November 21, 2002Luca Vaccarossa INFN - Milano1 Interoperability Demos and Atlas applications Luca Vaccarossa (INFN - Milano) ATLAS Software Workshop 21/11/2002.

Slides:



Advertisements
Similar presentations
WP1 Grid Workload Management Massimo Sgaravatto INFN Padova
Advertisements

CHEP 2000, Roberto Barbera Roberto Barbera (*) GENIUS: a Web Portal for the GRID Meeting Grid.it, Bologna, (*) work in collaboration.
Claudio Grandi INFN Bologna DataTAG WP4 meeting, Bologna 14 jan 2003 CMS Grid Integration Claudio Grandi (INFN – Bologna)
ATLAS/LHCb GANGA DEVELOPMENT Introduction Requirements Architecture and design Interfacing to the Grid Ganga prototyping A. Soroko (Oxford), K. Harrison.
1 CHEP 2000, Roberto Barbera Recent grid activities at INFN Catania (*) HEPiX/HEPNT 2002, Catania, (*) work in collaboration with.
CHEP 2000, Roberto Barbera The AliEn GENIUS interface ALICE Offline Week, CERN, Università di Catania and INFN Catania - Italy ALICE.
EU 2nd Year Review – Jan – Title – n° 1 WP1 Speaker name (Speaker function and WP ) Presentation address e.g.
Workload management Owen Maroney, Imperial College London (with a little help from David Colling)
LNL CMS M.Biasotto, Bologna, 29 aprile LNL Analysis Farm Massimo Biasotto - LNL.
Evaluation of the Globus Toolkit: Status Roberto Cucchi – INFN Cnaf Antonia Ghiselli – INFN Cnaf Giuseppe Lo Biondo – INFN Milano Francesco Prelz – INFN.
Job Submission The European DataGrid Project Team
CMS HLT production using Grid tools Flavia Donno (INFN Pisa) Claudio Grandi (INFN Bologna) Ivano Lippi (INFN Padova) Francesco Prelz (INFN Milano) Andrea.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
DataGrid Kimmo Soikkeli Ilkka Sormunen. What is DataGrid? DataGrid is a project that aims to enable access to geographically distributed computing power.
GRID Workload Management System Massimo Sgaravatto INFN Padova.
Workload Management Massimo Sgaravatto INFN Padova.
The EDG Testbed Deployment Details The European DataGrid Project
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
HEP Experiment Integration within GriPhyN/PPDG/iVDGL Rick Cavanaugh University of Florida DataTAG/WP4 Meeting 23 May, 2002.
F.Fanzago – INFN Padova ; S.Lacaprara – LNL; D.Spiga – Universita’ Perugia M.Corvo - CERN; N.DeFilippis - Universita' Bari; A.Fanfani – Universita’ Bologna;
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
Computational grids and grids projects DSS,
SLICE Simulation for LHCb and Integrated Control Environment Gennady Kuznetsov & Glenn Patrick (RAL) Cosener’s House Workshop 23 rd May 2002.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid WP1 Massimo Sgaravatto INFN Padova. WP1 (Grid Workload Management) Objective of the first DataGrid workpackage is (according to the project "Technical.
Nadia LAJILI User Interface User Interface 4 Février 2002.
1 DIRAC – LHCb MC production system A.Tsaregorodtsev, CPPM, Marseille For the LHCb Data Management team CHEP, La Jolla 25 March 2003.
05/23/2002Flavia Donno, INFN-Pisa1 DataTAG experiment grid integration plan Flavia Donno, INFN-Pisa DataTAG/iVDGL joint meeting, May 2002.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
