounting Return The Internal Rate of Return The Profitability.
Intro to Financial Management Capital Budgeting. Review Homework Cost of bonds –Use net proceeds –Use after-tax cost Cost of common stock –Use net proceeds.
1 The Basics of Capital Budgeting: Evaluating and Estimating Cash Flows Corporate Finance Dr. A. DeMaskey Should we build this plant?
Chapter McGraw-Hill Ryerson © 2013 McGraw-Hill Ryerson Limited 9 Prepared by Anne Inglis Net Present Value and Other Investment Criteria.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 0 Chapter 8 Net Present Value and Other Investment Criteria.
B280F Introduction to Financial Management
Drake DRAKE UNIVERSITY Fin 200 NPV IRR and Capital Budgeting.
McGraw-Hill © 2004 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Net Present Value and Other Investment Criteria Chapter 8.
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
Thank you Presentation to Cox Business Students FINA 3320: Financial Management Lecture 12: The Basics of Capital Budgeting NPV, IRR, and Other Methods.
CHAPTER 10 The Basics of Capital Budgeting 1. Payback Period 2. Discounted Payback 3. Net Present Value (NPV) 4. Internal Rate of Return (IRR) 5. Modified.
Net Present Value and Other Investment Criteria
0 Net Present Value and Other Investment Criteria.
Chapter 9 INVESTMENT CRITERIA Pr. Zoubida SAMLAL GF 200.
1 Chapter 12 The Basics of Capital Budgeting: Evaluating Cash Flows.
9 - 1 Copyright © 2001 by Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
1 Chapter 10: The Basics of Capital Budgeting: Evaluating Cash Flows Overview and “vocabulary” Methods Payback, discounted payback NPV IRR, MIRR Profitability.
NPV and IRR - Using the BAII Plus Professional Calculator NPV and IRR - Using the BAII Plus Professional Calculator Managerial Accounting Prepared by Diane.
Chapter 9. Investment In Long-Term Assets Chapter Objectives Difficulty in finding profitable projects Use capital budget techniques to evaluate new.
Chapter – 5 & 6: NPV & Other Investment Rules, Cash flows
Key Concepts and Skills
10-1 CHAPTER 10 The Basics of Capital Budgeting Should we build this plant?
CHAPTER 10 The Basics of Capital Budgeting Omar Al Nasser, Ph.D. FIN
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Net Present Value and Other Investment Criteria.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
10-1 The Basics of Capital Budgeting What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions; involve large.
Investment Decision Rules 04/30/07 Ch. 10 and Ch. 12.
Measuring Return on Investments: Investment Decision Rules and Project Interactions 02/04/08 Ch. 5 part 2 and Ch. 6.
Chapter 10: The Basics Of Capital Budgeting. 2 The Basics Of Capital Budgeting :
Chapter 9. Capital Budgeting Techniques and Practice  2000, Prentice Hall, Inc.
Capital Budgeting Chapter 11.
11-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
1 Chapter 10 The Basics of Capital Budgeting: Evaluating Cash Flows.
Unit 4 – Capital Budgeting Decision Methods
Exam 3 Review.  The ideal evaluation method should: a) include all cash flows that occur during the life of the project, b) consider the time value of.
The Capital Budgeting Decision Chapter 12. Chapter 12 - Outline What is Capital Budgeting? 3 Methods of Evaluating Investment Proposals Payback IRR NPV.
10-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
1 Capital-BudgetingTechniques Chapter 9. 2 Capital Budgeting Concepts  Capital Budgeting involves evaluation of (and decision about) projects. Which.
CHAPTER 11 The Basics of Capital Budgeting
Ch. 10: Capital Budgeting Techniques and Practice  2000, Prentice Hall, Inc.
Chapter 6 Capital Budgeting Criteria. Capital Budgeting: The process of planning for purchases of long-term assets. For example: Suppose our firm must.
©2012 McGraw-Hill Ryerson Limited 1 of 45 Learning Objectives 1.Define capital budgeting decisions as long-run investment decisions. (LO1) 2.Explain that.
13-1 Agenda for 30 July (Chapter 9) Assessment of various commonly used methods for deciding how capital is to be allocated. Net Present Value (NPV) The.
Summary of Previous Lecture We covered following topics in our previous lecture; capital budgeting” and the steps involved in the capital budgeting process.
Capital Budgeting Decision-making Criteria
Capital Budgeting: Decision Criteria
Basics of Capital Budgeting. An Overview of Capital Budgeting.
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
Capital Budgeting Decision Methods 1. Learning Objectives The capital budgeting process. Calculation of payback, NPV, IRR, and MIRR for proposed projects.
 2005, Pearson Prentice Hall Chapter 9 - Capital Budgeting Decision Criteria.
ALL RIGHTS RESERVED No part of this document may be reproduced without written approval from Limkokwing University of Creative Technology 1-1 Chapter 8.
10-1 CHAPTER 10 The Basics of Capital Budgeting What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions;
DMH1. 2 The most widely accepted objective of the firm is to maximize the value of the firm. The financial management is largely concerned with investment,
Capital Budgeting Decision Rules
Ch. 9: Capital Budgeting Decision Criteria
The Basics of Capital Budgeting
TECHNIQUES IN CAPITAL BUDGETING
CHAPTER 10 The Basics of Capital Budgeting.
Capital Budgeting Techniques FHU3213
Capital Budgeting: Decision Criteria
The Basics of Capital Budgeting
Chapter 7 - Capital Budgeting Decision Criteria
Capital-Budgeting Techniques.
FIN 360: Corporate Finance
Presentation transcript:

