3. 7 MBPF. Orange Juice Inc. produces and markets fruit juice

Slides:



Advertisements
Similar presentations
Intermediate Process Analysis Capacity and Inventory Buildup Why is capacity important? What determines capacity and thruput? Inventory buildup to match.
Advertisements

Storage Reservoirs for Urban Water Supply/Chapter 9 LowLift Intake Conduit Treatment High Lift ConveyanceConduit DISTRIBUTIONRESERVOIR Distribution Supply.
Problem1; Admission Flow
Process Flow Thinking 1. Overview Process flow is about how the product or service is made. Some measures we will want to study include: Throughput time,
Process Flow Analysis The Little’s Law The main source for preparing these slides is Managing Business Process Flow Anupindi, Chopra, Deshmoukh, Van.
Capacity Planning and Queuing Models
Three Key Process Measures: Flow Rate
OPSM 301 Operations Management
1 3. Process Flow Measures Problem 1 (a) 1. Time Travelers Insurance Company (TTIS) processes 12,000 claims per year. The average processing time is 3.
OPSM 301: Operations Management Session 12: Service processes and flow variability Koç University Graduate School of Business MBA Program Zeynep Aksin.
Process Design and Analysis
11–1. 11–2 Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Building Lean Systems Takt Time
National Cranberry Cooperative
INDR 343 Problem Session
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Capacity Planning and Queuing Models.
Queuing Models M/M/k Systems. CLASSIFICATION OF QUEUING SYSTEMS Recall that queues are classified by (Arrival Dist.)/(Service Dist.)/(# servers) Designations.
LOGO Process Flow Measures MM – OM Session 2a Henry Yuliando.
Queuing Models Basic Concepts
Histograms & Summary Data.  Summarizing large of amounts of data in two ways: Histograms: graphs give a pictorial representation of the data Numerical.
SimLean Educate Interlude 2: Prioritising patients An example of a generalised simulation of a theatre process.
14-1. Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 14 Capacity Planning and Queuing Models.
OM&PM/Class 6b1 1Operations Strategy 2Process Analysis 3Lean Operations 4Supply Chain Management 5Capacity Management in Services –Class 6b: Capacity Analysis.
QUEUING MODELS Queuing theory is the analysis of waiting lines It can be used to: –Determine the # checkout stands to have open at a store –Determine the.
Problem 3.4 MBPF A hospital emergency room (ER) is currently organized so that all patients register through an initial check-in process. At his or her.
1 3. Process Flow Measures Assignment, Problem 1 Solution 1. Bank XYZ receives 20 loan requests per hour on average. Each loan request goes through an.
Queuing Models and Capacity Planning
Micro Design. System Capacity D = gross application for what ever time period ( hrs, day or days) T= hours in time period used to decide “D” (max.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 6 Process Analysis.
OPSM 301: Operations Management
The Essence of Process Flow Process Measures
1 Chapter 5 Flow Lines Types Issues in Design and Operation Models of Asynchronous Lines –Infinite or Finite Buffers Models of Synchronous (Indexing) Lines.
Operations management using System Dynamics Part II.
Topic 3: Fiscal Policy Circular Flow Keynesian Economics Taxes and Government Spending 1.
OPSM 301 Operations Management Class 2: Business process flows: Measurement Koç University Zeynep Aksin
1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.
Chapter 16 Capacity Planning and Queuing Models
1 Queuing Systems (2). Queueing Models (Henry C. Co)2 Queuing Analysis Cost of service capacity Cost of customers waiting Cost Service capacity Total.
OMG Operations Management Spring 1997 CLASS 4: THE IMPACT OF VARIABILITY Harry Groenevelt.
1 3. Process Flow Measures A hospital emergency room (ER) is currently organized so that all patients register through an initial check-in process. At.
B-Trees. Motivation for B-Trees So far we have assumed that we can store an entire data structure in main memory What if we have so much data that it.
Process Scheduling, Resource & Inventory Tracking.
1 The Geometry of Linear Programs –the geometry of LPs illustrated on GTC Handouts: Lecture Notes February 5, 2002.
Components of AP Pax Bldgs Slide 1 of 27 / RdN © Design of Components of Airport Passenger Buildings Richard de Neufville Professor of Engineering Systems.
Homework Assignment Simulation Modeling The Cobbler Problem MGMT E Operations and Logistics Management Due September 25 th.
Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted by Gerard.
Trauma center moves to diversion status once all servers are busy (incoming patients are directed to other locations) Figure 7.1.: Process flow diagram.
1 By: Prof. Y. Peter Chiu POM Chap-8: Scheduling ~ Homework Problems ~
Famous Frank’s Queuing Michael Dettloff- Sam Ross Marc
Intermediate 1Unit 2 Outcome 2 Speed Distance Time 8 Lessons S D T.
1 3. Process Flow Measures 1. Coffee Shop You enter a Starbucks coffee shop. You have experienced that in this time of day the entrance door opens two.
PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)
Assoc. Prof. Dr. Tarkan Erdik
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
Example: A Hospital Emergency Room
FLOOD ROUTING Topic 5 River/Stream Routing Muskingum Method.
Process Analysis Guanyi Lu September 18, 2018.
Every minutes one customer comes in and one customer leaves.
Chapter 5 Process Analysis.
Transportation Engineering Basic Queuing Theory February 18, 2011
How long must the plant operate on peak days?
Problem 8.3 John Doe has promised a total service time of 20 minutes. Processing time at the oven = 15 min Preparation = 2 min At most 3 minutes waiting.
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Capacity rate = 100 customers/hour Input Rate Customers/hour Time 12pm 2pm 10am Capacity rate = 100 customers/hour Inventory Waiting.
Overview of Record Keeping
GATORADE MX Production
Elapsed Time Using Benchmarks.
Presentation transcript:

3. 7 MBPF. Orange Juice Inc. produces and markets fruit juice 3.7 MBPF. Orange Juice Inc. produces and markets fruit juice. During the orange harvest season, trucks bring oranges from the fields to the processing plant during a workday that runs from 7 a.m. to 6 p.m. On peak days, approximately 10,000 kilograms or oranges are trucked in per hour. Trucks dump their contents in a holding bin with a storage capacity of 6,000 kilograms. When the bin is full, incoming trucks must wait until it has sufficient available space. A conveyor moves oranges from the bins to the processing plant. The plant is configured to deal with an average harvesting day, and maximum throughput (flow rate) is 8,000 kilograms per hour. Assuming that oranges arrive continuously over time, construct an inventory buildup diagram for Orange Juice Inc. In order to process all the oranges delivered during the day, how long must the plant operate on peak days? (Assume, too, that because Orange Juice Inc. makes fresh juice, it cannot store oranges.) Assuming, finally, that each truck holds about 1,000 kilograms of oranges, at what point during the day must a truck first wait before unloading into the storage bin? What is the maximum amount of time that a truck must wait? How long will trucks wait on average? Among trucks that do wait, how long is the average wait?

Directions o) Assume a truck as your flow unit. a) How long must the plant operate on peak days? b) At what point during the day must a truck first wait before unloading into the storage bin? c) What is the maximum amount of time that a truck must wait? d) Among trucks that wait, how long is the average wait? e) How long a truck wait on the average?  

3.7 (a) How long must the plant operate on peak days? From 7am-6pm oranges come in at a rate of 10,000kg/hr are processed leave the plant, at 8000kg/hr Because inflows exceed outflows, inventory will build up at a rate of DR = 10,000-8,000kg/hr = +2,000 kg/hr. Because we cannot have oranges stored overnight, we start with an empty plant so that inventory at 7am is zero: I (7 am) = 0. Because inventory builds up linearly at 2,000kg/hr, the inventory at 6pm is I(6pm) = 2,000 kg/hr * 11 hr = 22,000kg.

3.7 (a) How long must the plant operate on peak days? After 6pm, no more oranges come in Yet processing continues at 8000 kg/hr until the plant is empty. Thus, inflows is less than outflows so that inventory is depleted at a rate of DR = 0 - 8,000 kg/hr = - 8,000 kg/hr. We have I(6pm) = 22,000kg Inventory depletes linearly from that level at a rate of -8,000 kg/hr. To empty the plant, 22,000 kg = 8,000 kg/hr Dt or Dt = 22,000/8,000 hr = 2.75 hr = 2 hr 45min. Thus, the plant must operate until 6pm + 2hr 45min = 8:45pm. This can all be graphically summarized in the inventory build up diagram shown below.

3.7 (a) Inventory built-up diagram Bin capacity 6,000 kg Inventory I ( t ) 22,000 kg 6 pm 8:45 7 am Bin is full: First truck waits Last truck leaves

3.7 (b) and (c) b) At what point during the day must a truck first wait before unloading into the storage bin? Inventory builds up in the bins. When the bin is full, then the trucks must wait. This happens at: 2,000 kg/hr Dt = 6,000kg, The first truck will wait after Dt = 6,000/2,000 hr = 3 hr, which is at 10am. c) What is the maximum amount of time that a truck must wait? The last truck that arrives (at 6pm) joins the longest queue, and thus will wait the longest. It will be able to start dumping its contents in the bins when the bins start depleting. This is at 22,000 kg - 8,000 kg/hr Dt = 6,000. Dt = (22,000-6,000)/8,000 hr = 2 hr, after 6pm. The maximum truck waiting time is therefore 2 hours, and that is 8pm.

Truck Inventory 16 7 am 10 am 6 pm 8 pm

3.7 (d) d) Among trucks that wait, how long is the average wait? Procedure1: The first truck among those that wait, will wait for 0 hour. The last truck among those that wait, will wait for 2 hours. On average a truck waits for (0+2)/2 = 1 hour Procedure2: The maximum inventory is 22,000. But 6000 of it is in the bin. So the waiting inventory on trucks has a maximum of 22,000 – 6,000 = 16,000 Therefore, the average inventory for those trucks that wait is 8,000. This inventory is depleted at the rate of 8000/hrs I = RT 8,000 = 8000T T = 8000/8000 = 1 hour

3.7 (e) e) How long a truck wait on the average? The average wait among trucks that wait is 1 hour. But this is for the last 8 hours of the day. In the first 3 hours no truck waits. Therefore the average wait is 0 hour. Therefore, the average wait among all trucks is (3×0 + 8×1)/11 = 0.727 hour or 43.6 minutes