27-28 August 2002Flavia Donno, INFN-Pisa1 Report on GLUE activities Flavia Donno, INFN-Pisa EDG Retreat August 2002.
A monitoring tool for a GRID operation center Sergio Andreozzi (INFN CNAF), Sergio Fantinel (INFN Padova), David Rebatto (INFN Milano), Gennaro Tortone.
Grid Workload Management Massimo Sgaravatto INFN Padova.
- Distributed Analysis (07may02 - USA Grid SW BNL) Distributed Processing Craig E. Tull HCG/NERSC/LBNL (US) ATLAS Grid Software.
CMS Stress Test Report Marco Verlato (INFN-Padova) INFN-GRID Testbed Meeting 17 Gennaio 2003.
November SC06 Tampa F.Fanzago CRAB a user-friendly tool for CMS distributed analysis Federica Fanzago INFN-PADOVA for CRAB team.
DataTag is a project funded by the European UnionCHEP 2003 – March The WorldGRID transatlantic testbed A successful example of Grid interoperability.
TERENA 2003, May 21, Zagreb TERENA Networking Conference, 2003 MOBILE WORK ENVIRONMENT FOR GRID USERS. TESTBED Miroslaw Kupczyk Rafal.
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
29/1/2002A.Ghiselli, INFN-CNAF1 DataTAG / WP4 meeting Cern, 29 January 2002 Agenda  start at  Project introduction, Olivier Martin  WP4 introduction,
CERN, DataGrid PTB, April 10, 2002 CrossGrid – DataGrid Collaboration (Framework) Marian Bubak and Bob Jones.
High-Performance Computing Lab Overview: Job Submission in EDG & Globus November 2002 Wei Xing.
EGEE-0 / LCG-2 middleware Practical.
DataTAG: Glue schema test C.Vistoli DataTAG Wp4 Meeting 23/5/2002.
1 DataTAG-WP4 and GLUE ( mainly from A.Ghiselli II INFN-Grid workshop) Mirco Mazzucato Gridstart meeting at HPC Cetraro.
6 march Building the INFN Grid Proposal outline a.ghiselli,l.luminari,m.sgaravatto,c.vistoli INFN Grid meeting, milano.
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
INFN - Ferrara BaBar Meeting SPGrid: status in Ferrara Enrica Antonioli - Paolo Veronesi Ferrara, 12/02/2003.
Grid Workload Management (WP 1) Massimo Sgaravatto INFN Padova.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
DataTAG is a project funded by the European Union International School on Grid Computing, 23 Jul 2003 – n o 1 GridICE The eyes of the grid PART I. Introduction.
Planning Session. ATLAS(-CMS) End-to-End Demo Kaushik De is the Demo Czar Need to put team together Atlfast production jobs –Atlfast may be unstable over.
EGEE is a project funded by the European Union under contract IST GENIUS and GILDA Guy Warner NeSC Training Team Induction to Grid Computing.
Massimo Sgaravatto INFN Padova
Workload Management Workpackage
The EDG Testbed Deployment Details
U.S. ATLAS Grid Production Experience
Introduction to Grid Technology
Gridifying the LHCb Monte Carlo simulation system
5. Job Submission Grid Computing.
EDT-WP4 monitoring group status report
CMS report from FNAL demo week Marco Verlato (INFN-Padova)
U.S. ATLAS Testbed Status Report
LCG experience in Integrating Grid Toolkits
Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002
Report on GLUE activities 5th EU-DataGRID Conference
Status of Grids for HEP and HENP
Presentation transcript:

November 21, 2002Luca Vaccarossa INFN - Milano1 Interoperability Demos and Atlas applications Luca Vaccarossa (INFN - Milano) ATLAS Software Workshop 21/11/2002 CERN - Genève

November 21, 2002Luca Vaccarossa INFN - Milano2 Layout of Talk Goals of EU-US joint Testbed Testbed Infrastructure Screenshots of Monitoring Tools Distribution of Atlas Software Description of the Demo Submission Conclusions

November 21, 2002Luca Vaccarossa INFN - Milano3 Joint EU-US grid demos IST November, Copenaghen SC November, Baltimore Goals of WorldGrid Testbed : Interoperability between grid domains for applications submitted by users from different virtual organizations The testbed should provide a grid-integrated infrastructure of middleware software transparent to the higher layers so that applications on EU and US could run as they did before the integration, without major modifications.

November 21, 2002Luca Vaccarossa INFN - Milano4 Joint EU-US grid demos The testbed should be heterogeneous supporting various flavors of RH and various flavors of the basic Globus services declared to be interoperable. Controlled use of shared resources subject to agreed policy Integrated use of heterogeneous resources from iVDGL, EDG and CrossGrid testbed domains

November 21, 2002Luca Vaccarossa INFN - Milano5 WorldGrid Shared Global Resources, Interoperability, Policy

November 21, 2002Luca Vaccarossa INFN - Milano6 DataTAG WP4 WorldGrid Team DataTAG WP4 Main Subject: Interoperability between EU and US Grids services from DataGrid, GriPhyN, PPDG and in collaboration with iVDGL, for the HEP applications. WP Manager A. Ghiselli INFN -CNAF DataTAG WP4 Task Force for Demos Testbed Setup Coordinated by Flavia Donno (CERN) David Rebatto INFN - Milano Sergio Fantinel INFN - LNL Gennaro Tortone INFN - Napoli Federica Fanzago INFN - LNL Marco Verlato INFN - Padova Vincenzo Ciaschini INFN - CNAF Luca Vaccarossa INFN - Milano

November 21, 2002Luca Vaccarossa INFN - Milano7 WorldGrid Testbed Infrastructure Two EDG Resource Broker available (Milano and Pisa), each one with a related EDG Information Index (Milano and Pisa) running MDS 2.2 One central EDG Resource Broker “Glue-aware” (CNAF-Bologna) EDG and CG Computing and Storage Elements with the EDG and GLUE schema and Information Providers VDT servers serving as Computing and Storage Elements with the EDG and GLUE schema and Information Providers

November 21, 2002Luca Vaccarossa INFN - Milano8 WorldGrid Testbed Infrastructure PBS, LSF and Condor-G as LRM but only PBS and LSF used with RB. Multiple UI running EU and US portals such as Genius and Grappa (Pisa, ANL, Padova, CNAF-Bologna)

November 21, 2002Luca Vaccarossa INFN - Milano9 UIGenius/Grappa RB/JSS II/MDS2.2 Replica Catalogue VDT Servers CE SE World-Grid Infrastructure

November 21, 2002Luca Vaccarossa INFN - Milano10 The WorldGrid Testbed

November 21, 2002Luca Vaccarossa INFN - Milano11 Monitoring Tools Nagios – Sergio Fantinel, Gennaro Tortone (DataTAG) Ganglia - Catalin Dumitrescu (University of Chicago) VO Centric

November 21, 2002Luca Vaccarossa INFN - Milano12 Nagios Monitoring

November 21, 2002Luca Vaccarossa INFN - Milano13 Nagios Monitoring

November 21, 2002Luca Vaccarossa INFN - Milano14 Ganglia Monitoring

November 21, 2002Luca Vaccarossa INFN - Milano15 Distribution of Atlas SW Starting from RPM distribution for Atlas software, Version Release 2 from EDG repository ● Atlas kit rpm pacman-ized (Atlas-kit.pacman) for US sites ● Included additional Components needed at run-time missing in many US sites (LessTif, zsh) ● Distributed as part of ScienceGrid Cache ● Installation check package Atlas-kit-verify

November 21, 2002Luca Vaccarossa INFN - Milano16 US SitesEU Sites Gainesville/FL (VDT)Milano/Italy (EDG) Milwaukee/WI (VDT)Padova/Italy (EDG) Batavia/IL (VDT)Geneve/Switzerland (EDG) Bloomington/IN (VDT)Valencia/Spain (CG) Karlsruhe/Germany (CG) Lisbone/Portugal (CG) Sites where Atlas- kit has been installed Distribution of Atlas SW

