RAVE status report Matthias Steinmetz (AIP). 2 11 June 2009 2009 RAVE collaboration meeting - Padova Data collection  325k spectra for 280k stars (Jan.

Slides:



Advertisements
Similar presentations
The Australian Virtual Observatory e-Science Meeting School of Physics, March 2003 David Barnes.
Advertisements

Accessing RAVE hardware for PLATO PIC Ulisse Munari Tomaz Zwitter.
Introduction. OzPoz is the fiber positioner for FLAMES, a multi-object spectroscopic facility on the VLT. It can feed light from as many as 140 objects.
RAVE MEETING BALTIMORE May 2008 Status of the 3 rd 6dF field plate and the new RAVE observing support model. Q.A.Parker (AAO/Mac.Uni) Fred Watson (AAO)
Office of the Vice President for Research Research Trends Richard O. Buckius Vice President for Research Academic Leadership Forum March 31, 2010.
Partners: France: Ministère délégué à la Recherche Germany: Projektträger des Bundesministeriums für Bildung und Forschung im Deutschen Zentrum für Luft-
Decadal Plan Working Group 3.2 National Facilities Chair: Michael Drinkwater (UQ) Deputy chair: Naomi McClure-Griffiths (ATNF)
The AAO: Matthew Colless 17 December 2004.
MACQUARIE UNIVERSITY, DEPARTMENT OF PHYSICS RESEARCH – ASTRONOMY & ASTROPHYSICS CORE Astronomy and astrophysics research has grown rapidly at Macquarie.
1 st results from cross-matching with X-ray data George Seabroke.
The Search for New “r-process-Enhanced” Metal-Poor Stars Timothy C. Beers Michigan State University.
Sloan Digital Sky Survey Astronomy April 2006 Margaret Flynn.
Compilation of stellar fundamental parameters from literature : high quality observations + primary methods Calibration stars for astrophysical parametrization.
Prof Paul Cally Professor of Solar Physics Centre for Stellar & Planetary Astrophysics Head in the Stars, Feet on the Ground: Studying Astronomy & Astrophysics.
Processing Status June 2009 Mary Williams Padova Meeting, 11/06/09.
Spectroscopy Techniques and Projects at 1.2-m UK Schmidt Telescope
1 The Thirty-Meter Telescope (TMT) Richard Ellis, Steele Professor and California Institute of Technology TMT Board member Michael Bolte, Director, University.
National Strategic Plan for Asbestos Management and Awareness Peter Tighe Chief Executive Officer, Asbestos Safety and Eradication Agency.
Aus-VO: Progress in the Australian Virtual Observatory Tara Murphy Australia Telescope National Facility.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
EARLINET-ASOS Symposium 20 September 2010, Geneva, Switzerland EARLINET: Future plans Gelsomina Pappalardo Consiglio Nazionale delle Ricerche-Istituto.
1 ASTRONET PROGRAM STATUS as of Preliminary Board 1 st Meeting Paris, 31 May 2005.
NANSLO Environmental Scan Definition and Preliminary Findings 1.
This page is intentionally blank. A new view of the Universe VIII Fred Watson (and the RAVErs) April 2005 A new view of the Universe VIII Fred Watson.
OPTICON Access Programme. OPTICON Access Programme. Mid-term review September Corfú OPTICON Trans-national Access Programme under the auspices of.
Inspire. Lead. Engage. Information Literacy in the clinical learning environment of new graduate nurses Olive Wahoush & Laura Banfield November 2010 Funded.
Hands-on experience on medium-sized telescopes or: The need to train young researchers in observing techniques M. Dennefeld IAP-Paris and University Paris.
UKIRT: Current Status and Future Plans Natonal Astronomy Meeting 20 th April 2009 Professor Gary Davis, Director.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
SDSS-KSG 08 Workshop1 The SDSS DR7 and KIAS SDSS mirror Won-Kee Park ARCSEC, Sejong University 2008 SDSS-KSG Workshop.
PhD Projects with Industry Involvement Chris Dainty National University of Ireland, Galway Brussels, 4 June 2008.
Status Report on Advanced Mesospheric Temperature Mapper Activities at ALOMAR Mike Taylor, P.-Dominique Pautet Utah State University ASAC Meeting - Hamburg,
OPTICON JRA4 Coordinator Dr Alain Chelli Laboratoire d’Astrophysique de Grenoble & Jean-Marie Mariotti Center, Universite Joseph Fourier, BP53, Grenoble.
6dFGS Workshop, Epping 11 July 2003 Fred Watson (and the RAVErs) 6dFGS Workshop, Epping 11 July 2003 Fred Watson (and the RAVErs)
A New Stellar Stream? The large red “eye” at l = 240 – 270 deg, b = 10 – 30 deg signals a point of interest. The gradient between the over- density and.
Andreas Quirrenbach and the CARMENES Consortium Searching for Blue Planets Orbiting Red Dwarfs.
TMT.PMO.PRE REL011 Thirty Meter Telescope Background and Status.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Star formation in Deep Radio Surveys Nicholas Seymour ARC Future Fellow CSIRO Astronomy and Space Science Bologna 13 th September 2011.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together many of Europe's astronomical observatories, data centres and laboratories.
MNRF Management and milestone achievements Chris Evans AAO.
The Virtual Observatory Europe and the VO: the Astrophysical Virtual Observatory and the EURO-VO Astrophysical Virtual Observatory and the EURO-VO Paolo.
1 ASTRONET Coordinating strategic planning for European Astronomy.
1 The DES Calibrations Effort Douglas L. Tucker (DES Calibrations Scientist) DES NSF/DOE Review, 8-9 June 2009 The DES Calibrations Effort has connections.
New planetary nebulae from IPHAS Romano L.M. Corradi 1,2 Antonio Mampaso 2 & Kerttu Viironen 2 1 Isaac Newton Group of Telescopes, La Palma 2 Instituto.
Why Collaboration?  Better science through collaboration If you want to do a big survey, you need to benefit (or persuade) many scientists. (Democratic.
Gaia Science Alerts in Italy Bologna, Catania, Napoli, Teramo, … Padova Massimo Turatto INAF Osservatorio Astronomico di Padova L’Italia in Gaia - Roma.
Salish Kootenai College Tier 3 Center Tim Olson Salish Kootenai College GriPhyN/iVDGL E/O Meeting3/1/02.
The 6dF Galaxy Redshift Survey: Status Report and Data Release 2 Heath Jones ANU/AAO Will Saunders AAO Mike Read Edinburgh Matthew Colless AAO 100,000.
The 6dF Galaxy Survey - The First Year Will Saunders Anglo-Australian Observatory.
LISA News from ESA O. Jennrich LISA Project Scientist.
Stellar population Studies with LAMOST - Chen Bing - Contents Contents Galactic structure & Evolution Galactic structure & Evolution Related Projects Related.
Dark Matter and Rotational Motion e.t. revised feb 09.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
The XMM Cluster Survey: Project summary and Cosmology Forecasts Kathy Romer University of Sussex.
Astronomical Projects BEYOND NIGHT SKY. General requirements Weekly Night sky observation. Good knowledge of telescope controlling Imaging. Inviting few.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
Regional Policy Performance framework review and reserve Jan Marek Ziółkowski Evaluation and European Semester Unit DG for Regional and Urban.
Final Data Archiving of the Sloan Digital Sky Survey-an Example
Strengthening the foundations of ERA
Judy’s contribution to globular cluster science
H Stacked Images Reveal Large Numbers of PNe in the LMC
Year 10 Maths Information Evening
Moving towards the Virtual Observatory Paolo Padovani, ST-ECF/ESO
S4 will be a “big” Collaboration:
Theme 2 AO for Extremely Large Telescopes
User instrument policy
OPTICON The Optical Infrared Co-ordination Network for Astronomy.
Theme 2 AO for Extremely Large Telescopes
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