Chapter 9 - Capital Budgeting Decision Criteria

Capital Budgeting: The process of planning for purchases of long- term assets.  For example: Suppose our firm must decide whether to purchase a new plastic molding machine for $125,000. How do we decide?  Will the machine be profitable?  Will our firm earn a high rate of return on the investment?

Decision-making Criteria in Capital Budgeting How do we decide if a capital investment project should be accepted or rejected?

 The ideal evaluation method should: a) include all cash flows that occur during the life of the project, b) consider the time value of money, and c) incorporate the required rate of return on the project. Decision-making Criteria in Capital Budgeting

Payback Period  How long will it take for the project to generate enough cash to pay for itself? Payback period = 3.33 years (500)

 Is a 3.33 year payback period good?  Is it acceptable?  Firms that use this method will compare the payback calculation to some standard set by the firm.  If our senior management had set a cut- off of 5 years for projects like ours, what would be our decision?  Accept the project. Payback Period

Drawbacks of Payback Period Projects A B Cash outlay -10, ,000 Annual CF Year 1 6,000 5,000 Year 2 4,000 5,000 Year 3 3,000 0 Year 4 2,000 0 Year 5 1,000 0

Drawbacks of Payback Period  Firm cutoffs are subjective.  Does not consider time value of money.  Does not consider any required rate of return.  Does not consider all of the project’s cash flows.

Discounted Payback  Discounts the cash flows at the firm’s required rate of return.  Payback period is calculated using these discounted net cash flows. Problems:  Cutoffs are still subjective.  Still does not examine all cash flows.

Discounted Payback (500) Discounted Discounted Year Cash FlowCF (14%) year year years years years years

Discounted Payback (500) Discounted Discounted Year Cash FlowCF (14%) year year years years years years The Discounted Payback is 2.52 years

Advantages of Payback  Use free cash flow, not accounting profits  Easy understood and calculate  Often used as a rough screening device

Other Methods 1) Net Present Value (NPV) 2) Profitability Index (PI) 3) Internal Rate of Return (IRR) Consider each of these decision-making criteria:  All net cash flows.  The time value of money.  The required rate of return.

 NPV = the total PV of the annual net cash flows - the initial outlay. NPV = - IO FCF t FCF t (1 + k) t nt=1  Net Present Value

Decision Rule:  If NPV is >=0, accept.  If NPV is negative, reject.

NPV Example (250,000) 100, , , , ,000  Suppose we are considering a capital investment that costs $250,000 and provides annual net cash flows of $100,000 for five years. The firm’s required rate of return is 15%.

Net Present Value NPV is just the PV of the annual cash flows minus the initial outflow. N = 5 I = 15 PMT = 100,000 PV of cash flows = $335,216 PV of cash flows = $335,216 - Initial outflow: ($250,000) - Initial outflow: ($250,000) = Net PV $85,216 = Net PV $85,216

NPV with the TI BAII Plus:  Select CF mode.  CFo=? -250,000 ENTER  C01=? 100,000 ENTER  F01= 1 5 ENTER  NPV I= 15 ENTER CPT  You should get NPV = 85,215.51

NPV Example Free Cash Flow Free Cash Flow Initial outlay -40,000 Year 1 15,000 Year 2 14,000 Year 3 13,000 Year 4 12,000 Year 5 11,000 12% required rate of return, what is NPV?

NPV Example Free Cash Flow Discount Factor PV Free Cash Flow Discount Factor PV Year 1 $15, $13,395 Year 2 14, ,158 Year 3 13, ,256 Year 4 12, ,632 Year 5 11, ,237 Present Value of free cash flow $47,678 Initial outlay -40,000 Net present value $7,678

NPV Example Financial calculator: select CF mode Enter CF0 – CF5 one by one Fre = 1 I = 12 NPV = $7,678

Features of NPV  Deals with free cash flow  Consider the time value of money  Acceptance of a project using this criterion increases the value of firm

Profitability Index PI = IO FCF t (1 + k) n t=1  t NPV = - IO FCF t (1 + k) t n t=1 

 Decision Rule:  If PI is greater than or equal to 1, accept.  If PI is less than 1, reject. Profitability Index

PI Example Free Cash Flow Free Cash Flow Initial outlay -40,000 Year 1 15,000 Year 2 14,000 Year 3 13,000 Year 4 12,000 Year 5 11,000 12% required rate of return, what is PI?