November 21, 2002Luca Vaccarossa INFN - Milano17 Demo Submission Script Executable = "/usr/bin/env"; Arguments = "zsh prod.dc "; StdOutput = " dc test hlt.pythia_jet_17.log"; StdError = "dc test hlt.pythia_jet_17.err"; InputSandbox={"prod.dc1","dc evgen.0001.hlt.pythia_jet_ 17.root","plot.kumac"}; OutputSandbox = {"dc test hlt.pythia_jet_17.log", "dc test hlt.pythia_jet_17.his", "dc test hlt.pythia_jet_17.err","plot.kumac"}; Rank = other.FreeCPUs; Requirements = IsMember(other.RunTimeEnvironment,"ATLAS ");

November 21, 2002Luca Vaccarossa INFN - Milano18 Demo Submission Script Simulation of 10 events Based on DC1 Grid script Datafile of 1.7 MB sent trough RB InputSandbox Requirements = (RunTimeEnvironment, "ATLAS-3.2.1”) Rank FreeCPUs Trough Genius Portal

November 21, 2002Luca Vaccarossa INFN - Milano19 Matchmaking by EDG RB # dg-job-list-match dc1_part1.jdl The following CE(s) matching your job requirements have been found: - grid001.mi.infn.it:2119/jobmanager-pbs-workq - grid011.pd.infn.it:2119/jobmanager-lsf-datatag - ufdemo.phys.ufl.edu:2119/jobmanager-pbs-Long - lxshare0229.cern.ch:2119/jobmanager-pbs-short - lxshare0229.cern.ch:2119/jobmanager-pbs-medium - lxshare0229.cern.ch:2119/jobmanager-pbs-long - - worldgrid.iu.edu:2119/jobmanager-pbs-Long20 - worldgrid.iu.edu:2119/jobmanager-pbs-Long - ricci.phys.uwm.edu:2119/jobmanager-pbs-Long - nest.phys.uwm.edu:2119/jobmanager-pbs-Long - lngrid02.lip.pt:2119/jobmanager-pbs-qgrid - handsome.dhcp.fnal.gov:2119/jobmanager-pbs-Long - bee001.ific.uv.es:2119/jobmanager-pbs-qgrid

November 21, 2002Luca Vaccarossa INFN - Milano20 GENIUS (Grid Enabled web eNvironment for site Independent User job Submission) [ OS & Net services Basic Services High level GRID middleware ALICEATLASCMSLHCb Applications’ specific layer Other apps GLOBU S toolkit DataGRID architecture GENIUS web portal Demo Submission

November 21, 2002Luca Vaccarossa INFN - Milano21

November 21, 2002Luca Vaccarossa INFN - Milano22

November 21, 2002Luca Vaccarossa INFN - Milano23

November 21, 2002Luca Vaccarossa INFN - Milano24

November 21, 2002Luca Vaccarossa INFN - Milano25

November 21, 2002Luca Vaccarossa INFN - Milano26

November 21, 2002Luca Vaccarossa INFN - Milano27

November 21, 2002Luca Vaccarossa INFN - Milano28

November 21, 2002Luca Vaccarossa INFN - Milano29 Demo Submission Job executed at remote Cluster dg-job-status retrieves job status (Ready, Scheduled, etc.) when Status = OutputReady dg-job-get-output JobID Output sandbox files for the job is retrieved and stored in a local directory

November 21, 2002Luca Vaccarossa INFN - Milano30

November 21, 2002Luca Vaccarossa INFN - Milano31 Demo Submission Job Output: Standard output & error Histogram file of 190 KB Interactive Session Genius Interactive Services PAW

November 21, 2002Luca Vaccarossa INFN - Milano32

November 21, 2002Luca Vaccarossa INFN - Milano33

November 21, 2002Luca Vaccarossa INFN - Milano34

November 21, 2002Luca Vaccarossa INFN - Milano35

November 21, 2002Luca Vaccarossa INFN - Milano36 Conclusions The demo has been successful and has demonstrated smooth execution of ATLAS applications on the integrated testbed Many interested users and many sites available to join DataManagement not fully exploited but possible (yet tested) Possibility to enlarge pool of resources for next phases of DC1