© BMA Inc. 2009. All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.

Slides:



Advertisements
Similar presentations
Understanding Value Stream Decision Making
Advertisements

© BMA Inc All rights reserved. Lean decision making Box score.
© BMA Inc All rights reserved. Decision-making Making routine decisions without the help of standard costs.
How to Talk to Accounting about Lean* Dave Turbide, CFPIM, CMfgE, CIRM, CSCP * Version 3.
Chapter 15: Performance Evaluation and Compensation
Planning Production Activity Preview Planning Manufacturing Facilities Quantitative Tools in Production Planning Production Planning and Control Flexible.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Process Selection and Facility Layout
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Cost Analysis for Control
Copyright © 2007 Prentice-Hall. All rights reserved 1 Special Business Decisions and Capital Budgeting Chapter 25.
Process Analysis and Applications Module
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
Pricing Decisions EMBA 5411 Budgeting and Pricing.
Financial and Managerial Accounting
16-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Financial Performance Evaluation and Transfer Pricing in the Decentralized Firm.
C H A P T E R 9 Evaluating Personnel and Divisions.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 4 How Businesses Work.
Operations Planning Horizons
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 4 How Businesses Work McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Financial benefits of lean improvement
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
2.10 Entrepreneurship I.  A category of expenditure that a business incurs as a result of performing its normal business operations.  Examples include:
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
© BMA Inc All rights reserved. Understand why traditional accounting, control & measurement methods need to change as the company continues the.
Accounting Principles, Ninth Edition
Managing by value stream
1 The budgeting process The traditional goals of the planning and control process are: - to identify the economic goals and how to achieve them - to measure.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
© BMA Inc All rights reserved. Value stream costing Lean reporting & control.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
© John Wiley & Sons, 2005 Chapter 15: Performance Evaluation and Compensation Eldenburg & Wolcott’s Cost Management, 1eSlide # 1 Cost Management Measuring,
1 Manufacturing Cost Accounting
© BMA Inc All rights reserved. Inventory valuation Lean reporting & control.
Cost Concepts and Behavior
2.10 Entrepreneurship I.  A category of expenditure that a business incurs as a result of performing its normal business operations.  Examples include:
Business management is frequently faced with making decisions about price. How will I set prices? What should pricing accomplish? What about “loss-leaders”?
© 2013 South-Western, a part of Cengage Learning. All rights reserved. Chapter 8 | Slide 1 Production, Operations Planning, Quality Chapter8.
W. BentzEMBA 8021 Agenda Today Review some chapter 12 ideas Outline transfer pricing issues Go over EVA case Outsource, Inc.
Short-Run Decision Making; Relevant Costing and Inventory Management Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western,
Differential Analysis and Product Pricing Chapter 12.
Costing and accounting system Session 1-2. Types of inventory Direct material ▫Which represent direct material in inventory awaiting manufacture. Work.
© BMA Inc All rights reserved. Decision Making.
© 2012 Pearson Prentice Hall. All rights reserved. Using Costs in Decision Making Chapter 3.
Lean Accounting for the Lean Enterprise 2-Day Workshop
© 2012 Pearson Prentice Hall. All rights reserved. Financial Control Chapter 11 – Transfer Pricing.
1 Chapter 16 Relevant Costs and Benefits for Decision Making.
© 2009 Factory Strategies Group LLC. All rights reserved. Manufacturing Cost Accounting Enterprise Excellence Series.
© BMA Inc All rights reserved. The Value Stream Managing by value stream.
Implementing Lean Accounting Making it happen © BMA Inc All rights reserved.
© BMA Inc All rights reserved. Lean reporting & control Performance Measurements.
© BMA Inc All rights reserved. Financial benefits of lean improvement Lean planning.
Crosson Needles Managerial Accounting 10e Short-Run Decision Analysis 9 C H A P T E R © human/iStockphoto ©2014 Cengage Learning. All Rights Reserved.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Pricing Decisions and Cost Management Chapter 12.
Ratio Analysis…. Types of ratios…  Performance Ratios: Return on capital employed. (Income Statement and Balance Sheet) Gross profit margin (Income Statement)
20-1   Info often reported in a CVP income statement.   CVP income statement is for internal use only: ► ► Costs and expenses classified as fixed or.
Chapter 7: Manufacturing Processes
Operational Objectives
Managerial accounting
Operating and Financial Leverage
Value Stream Costing Mahmoud Al-Odeh, PhD Bemidji State University.
© 2017 by McGraw-Hill Education
Fundamental Cornerstones of Managerial Accounting Chapter Six
Implement expense-control strategies
Operating and Financial Leverage
Decentralization and Performance Evaluation
© 2017 by McGraw-Hill Education
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs

© BMA Inc All rights reserved. Value Stream Costing is simple, understandable, and economical But …… How do I make business decisions without having standard costs for every part? Pricing, margins, make/buy, product mix, ……. ?? Lean decision-making

© BMA Inc All rights reserved. What do we use standard costs for? Pricing & quoting Make/buy and sourcing Capital equipment decisions Impact of improvements Variance analysis and performance measurements Inventory valuation Transfer pricing Profitability analysis and “rationalization” External financial reporting

© BMA Inc All rights reserved. Product Costing Drill on Drilling Machine Machine on Lathe Grind Inspect & Pack A. 6 minutes A. 4 minutesA. 8 minutes A. 12 minutes 5 per hour Total Value Stream Cost per Hour = £500 Material Cost = £75 per unit Price = £350 per unit What is the cost Product A?

© BMA Inc All rights reserved. A Second Product in the Value Stream Drill on Drilling Machine Machine on Lathe Grind Inspect & Pack B. 10 minutes A. 6 minutes A. 4 minutes B. 10 minutes A. 8 minutes B. 12 minutes A. 12 minutes 5 per hour Total Value Stream Cost per Hour = £500 Material Cost = £75 per unit Price = £350 per unit Product B is a lot more difficult to make and has a lot more labor & machine time. What is the cost of Product B?

© BMA Inc All rights reserved. What About the Volume of Production? Drill on Drilling Machine Machine on Lathe Grind Inspect & Pack B. 10 minutes A. 6 minutes A. 4 minutes B. 10 minutes A. 8 minutes B. 12 minutes A. 12 minutes 5 per hour Total Value Stream Cost per Hour = £500 Material Cost = £75 per unit Price = £350 per unit This week the customers require 400 units of A’s or B’s. Takt time is 12 minutes. The cost of A or B is £175 /unit.

© BMA Inc All rights reserved. What About the Volume of Production? Drill on Drilling Machine Machine on Lathe Grind Inspect & Pack B. 10 minutes A. 6 minutes A. 4 minutes B. 10 minutes A. 8 minutes B. 12 minutes A. 12 minutes 5 per hour Total Value Stream Cost per Hour = £500 Material Cost = £75 per unit Price = £350 per unit But next week, the customers only require 360 A’s & B’s. What is the cost of an A or a B ? There is no such thing as THE cost of a product. It varies by production volume and mix.

© BMA Inc All rights reserved. A Third Product in the Value Stream Drill on Drilling Machine Machine on Lathe Grind Inspect & Pack C. 6 minutes B. 10 minutes A. 6 minutes A. 4 minutes B. 10 minutes C. 4 minutes A. 8 minutes B. 12 minutes C. 6 minutes C. Zero minutes B. 12 minutes A. 12 minutes 5 per hour Total Value Stream Cost per Hour = £500 Material Cost = £75 per unit Price = £350 per unit Product C does not use the Drilling Machine, but does go thru the lathe, the grinding machine, and inspect/pack. What is the cost of Product C (assuming there is capacity to make it)? Everything else remaining the same, product cost is determined by the flow rate through the bottleneck work center.