RAVE status report Matthias Steinmetz (AIP)

2 11 June RAVE collaboration meeting - Padova Data collection  325k spectra for 280k stars (Jan 09) (see Fred‘s talk)  Data reduction up to date (March 09) (see Mary‘s talk)

3 11 June RAVE collaboration meeting - Padova Data collection

4 11 June RAVE collaboration meeting - Padova Data collection Year nights sched. nights lost nights used spectra sp/night avail. fib. sp/n/fib wea. sys. RAV E , , , ,

5 11 June RAVE collaboration meeting - Padova Data quality  DR3 close to be ready for publication  Continues need to better understand data quality  Calibration observations  Reduction of scatter  Understanding (and correcting) systematics  Comparison between RAVE and SDSS

6 11 June RAVE collaboration meeting - Padova Auxiliary catalogues  Proper Motions (Roeser)  Distances (Breddels)  Individual Abundances (Boeche)  Calibration stars  Stellar rotation velocities  …

7 11 June RAVE collaboration meeting - Padova RAVE photometry  So far mainly IR: DENIS and 2MASS  Already the 1st scan of skymapper will provide multiband photometry in the optical for all RAVE stars  Can we prepare this with SDSS photometry in the survey overlap regions?

8 11 June RAVE collaboration meeting - Padova RAVE science  A number of science papers appeared  One from outside of the collaboration  Only a few on key science areas of RAVE

9 11 June RAVE collaboration meeting - Padova Status of AAO  AAO contract (UK/Australia) ends on 30 June 2010 – currently the formal end of RAVE MoU  Positive funding decision for AAO by Australian Government  Revised MoU required. First draft to be discussed in September  Terms similar to existing MoU  More specific on performance goals  RAVE intent: continue operation toward 1M spectra (mid 2012?)

10 11 June RAVE collaboration meeting - Padova Status of UKST hardware  6 weeks loss of operation in 2007 owing to asbestos removal  Poor availability of fibres for (average ~100 fibres), in particular in 2008  Fibre quality deteriorating  FP2 now beyond repair  Successful FP3 commissioning in Mar 09  FP1 refurbished to 100 fibres  FP2 under remodelling, new fibre bundle  FP1 remodelling after FP2 rework is completed  3 fully equipped FP by 2010

11 11 June RAVE collaboration meeting - Padova RAVE finances  Currently RAVE operation is secured to mid 2010  We would need about 600k€ to continue until mid 2012  Model: 50% from collab, 50% new partners  Discussion with potential new partners  Basic model: access for 1 faculty + 1 postdoc + grad students = entrance fee of 100k€  Martin Asplund  Tim Beers  ANU  We need some cash!!!

12 11 June RAVE collaboration meeting - Padova RAVE acknowledgement  Funding for RAVE has been provided by: the Anglo- Australian Observatory; the Astrophysical Institute Potsdam; the Australian National University; the Australian Research Council; the French National Research Agency; the German Research foundation; the Istituto Nazionale di Astrofisica at Padova; the Johns Hopkins University; the W.M. Keck foundation; the Macquarie University; the Netherlands Research School for Astronomy; the Natural Sciences and Engineering Research Council of Canada; the Slovenian Research Agency; the Swiss National Science Foundation; the Science & Technology Facilities Council of the UK; Opticon; Strasbourg Observatory; and the Universities of Groningen, Heidelberg and Sydney.