PI Example Free Cash Flow Discount Factor PV Free Cash Flow Discount Factor PV Year 1 $15, $13,395 Year 2 14, ,158 Year 3 13, ,256 Year 4 12, ,632 Year 5 11, ,237 Present Value of free cash flow $47,678 Initial outlay -40,000 PI = 47,678 / 40,000 = 1.19 PI = 47,678 / 40,000 = 1.19

Yield the same accept-reject decision NPV: absolute dollar PI: relative measure Compare NPV and PI

Example: Project A: NPV = $10 Project B: NPV = $20 Which one is relatively better from the perspective of profitability? Compare NPV and PI

Example: It depends on your initial outlay. Suppose initial outlay of A = $50 Suppose initial outlay of B = $150 PI of A = ( ) / 50 = 1.2 PI of B = ( ) / 150 = 1.13 A’s profitability is higher Compare NPV and PI

Internal Rate of Return (IRR)  IRR: The return on the firm’s invested capital. IRR is simply the rate of return that the firm earns on its capital budgeting projects.

Internal Rate of Return (IRR) NPV = - IO FCF t (1 + k) t n t=1  n t=1  IRR: = IO FCF t (1 + IRR) t

Internal Rate of Return (IRR)  IRR is the rate of return that makes the PV of the cash flows equal to the initial outlay.  This looks very similar to our Yield to Maturity formula for bonds. In fact, YTM is the IRR of a bond. n t=1  IRR: = IO FCF t (1 + IRR) t

Calculating IRR  Looking again at our problem:  The IRR is the discount rate that makes the PV of the projected cash flows equal to the initial outlay (250,000) 100, , , , ,000

IRR with your Calculator  IRR is easy to find with your financial calculator.  Just enter the cash flows as you did with the NPV problem and solve for IRR.  You should get IRR = 28.65%!

IRR Decision Rule:  If IRR is greater than or equal to the required rate of return, accept.  If IRR is less than the required rate of return, reject.

Example A B C A B C Initial outlay -10, , ,000 FCF year 1 3, ,000 FCF year 2 3, ,000 FCF year 3 3, ,000 FCF year 4 3,362 13,605 7,000 Required rate of return = 10% Will we accept these projects?

Example IRR for A = 13% >10% accept IRR for A = 13% >10% accept IRR for B = 8% < 10% reject IRR for B = 8% < 10% reject IRR for C = 19.04% > 10% accept IRR for C = 19.04% > 10% accept

Summary Problem  Enter the cash flows only once.  Find the IRR.  Using a discount rate of 15%, find NPV.  Add back IO and divide by IO to get PI (900)

Summary Problem  IRR = 34.37%.  Using a discount rate of 15%, NPV = $ NPV = $  PI = (900)

Relationships of Methods  If NPV is “+”, IRR must be greater than the required rate of return. Also, PI is >1.  All three discounted cash flow criteria are consistent and give similar accept-reject decision.

Relationships of Methods  NPV: assumes cash flow can be reinvested at the project’s required rate of return  IRR: assumes cash flow can be reinvested at the project’s IRR  NPV is superior to IRR  As discount rate increases, PNV drops

One Drawback of IRR  IRR is a good decision-making tool as long as cash flows are conventional. ( )  Problem: If there are multiple sign changes in the cash flow stream, we could get multiple IRRs. ( )

 IRR is a good decision-making tool as long as cash flows are conventional. ( )  Problem: If there are multiple sign changes in the cash flow stream, we could get multiple IRRs. ( ) (500) (200)

Modified Internal Rate of Return (MIRR)  IRR assumes that all cash flows are reinvested at the IRR.  MIRR provides a rate of return measure that assumes cash flows are reinvested at the required rate of return.

MIRR Steps:  Calculate the PV of the cash outflows.  Using the required rate of return.  Calculate the FV of the cash inflows at the last year of the project’s time line. This is called the terminal value (TV).  Using the required rate of return.  MIRR: the discount rate that equates the PV of the cash outflows with the PV of the terminal value, ie, that makes:  PV outflows = PV inflows

MIRR Using our time line and a 15% rate:  PV outflows = (900).  FV inflows (at the end of year 5) = 2,837.  MIRR: FV = 2837, PV = (900), N = 5.  Solve: I = 25.81% (900)

Using our time line and a 15% rate:  PV outflows = (900).  FV inflows (at the end of year 5) = 2,837.  MIRR: FV = 2837, PV = (900), N = 5.  Solve: I = 25.81%. Conclusion: The project’s IRR of 34.37% assumes that cash flows are reinvested at 34.37%.  Assuming a reinvestment rate of 15%, the project’s MIRR is 25.81%. MIRR

 Decision rule:  If MIRR is greater than or equal to the required rate of return, accept.  If MIRR is less than the required rate of return, reject. MIRR

 Find profitable projects, and make accurate cash flow forecasting  Correctly evaluate them  Choose one as main criterion  Use others as robustness check How to Use Evaluating Criteria