© BMA Inc All rights reserved. Now We Do Some More Lean Improvement Drill on Drilling Machine Machine on Lathe Grind Inspect & Pack B. 10 minutes A. 6 minutes A. 4 minutes B. 10 minutes A. 8 minutes B. 12 minutes A. 12 minutes 5 per hour Total Value Stream Cost per Hour = £500 Material Cost = £75 per unit Price = £350 per unit The value stream improvement team conducts a kaizen and eliminates waste from the Drilling operation. They open up 20% more capacity. The customer demand is still 400 per week. What is the cost of A or B? 20% More Capacity

© BMA Inc All rights reserved. A Sales Opportunity ???? Drill on Drilling Machine Machine on Lathe Grind Inspect & Pack B. 10 minutes A. 6 minutes A. 4 minutes B. 10 minutes A. 8 minutes B. 12 minutes A. 12 minutes 5 per hour Total Value Stream Cost per Hour = £500 Material Cost = £75 per unit Price = £350 per unit The sales department can not find any more demand for A’s & B’s – at least in the short term. It will stay at 400 per week for the foreseeable future. But, they have found a customer wanting a D. The D product is very similar to A. Same production routing and same material cost. The customer needs 40 per week. The market price for D’s is £160. Should they accept this order? 20% More Capacity

© BMA Inc All rights reserved. Example Given this annual cost information, calculate the Labor Rate (£ per labor hour) and Overhead Rate (as a percentage of Labor Rate) required for Standard Costing.

© BMA Inc All rights reserved. Example: standard cost Calculate the Standard Cost for product Pro-Valve 602 given the following information.

© BMA Inc All rights reserved. Exercise: standard margin The company receives a request-for-quote from a customer for 3000 Pro-Valve 602’s per month. The customer’s target price is £45 per unit. Your company requires a minimum of 15% margin. Work out the profitability using Standard Costing.

© BMA Inc All rights reserved. Example: low cost outsourcing The company has found a Far East supplier quoting a landed cost of £33.00 for the XJ2’s. The customer’s target price is £45 per unit. Your company requires a minimum of 15% margin. Work out the profitability from outsourcing this product.

© BMA Inc All rights reserved. Example: value stream costing Work out the profitability using Value Stream Costing. You need to get 2 new machines and 2 operators to support this volume increase to 3000 units/month

© BMA Inc All rights reserved. Example: summary & decision

© BMA Inc All rights reserved. Example: box scores show the full impact

© BMA Inc All rights reserved. How do I set the price of a product? Pricing is set by the market. The price is determined by the value created for the customer. –Product, services, intangibles Pricing requires close understanding of the market, the customer’s requirements, and the competitors. –How much value are we creating for the customer?

© BMA Inc All rights reserved. Using value stream costing for measuring profit margins We use value stream profit and the overall return on the value stream; not individual product profit. Contribution is the revenue of the value stream less the direct external costs. Direct external costs include: –Purchased materials and components –Outside processes –Other direct costs paid to third party organizations Labor cost or machine cost is not considered a direct cost.

© BMA Inc All rights reserved. What about make/buy decisions? Assuming the company has the capability to make the item & achieve quality levels, the make/buy decision is always based upon the capacity of the value stream. If the value stream has capacity – particularly in the bottleneck work-center – the cost of making the product is effectively zero. If there is no available capacity in the value stream, then the make/buy decision is based upon the contribution (revenue minus material cost) of the entire value stream.

© BMA Inc All rights reserved. Employee efficiency & asset utilization We use the cell and value stream performance measurements to monitor & control the value stream activity. We are concerned not with efficiency but with value stream profitability and return. We are also concerned about the value we create for the customer.

© BMA Inc All rights reserved. How should we approach new product introduction decisions? The same story…. How does this new product impact the total value stream profitability and return. Products and processes should be designed to minimize the load on any bottlenecks. This will increase the value stream contribution because more products can be processed in the same amount of time.

© BMA Inc All rights reserved. How do we value inventory? Inventory Valuation becomes less important. As Lean Manufacturing takes hold within the company inventory levels fall substantially. Lower inventories make the value of inventory less significant; less financially material. When raw material is pulled in frequently from the supplier and used immediately in production, the purchase cost of the materials is the materials cost of sales. Work-in-Process inventory is low and consistent because of effective value stream flow, cell design, and kanban pull.

© BMA Inc All rights reserved. Orrey Fiume, CFO Wiremold Corporation Why there is no need to have a product cost. Why marketing need a product cost. Why operations need a product cost.