OCS Survey Cost Analysis U. S. HYDROGRAPHIC CONFERENCE HSRP Meeting San Diego March 31 – April 1, 2005 1.

Slides:



Advertisements
Similar presentations
Quality Assurance Program - The Law - 33 USC § 892b. Quality assurance program (a) Definition. For purposes of this section, the term "hydrographic product"
Advertisements

Acquisition Planning and Adequate Market Research National Oceanic and Atmospheric Administration Acquisition and Grants Office Oversight and Compliance.
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Effectively Integrating Information Technology (IT) Security into the Acquisition Process Section 4: Effective Integration.
NOAA’s Office of Coast Survey: Hydrographic Surveys Division “World Class Hydro Data Delivered On Time” Slide Credit: CCOM/JHC Hydrographic Surveys Division.
Federal Budget Process Steve Kidd and Allison Boehm Budget and Program Analysis Staff April 2009.
29e CONFÉRENCE INTERNATIONALE DES COMMISSAIRES À LA PROTECTION DES DONNÉES ET DE LA VIE PRIVÉE 29 th INTERNATIONAL DATA PROTECTION AND PRIVACY COMMISSIONERS.
+ 3D Elevation Program (3DEP) NGAC Meeting September 5, 2013 The National Map.
Georgina Anthony Antonella Demartini Chanell Fletcher Jacob Lile Serenay Usta.
Hydrographic Services Review Panel October 12-13, 2010 Portland, OR Captain Donald Haines, NOAA Commanding Officer NOAA Ship Rainier.
1 Municipal Ports Training Seminar: Board Governance Issues Prepared for DfT by Fisher Associates June 2007.
1 Program Performance and Evaluation: Policymaker Expectations 2009 International Education Programs Service Technical Assistance Workshop Eleanor Briscoe.
1 FAA Reform: Congressional Staff Briefing January 24, 1996.
Office of the Auditor General of Canada The State of Program Evaluation in the Canadian Federal Government Glenn Wheeler Director, Results Measurement.
Purpose of the Standards
Regional Electronic Monitoring and Reporting (EM/ER) Implementation Plan CFMC Rio Grande, PR August 13, Scott Baker, NC Sea Grant.
Quality Assurance Program - The Law - 33 USC § 892b. Quality assurance program (a) Definition. For purposes of this section, the term "hydrographic product"
ZHRC/HTI Financial Management Training
What is Hydrography? – NOAA Hydro Training 2012 Surveying Puget Sound, 1927 What is Hydrography?
Guiding principles for the Federal acquisition system
1 VA-Affiliated Nonprofit Research and Education Corporations (NPCs) Barbara F. West Executive Director National Association of Veterans’ Research and.
The Brooks A&E Act National Oceanic & Atmospheric Administration Acquisition & Grants Office January 24, 2006.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
1 Joint ASIA / BIA / TRIBAL Data Management Committee A Proposed Centralized Data Management Function Sponsored by the Assistant Secretary for Indian Affairs.
FY 2007 Conservation Reserve Program (CRP). Conservation Reserve Program Topics Agency Roles and Responsibilities Agency Roles and Responsibilities CRP.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
NIST Special Publication Revision 1
+ 3D Elevation Program May 8, 2013 The National Map.
Documenting the Participation of Fishing Vessel Crew Members in Alaska’s Commercial Fisheries Documenting the Participation of Fishing Vessel Crew Members.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Tim Osborn NOAA Office of Coast Survey Gulf of Mexico Marine Debris Mapping Project Presented to Center for Ocean Sciences Education Excellence: Central.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
1 BUYING LIGHTNING DATA LESSONS LEARNED AND FUTURE CHALLENGES TO AVOID ANTI-DEFICIENCY DAN CLEVER DIRECTOR NWS ACQUISITION DIVISION 6/15/05.
Hydrographic Survey Cost Comparison August 18 – 19, 2005 Preliminary Investigations; Working Group 2 Lewis A. Lapine, Adam McBride and Larry M. Whiting.
Strengthening Science Supporting Fishery Management  Standards for Best Available Science  Implementation of OMB’s Peer Review Bulletin  Separation.
1 Introduction of Research and Development Project Evaluation System at NEDO Momoko OKADA New Energy and Industrial Technology Development Organization(NEDO)
Zdenka Willis Briefing to GCOOS March 4, 2010 US IOOS Update.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
Electronic Records Management: A New Understanding of Policy, Compliance, and Discovery Robert J. Sobie, Ph.D. Director Information Systems Department.
Housing Opportunities for Persons With AIDS (HOPWA) 2004 Renewal Competition.
Governmental Perspectives: Contracting for Hydrographic Services Glenn Boledovich Acting Chief, Policy, Planning and Analysis Division National Ocean Service.
NOAA Cooperative Institutes John Cortinas, Ph.D. OAR Cooperative Institute Program, Program Manager NOAA Cooperative Institute Committee, Chairperson.
Energy Policy Act - BLM Cadastral Support Strategy 1 CADASTRAL PLANNING CADASTRAL SERVICES Consultation for Effective and Efficient Land Management: National.
FGDC Coordination Group Meeting 11 May 2010 Roger L. Parsons, IWG-OCM Co-chair (NOAA) Ocean and Coastal Mapping Integration Act Congressional Reports Update.
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
4th Annual University Federal Dialogue on Environmental and Energy Research and Education Scott Rayder Chief of Staff National Oceanic & Atmospheric Administration.
Commercial Space Transportation Research and Development Program COMSTAC RLV Working Group Chuck Larsen October 10, 2007 Federal Aviation Administration.
State Perspectives on Coastal and Ocean Management A Review of A Review of Coastal States Organization’s Recommendations to the US Commission on Ocean.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
Atlantic Innovation Fund Round VIII February 5, 2008.
City of Pasadena Underground Utility Program Steve Toler, Senior Manager October 19, 2015.
The Administration’s Small Business Agenda Contract Bundling: A Strategy for Increasing Federal Contracting Opportunities for Small Business.
American Fisheries Society Incoming Governing Board Breakfast Scott Rayder Chief of Staff National Oceanic and Atmospheric Administration September 15,
HSRP Review of NOAA’s Mapping and Charting Contracting Strategy Brian Greenawalt, Office of Coast Survey.
Report of NOAA’s Ship Platform Requirements FY 2003 – FY Briefing for NOAA’s Hydrographic Services Review Panel ________________ Briefing by Captain.
Hydrographic Services Improvement Act of 1998 with Amendments from 2002 OVERVIEW.
Multistate Research Program Roles & Responsibilities Eric Young SAAESD Meeting Corpus Christi, TX April 3-6, 2005.
Spring,  STEP ONE: Core Services Matrix  Each administrative and student support department (including division offices) will complete a core.
Government Engineering college , Palanpur
Cattlemen’s Beef Board Planning & Budgeting Process.
EFFECTIVE & SUSTAINABLE PROCUREMENT SYSTEM IN LAGOS STATE Partnering for Development Onafowote, Fatai Idowu Acting General Manager (PPA) Presentation made.
The Administration’s Small Business Agenda
Strength Through Science
Alaska Citizen Review Panel
Fiscal Year 2018/19 Budget.
PRIP 101 Revolving Fund and the Plant Replacement and Improvement Program (PRIP) ER Nov-18.
Quality Assurance Program - The Law -
United Nations Voluntary Fund on Disability (UNVFD)
Presentation transcript:

OCS Survey Cost Analysis U. S. HYDROGRAPHIC CONFERENCE HSRP Meeting San Diego March 31 – April 1,

OCS Survey Cost Analysis Introduction In the late 1990’s, NOAA’s total survey workload had been prioritized to define “Critical Areas” and “Navigationally Significant Areas” NOAA’s survey assets had been steadily decreasing through the 1990’s due to inactive or decommissioned vessels Congress augmented NOAA’s survey resources to allow partnering with the private sector in order to more quickly reduce the Critical Area Survey Backlog NOAA received encouragement from the private sector to use leased vessels as another method of hydrographic data acquisition A cost analysis was completed in 2001 as a management tool to evaluate the cost effectiveness of three approaches to hydrographic data acquisition 2

OCS Survey Cost Analysis Background NOAA’s survey responsibilities: > 3 million snm in EEZ > 500,000 snm* in Navigationally Significant Areas ** > 40,000 snm in Critical Survey Backlog * Square Nautical Miles ** (80% in Alaska and Gulf of Mexico) 3

OCS Survey Cost Analysis Inactive/Decommissioned NOAA Hydro Ships During The Last 15 Years West Coast/Alaska Inactive/Decommissioned Remaining 2004 Op Costs Avg SNM Per Year DAVIDSON (1989) RAINIER $6.85M600-1,000 FAIRWEATHER (1989) (Reactivated 2004) SURVEYOR (1995) McARTHUR (2003) DISCOVERER (1996) East Coast/Gulf of Mexico Inactive/Decommissioned Remaining 2004 Op CostsAvg SNM Per Year HECK (1996) MT MITCHELL (1996) THOMAS JEFFERSON $4.99M PEIRCE (1992) RUDE$1.07M

