Singleton Project New 8-ine breaker-and-a-half 345-kV station. Increase North-Houston limit by approximately 700 MW. Increase switching flexibility and.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

Workforce Management Issues A discussion of best practices EEI TD&M Conference Charlotte, NC April 19, 2004.
NedPower Mount Storm Project Update for Grant County September 25, 2007.
Presentation Joy Singleton Professor Jessica Hamlin PBRL350 Assign 4-1 PR Impact: Annual Reports March 18, 2012.
Pre-Electric Station Operator Station Design Concepts.
Lightning Arresters and Their Application
Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Applications of Logarithms Decibels – Power Gain Decibels – Voltage Gain Frequency and Gain Bode Plot Bode Plot - 2.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
July 13, 2012 Transmission Needs Analysis Scenario 1 Update: BAU All Technologies.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
Kurten Switch Project ERCOT Board of Directors Bill Bojorquez System Planning December 13, 2005.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Progress of, and prospects for, commercial applications of UHV 1100kV Transmission System in TEPCO 2 nd International Symposium on International Standards.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
AEP Corpus Christi TDC Advance Outage Scheduling Initiative.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
December 2, 2004 Congestion Causes and Effects Presented to WMS January 14, 2005 Beth Garza.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Ponnequin turbines output voltage(580Von the Micon side, 690Von the Vestas side) to pad mount transformers. These step the voltage up to 25KV. Connected.
Introduction to Trimesters How will it affect me?
Campus Change: Help Manage Construction Impacts ▸ General Academic Building No. 1 construction to begin in spring semester ▸ Plans are underway to close.
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Time Remaining 20:00.
May 8, 2008 Technical Advisory Committee CenterPoint Energy Rothwood Substation Project Jay Teixeira Manager, Regional Planning.
October, 2009 Congestion Report Isabel Flores. 2 October, 2009 Background Provide trend of local congestion costs for last 13 months Costs shown in millions.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Houston Import Project – ERCOT Independent Review
Houston Area Constraint Mitigation Project ERCOT Board of Directors March 15, 2005.
Houston Import Study Update
VOLTAGE PROFILE WORKING GROUP (VPWG)
Progress Briefing - Energy Initiative

Nacogdoches to Lufkin SS 345 kV Line Project
Grid Operations Update
SINGLE LINE DIAGRAM.
Local Transmission Planning Process: Local Transmission Plan Update Meeting December 15, 2016.
Summary of Fuse Testing for Barrel Module Fuse Boxes
I-5 Corridor Reinforcement Project
Power cut 18kV cable for EMD404/E9 is heating
Georgia Tech Protective Relaying Conference May 2, 2018
Half-life.
Worldwide Nuclear Testing

SWITCH GEAR AND PROTECTION(IV-1) TOPIC-CIRCUIT BREAKER
TONBRIDGE POWER GREEN LINE
Comments received: PSE
Presentation transcript:

Singleton Project New 8-ine breaker-and-a-half 345-kV station. Increase North-Houston limit by approximately 700 MW. Increase switching flexibility and shorten line lengths. Construction Outages started Spring 08 Remaining Outages to energize station are planned for 3/4/2009 to 4/21/2009

Singleton Current Configuration (line model)

Singleton Outages: Jewett-THW GC - RP

Singleton Outages: GC – Singleton Jewett – Singleton Completed: Singleton-THW

Singleton Completed: GC – Singleton Jewett – Singleton THW - Singleton

Singleton Completed: GC – Singleton Jewett – Singleton THW – Singleton Outages: Jewett – Tombal

Singleton Completed: GC – Singleton Jewett – Singleton THW – Singleton Jewett -Singleton Tombal – Singleton RP - Singleton

Singleton Completed: GC – Singleton Jewett – Singleton THW – Singleton Jewett -Singleton Tombal – Singleton Outages: GC - Obrien

Singleton Completed: GC – Singleton Jewett – Singleton THW – Singleton Jewett -Singleton Tombal – Singleton Outages: GC - Obrien

Singleton Mid-April 2009 Final Configuration (line model)