1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.

Slides:



Advertisements
Similar presentations
Project Cost Management
Advertisements

©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
Monitoring and Information Systems
An Overview of Earned Value Management (EVM) Using EVM to Track Progress.
CEU Making Project Management Work in the Real World.
Monitoring and Control Earned Value Management (EVM)
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Degree and Graduation Seminar Cost Management
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Monitoring and Controlling
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Using Earned Value Management System (EVMS) Briefing for ATC Engineering & Test Division (ACT-200) Managers and Leads.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
USING EARNED VALUE MANAGEMENT IN GOVERNMENT CONTRACTING
Earned Value Management
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Project Evaluation and Control
Project Management 6e..
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
9-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 9 Progress and Performance.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
Understanding Earned Value Analysis
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Project Termination and Closeout Chapter
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Earned Value Management Tutorial Module 5: EVMS Concepts and Methods Prepared by:
Department of the Interior CPIC Forum Department of the Interior CPIC Forum Better Control of Cost and Schedule Variance through Earned Value Management.
9-1 Project Management from Simple to Complex. 9-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
EARNED VALUE MANAGEMENT (EVM)
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Project Cost Management
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Project Management 6e..
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Evaluating EVM January 13, EVM Issues and Opportunities ▪ EVM Basics ▪ EVM Issues ▪ EVM ETC and EAC Calculations ▪ EVM Cost and Schedule Value Calculations.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Department of CS & Eng. MSSE Program, © Fissure 1 SOFTWARE PROJECT MANAGEMENT COURSE Executing, Monitoring and Controlling Session #7.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
0 Earned Value Management. 1  What is it?  Where did it come from?  What’s so special about it?  How do you do it?  What is an EVMS?
Copyright 2015 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
“PMP® Exam Prep” Earned Value Management
What Is It ? Why Do I Need It ? How Do I Do It?
Earned Value Management
Project Cost Management
Earned Value Management
Earned Value - What is it
Understanding Earned Value Analysis
Understanding Earned Value Analysis
What Is It ? Why Do I Need It ? How Do I Do It?
Earned Value in the Industrial Construction Setting
Monitoring and Controlling
Understanding Earned Value Analysis
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis

2 Today’s Situation Need for accurate and consistent status information Numerous complex (and interrelated) projects Projects with many WBS activities Virtual offices Diverse and integrated manufacturing processes

3 There’s Room For Improvement 70% of projects are: Over budget Behind schedule 52% of all projects finish at 189% of their initial budget And some, after huge investments of time and money, are simply never completed Source:The Standish Group

4 How to answer the question: “ Have we done what we said we’d do?” % complete estimating % of Budget spent % of work done % of time elapsed subjective, incomplete draws false conclusions

5 Enter Earned Value Analysis “Earned Value Analysis” is: an industry standard way to: measure a project’s progress, forecast its completion date and final cost, and provide schedule and budget variances along the way. By integrating three measurements, it provides consistent, numerical indicators with which you can evaluate and compare projects.

6 What’s More Important? Knowing where you are on schedule? Knowing where you are on budget? Knowing where you are on work accomplished?

7 EVA Integrates All Three It compares the PLANNED amount of work with what has actually been COMPLETED, to determine if COST, SCHEDULE, and WORK ACCOMPLISHED are progressing as planned. Work is “Earned” or credited as it is completed.

8 Earned Value is needed because... Different measures of progress for different types of tasks Need to “roll up” progress of many tasks into an overall project status Need for a uniform unit of measure (dollars or work-hours).

9 Earned Value is needed because... Provides an “Early Warning” signal for prompt corrective action. Bad news does not age well. Still time to recover Timely request for additional funds

10 And One More Reason Why You Need EVA ?

11 Because It May Be Required! These Set the Stage: GPRA; 1993 FASA, Title V; 1994 Clinger-Cohen Act; 1996 And Then Along Came OMB! (Circular A-11, Part 7) "Agencies must use a performance based acquisition management system, based on ANSI/EIA Standard 748, to measure achievement of the cost, schedule, and performance goals."