OCS Survey Cost Analysis 5 NOS established contracting policy for mapping and charting services in 1996 that NOAA Navigation Services has essentially followed since that time. Policy states that contracts for surveying and mapping services will be awarded to qualified commercial sources in accordance with Title IX of the Federal Property and Administrative Services Act of 1949 (40 USC § 541 et seq.), commonly known as the “Brooks Act.” Reiterated by the 1998 Hydro Services Improvement Act, which authorized contracting to the greatest extent practicable and cost- effective, and the use of Brooks Act service contracts for hydrographic surveys National Ocean Service Contracting Policy

OCS Survey Cost Analysis A Historical Perspective On NOAA Contracting Since YEARSNM $$ AWARDED $8,937, $20,343, $15,578, ,346$18,153, $16,589, ,173$22,711, ,073$22,363,732

OCS Survey Cost Analysis Impact Of The Hydrographic Services Improvement Act (HSIA) Purpose was to rapidly decrease Critical Survey Backlog Increased opportunity to partner with private sector on mapping requirements Brooks Act A&E contracting procedures required Promulgation of standards for hydrographic surveying Development and implementation of Quality Assurance Program Maintenance of hydrographic expertise in NOAA 7

OCS Survey Cost Analysis Impact Of The Hydrographic Services Improvement Act (HSIA) HSIA Section 303 (b) provides that : …to fulfill the data gathering and dissemination duties of the Administration under the Act of 1947, and subject to the availability of appropriations, the Administrator - may procure, lease, evaluate, test, develop, and operate vessels, equipment, and technologies necessary to ensure safe navigation and maintain operational expertise (i.e., core capability) in hydrographic data acquisition and hydrographic services;

OCS Survey Cost Analysis 2000 NOAA Hearing for Navigation Services BEFORE THE SUBCOMMITTEE ON FISHERIES CONSERVATION, WILDLIFE AND OCEANS - COMMITTEE ON RESOURCES U.S. HOUSE OF REPRESENTATIVES NOAA reported on its navigation services for promoting safe navigation and the huge backlog of areas never surveyed or not adequately surveyed due to historical resource and technology limitations The Management Association For Private Photogrammetric Surveyors (MAPPS) testified that the capability to conduct hydrographic surveying existed in the private sector and that NOAA should be given more funds to execute The Brooks Act A&E contracts for hydrographic services Private sector ship building and leasing industry advocated NOAA acquire survey data with leased vessels rather than capitalizing for new NOAA ships 9

OCS Survey Cost Analysis Another Data Acquisition Approach NOAA historically conducted hydrographic data acquisition primarily using NOAA platforms. And though the number of platforms had been reduced, NOAA had a huge data acquisition requirement and also needed to maintain in-house operations to maintain hydrographic expertise and core competency NOAA had been conducting turnkey contract surveys since 1998, effectively increasing it’s capacity to acquire data NOAA wanted to explore the use of leased vessels as a potentially cost effective, additional method of partnering with the private sector for increasing its capacity for data acquisition 10

OCS Survey Cost Analysis NOAA Initiative For Cost Analysis NOAA initiated cost analysis to determine data acquisition costs for 3 approaches: In House Contract Leased Vessel 11

OCS Survey Cost Analysis Preliminary NOAA Internal Cost Analysis Cost analysis of data acquisition by NOAA-conducted surveys and by contractor-conducted surveys was performed by HSD personnel Upon completion and review, it was decided to follow up with external analysis:  To assure standard accounting practices were used  To assure that all cost factors were included  To assure compliance with relevant GAO/OMB guidelines Contract to perform analysis was won by KPMG consulting, with final report completed in September 2001 and Addendum completed October

OCS Survey Cost Analysis KPMG Final Report Cost Study Executive Summary The results of this analysis are estimates of the cost per square nautical mile of conducting hydrographic surveys in Alaska and in the Gulf of Mexico, under three scenarios: Utilizing NOAA vessels and staff; Contracting for hydrographic survey services and related activities; and Chartering a survey vessel, including staff and equipment, with limited NOAA personnel on-board. 13

OCS Survey Cost Analysis KPMG Final Report Cost Study Executive Summary ~ Continued ~ The Alaska surveys are divided into shallow and deep water regions; deep water refers to depths of greater than 100 feet (30 meters). The results of the analysis are as follows: Cost per square nautical mile ($/SNM), thousands of dollars In-house Contractor Time Charter Alaska - Shallow $24.17 $58.38 $18.89 * Alaska - Deep $12.18 $35.62 Gulf of Mexico $17.40 $19.70 $ * Costs of the Time Charter for Alaska did not initially differentiate between deep and shallow water surveys 14

OCS Survey Cost Analysis KPMG Final Report Cost Study Executive Summary (Addendum) ~ Continued ~ The table below shows the results of the original analysis, along with the additional results for time charter surveys specifically in shallow water and deep water. The first three columns of results are identical to the original report. The last column displays the new findings. Cost per square nautical mile ($/SNM), thousands of dollars In-house Contractor Time Charter * Time Charter ** Alaska - Shallow $24.17 $58.38 $18.89 $33.02 Alaska - Deep $12.18 $35.62 $ * This estimate does not differentiate between shallow and deep water surveys ** Based on a full year of shallow water surveying and a full year of deep water surveying, respectively 15

OCS Survey Cost Analysis Why Update The Survey Cost Analysis? Data is 4-5 years old Time Charter based on RFI rather than experience Time Charter implementation different from scenario in RFI FAIRWEATHER reactivated THOMAS JEFFERSON replaces WHITING OMB has inquired about what NOAA is doing to improve cost efficiency for all data acquisition methods Potential increase in FY 2006 budget 16

OCS Survey Cost Analysis Time Charter Implementation Differences Analysis: A 4-launch vessel in Alaska A 2-launch vessel in Gulf Of Mexico Actual: A single 2-launch vessel; 30-Day transit between Alaska and Gulf of Mexico Analysis: Time Charter provides vessel, including staff and equipment, with limited NOAA personnel on board Actual: Time Charter provides vessel, crew, some equipment. A&E contractor provides equipment and survey personnel. NOAA provides lead hydrographers and oversight/data quality personnel 17

OCS Survey Cost Analysis Funding Outlook ($ Million) Vessel Time Charter Address Survey Backlog President’s FY06 Request President’s FY06 Request FY05 Budget with Rescissions Survey Activity 18 Misc. Surveys

OCS Survey Cost Analysis Collaboration With NMAO NOAA Office of Marine and Aviation Operations (NMAO) is initiating a cost analysis of alternatives for all NOAA Programs which use NOAA Fleet Services for data acquisition OCS can benefit from partnering with NMAO for obtaining an updated cost analysis of hydro surveys in Alaska and Gulf Of Mexico as a component of NMAO’s overall analysis 19

OCS Survey Cost Analysis Approach For the new analysis tasks, described below, OCS will select specific hydrographic surveys conducted over the period from FY 1996 through FY 2004, including only those using either multibeam sonar or side scan sonar or a combination of both. The selection process will be conducted in such a way that the analyses will be based on similar conditions (geographic area, average depth, bottom conditions, weather conditions). The survey areas planned for inclusion in the analysis are: Alaskan Waters (shallow) Alaskan Waters (deep) Gulf of Mexico 20

OCS Survey Cost Analysis Approach (Continued) The Following Tasks Are Envisioned For This Analysis: 1.Prepare a detailed cost estimate of NOAA hydrographic surveys in Alaska and the Gulf of Mexico based on the selected surveys 2.Determine the cost of NOAA contracts with the private sector for data acquisition in Alaska and the Gulf of Mexico based on the selected surveys 3.Prepare a cost estimate for conducting multibeam and side scan sonar hydrographic survey operations in Alaska and the Gulf of Mexico utilizing leased privately owned and operated vessels 4.Prepare a summary of NOAA survey support costs for each of the above methods 5.Should we be looking at other models for Time Charter (AK & GOM)? 21

OCS Survey Cost Analysis Summary Since that time:  Additional 4 years of surveys via in-house  Additional 4 years of surveys via contract  First Time Charter survey, but very different implementation  Increase in NOAA survey assets  Potential large increase in resources for ’06, with discretion on how to allocate among the strategies A good time for an updated cost analysis to support decisions on future resource allocation 22 Cost Analysis Completed in 2001 Provided First Look At Three Data Acquisition Strategies

OCS Survey Cost Analysis Hydrographic Services Improvement Act Amendments of 2002 Federal Advisory Committee Act (FACA) Request HSRP To Make Recommendations For: NOAA’s approach to cost analysis Appropriate model for the Time Charter Frequency of conducting a cost analysis 23