12 OK, So What Is This Stuff?

13 So, Is This Stuff New ? It’s been around since the sixties. “Cost/Schedule Control Systems Criteria” (C/SCSC)

14 Examples of Informal Earned Value Analysis It’s done informally without realizing it. 30% time used, 30% $$ spent So, if 30% of the work is done, I must be OK ?? Shop floor estimates Cost comparisons Budget vs. Actual

15 How’s This Project Doing?

16 Let’s Take A Look Under The Hood

17 But First! - We Must Get Organized EVA works best when work is ‘compartmentalized’. Compartmentalization is best achieved with a well- planned Work Breakdown Structure. So, how do I create a WBS for a really complex project?

18 Proper WBS Design One WBS per program Deliverable-oriented Work not in the WBS is out-of-scope Each descending level represents more detail Full (and accurate) definition is key Defined deliverable(s) Timeframe for delivery of product Total cost (direct and indirect) to deliver product Let’s Look at an example:

19 A Sample Work Breakdown Structure Serve Pizzas to Customers Provide the PlaceCook the FoodServe Customers(Others) Cook the SauceMake the DoughBuild the Pizza

20 WBS Units are “Work Packages” Lowest level WBS elements Have an accompanying narrative Have three measurable components Scope of work to be accomplished Total (direct and indirect) cost Timeframe for completion

21 Control Account Plans A CAP is essentially a Work Package with some added features:  Assignment of responsibility Organization Individual  Division (if necessary) into lower-level Work Packages.  Metrics for measuring EV performance Milestones % complete Other  The sum of the CAPs constitutes the Performance Measurement Baseline

22 Some New Terms PV – Planned Value AC - Actual Cost EV – Earned Value

23 Earned Value Definitions PV: “Planned Value” Planned cost of the total amount of work scheduled to be performed by the milestone date.

24 PV – Planned Value or Budgeted Cost of Work Scheduled

25 Earned Value Definitions (cont.) AC: “Actual Cost of Work Performed” Cost incurred to accomplish the work that has been done to date.

26 ACWP - Actual Cost of Work Performed

27 Earned Value Definitions (cont.) EV: Earned value or Budgeted Cost of Work Performed The planned (not actual) cost to complete the work that has been done.

28 EV- Earned Value or Budgeted Cost of Work Performed

29 The Whole Story

30 Some Derived Metrics SV: Schedule Variance (EV-PV) A comparison of amount of work performed during a given period of time to what was scheduled to be performed. A negative variance means the project is behind schedule CV: Cost Variance (EV-AC) A comparison of the budgeted cost of work performed with actual cost. A negative variance means the project is over budget.

31 Schedule Variance & Cost Variance Schedule Variance = EV-PV $49, ,000 SV = - $ 6,000 Cost Variance = EV-AC $49,000 56,000 CV = - $7,000

32 SPI: Schedule Performance Index SPI=EV/PV If SPI<1 means project is behind schedule CPI: Cost Performance Index CPI= EV/AC If CPI<1 means project is over budget CSI: Cost Schedule Index ( CSI=CPI x SPI) The further CSI is from 1.0, the less likely project recovery becomes. Some More Derived Metrics

33 Performance Metrics SPI: EV/PV 49,000/55,000 = CPI: EV/AC 49,000/56000 = CSI: SPI x CPI.891 x.875 = 0.780

34 Making Projections Once a project is 10% complete, the overrun at completion will not be less than the current overrun. Once a project is 20% complete, the CPI does not vary from its current value by more than 10%. The CPI and SPI are statistically accurate indicators of final cost results. Source: Defense Acquisition University

35 Making Projections Today

36 Estimate to Complete Today

37 A New Criteria Activities “earn value” as they are completed. The value earned is the WBS budgeted cost of the activity completed to date.

38 Value of Earned Value Schedule Status Reporting Cost Status Reporting Forecasting

39 But How Do I Do All This Stuff ? With an Earned Value Management System

40 Requirements of Earned Value Proper WBS Design Baseline Budget Control Accounts Baseline Schedule Work measurement by Control Account work-hours, dollars, units, etc. Good Project Management Practices

41 Shortcomings of Earned Value Quantifying/measuring work progress can be difficult. Time required for data measurement, input, and manipulation can be considerable.

42 Summary EVA & EVMS will help reduce guesswork in: Measuring performance forecasting Need to get beyond misleading measures of progress. Reasons to use EVA and EVMS: Good project management practice OMB requirement Incorporate into contracts

43 Earned Value Resources ANSI/EIA 748 is available from: Global Engineering Documents

44 Earned Value Analysis Questions/Discussion