Current measuring navigational buoy one buoy, two purposes.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

1 Impact of Decisions Made to Systems Engineering: Cost vs. Reliability System David A. Ekker Stella B. Bondi and Resit Unal November 4-5, 2008 HRA INCOSE.
Sunk Traffic Separation Scheme
Prepared By: A.M. Al-Ashwal Project Advisor OFF GRID 1.
What is the Enerjetic Business? The business offers consulting and reporting tools to report on energy and related data for business purposes. Common uses.
Strategic Planning of Port Infrastructure
MIS 2000 Class 20 System Development Process Updated 2014.
Presentation (Part 2) By K. Soondron (Mrs) Assistant Manager, Human Resources Ministry of Civil Service & Administrative Reforms 13 March 2014.
7 May, 2015 Green corridors in Europe; a perspective from Holland Menno M. Menist, Managing director 17 March 2010, Malmö.
Program Reasons underlying cost savings potential in purchasing
Supply Chain Management
1 Proposal for the Revision of the CSPI ( CSPI: Corporate Services Price Index) Hina KIKEGAWA Bank of Japan
Peter Artz, Inge van de Weerd, Sjaak Brinkkemper & Joost Fieggen Productization Transforming from developing customer-specific software to product.
 The Fundamental Reasons Behind The Failure Of ERP System SYSM 6309 Advanced Requirements Engineering By Shilpa Siddavvanahally.
Agenda Microsoft Financial Offerings Introducing Microsoft ® Office Small Business Accounting 2006 Product demonstration Questions
Introduction to Systems Analysis and Design
© The McGraw-Hill Companies, Software Project Management 4th Edition Managing contracts Chapter 10.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
1 COMMUNITY LIBRARY CONDITIONAL GRANT 4 th Quarter Performance: 2011/12 Financial year.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
The future shape of business is being redefined through outsourcing.
David S. Mueller U.S. Geological Survey Office of Surface Water
The Firm: Cost and Output Determination
Developing the Personal Competence Manager Evaluation Work: ‘EPIQ Business Demonstrator’ Elena Shoikova, Vladislav Denishev, Radoslav Milanov Technical.
Märt Ots Estonian Competition Authority Baltic Electricity Market Fora Vilnius Latest developments in Estonia.
Copyright 2010, The World Bank Group. All Rights Reserved. Agricultural Coding and Data Processing Section B 1.
Journées "Ports & Environnement” Clean Energy Management in Ports EFFORTS results Le Havre – March 10th, 2010.
EXPECTATIONS OF TURKISH ENVIRONMENTAL SECTOR FROM INSPIRE Ministry of Environment and Forestry June, 2010 Özlem ESENGİN Ahmet ÇİVİ Tuncay DEMİR.
Introduction to information systems
CHAPTER 1 BUSINESS INFORMATION SYSTEM ; AN OVERVIEW.
Underkeel Clearance (UKC) Project
Designing Spreadsheet LP Models
People and Information Tech. Chapter 18 What issues does the chapter discuss? Why are these issues important? What can we do to deal with the issues appropriately?
Putting it all together The structure of a speech.
State of the Art Study TG1 - logistical infrastructure of ports and port operation models.
Welcome To Business Summary DiveIn Incorporated is a small company that specializes in the sales of swimming pools supplies to homeowners by mail order.
Ch. 20: Operation systems Learning Objectives Distinguish among various types of production and manufacturing processes. Describe product innovation.
1 INDRIS Inland Navigation Demonstrator for River Information Services Cas Willems Transport Research Centre Ministry of Transport The Netherlands.
Marketing Management MKTG 6170: Module II: Supply Chain Management/ Distribution Supply Chain ◦ An alignment of firms/exchanges  Exchange perspective.
Management & Development of Complex Projects Course Code MS Project Management Project Life Cycle & PM Process Groups Lecture # 4.
CONRAD BLUCHER INSTITUTE ACTIVITIES SUPPORTING TEXAS PORTS AND WATERWAYS OPERATIONS Two Inter-related Services to the Port Community: 1. The Texas Coastal.
PPTTEST 10/24/ :07 1 IT Ron Williams Business Innovation Through Information Technology IS Organization.
UNIVERSITY OF ECONOMICS IN BRATISLAVA, SLOVAK REPUBLIC 6. Contract negotiations.
DATABASE MANAGEMENT SYSTEMS CMAM301. Introduction to database management systems  What is Database?  What is Database Systems?  Types of Database.
Briefing to the Portfolio Committee on the Comparison on Procurement Methodologies 6 June 2006.
Introduction Graeme Orr, Atyrau, April 2011.
WOUTER STOLWIJK Sustainable Public Procurement in the Netherlands Innovative tools November 2015.
Study on Regulatory Options for Further Market Opening in Rail Passenger Transport Stakeholder Meeting 10 February 2010 Session 2B Great Britain Case Study.
Midterm/Final Presentation Project Name Students: [Name1], [Name2] Supervisor: [SV Name] Context: Project [A/B/Special] Semester: Winter/Spring, Year Date:
112 Emergency Call System in Poland Caller Location Workshop on emergency number 112 Tbilisi, November 2013 Maria Skarzyńska Ministry of Administration.
UNDERWATER WIRELESS COMMUNICATION
HVDC Transmission.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
PUBLIC UTILITIES COMMISSION OF LATVIA PRACTICAL EXPERIENCE OF NGA SOLUTIONS IMPLEMENTATIONS, ESTABLISHMENT OF NGA INVESTIGATIONS AREAS Aleksandrs Čerņakovs-Neimarks.
1 Synchronous generators with permanent magnets for stabilization the output voltage of the power wind mill installations Tudor Ambros Professor, Technical.
The easy way to take care of complex tasks.
Latest developments in Estonia
Charta Software – Karsten Uil
how to make a business plan outline lecturers: Jadranka Petković, dipl
Creating Reliable and Effective Pricing System for Pulp Derivatives
Accounting Information Systems with ERP Applications
Accounting Information Systems with ERP Applications
Technical Communication Fundamentals Chapter 3: Visual Design
Booklet Design and Equating
Account Segmentation Final Briefing
Hydro17 – Accuracy in Depth Rotterdam, November 15th, 2017
INSTALLATION PROTECTION PROGRAM CONTRACTING
Cost Accounting for Decision-making
OUR SERVICES Need a hand changing catalogue solutions?
Flood Protection Hollandsche IJssel
Presentation transcript:

Current measuring navigational buoy one buoy, two purposes

Rijkswaterstaat 2Current measuring navigational buoy Improving information supply to large ships entering the Port of Rotterdam by combining navigational and measurement facilities in a buoy Peter Verburgh, Rijkswaterstaat Information Supply division (CIV)

Rijkswaterstaat 3Current measuring navigational buoy Outline of presentation Rijkswaterstaat, a brief company overview Situation Present data supply Reasons for renovation Why a buoy? What buoy to use? The deployment The data Summary, conclusions and time for discussion.

Rijkswaterstaat 4Current measuring navigational buoy Rijkswaterstaat Part of the Dutch Ministry of Infrastructure and the Environment Responsible for design, construction, management and maintenance of: the main road network the main waterway network the main watersystems

Rijkswaterstaat 5Current measuring navigational buoy Central Information Services CIV provides reliable and fit-to-business information for Rijkswaterstaat Peter is project manager at CIV

Rijkswaterstaat 6Current measuring navigational buoy Situation Very busy shipping area Large ships need information to enter Rotterdam harbor safely

Rijkswaterstaat 7Current measuring navigational buoy Present information supply Meteo Waves Current from 2-D model Current from pole Tide

Rijkswaterstaat 8Current measuring navigational buoy Present information supply Wind Waves Current from 2-D model Current from pole Tide

Rijkswaterstaat 9Current measuring navigational buoy Reasons for renovation Better predictions 3D information instead of 2D Reduction of maintenance costs Present measurement pole “Maasmond” out of order

Rijkswaterstaat 10Current measuring navigational buoy Future information supply Meteo Waves Tide Current from 3-D model Surface current from HF-radar Current from buoys

Rijkswaterstaat 11Current measuring navigational buoy Why a buoy? Relatively low cost solution compared to pole (100k vs 1000k€) Relatively short time to put into practice (8-10 months vs 2 yrs) Easy to change the location Low cost of ownership (maintenance is done on-shore) Disadvantages: Vulnerable Little space for solar panels, therefore very limited power No fixed location, it moves on its anchor The ADCP is constantly moving

Rijkswaterstaat 12Current measuring navigational buoy What buoy to use Commercially available measurement buoys Specifically designed measurement buoy Lesson learned from previous development in Zeeland Operational requirements Decision: Buoys will be based on ‘Zeeland’-buoy

Rijkswaterstaat 13Current measuring navigational buoy The production An existing contract for navigational buoys was used (no tender) Order based on functional rather than technical specifications Supplier is responsible for proper functioning Rijkswaterstaat is responsible for data-connection (on-line!) Rijkswaterstaat is responsible for deployment

Rijkswaterstaat 14Current measuring navigational buoy The production Two buoys, one spare ‘measurement-core’ Flotation segments from France (Mobilis) Central cylinder made in the Netherlands (Rombouts) Electronics designed and made in France (Mobilis) ADCP and UMTS/GPRS supplied by Rijkswaterstaat CIV Put together in the Netherlands (Mobilis/Rombouts)

Rijkswaterstaat 15Current measuring navigational buoy The deployment From a.l. to b.r: The vessel ‘Rotterdam’, the buoy ‘Maas-Oost’ in the crane of the ‘Rotterdam’, both buoys and spare core on deck of the ‘Rotterdam’, the buoy ‘ODAS-MV’ on location

Rijkswaterstaat 16Current measuring navigational buoy The data First brief impression: looks acceptable… Comparison with model output: reassuring! Evaluation versus separate measurement with shipborne ADCP ongoing

Rijkswaterstaat 17Current measuring navigational buoy The data Difficulties encountered: One of the beams seems to reflect from the anchoring chain Occurrence of ‘moving bottom’ may reduce accuracy Complex data conversion suspect to introduce (timing)errors Settings are location-dependent and have to be done very carefully

Rijkswaterstaat 18Current measuring navigational buoy Summary A navigational buoy can be succesfully transformed into a online measurement platform, while retaining its navigational purpose. Vertical current profiles can be measured from a buoy Take into account operational difficulties It is not as ‘cheap’ a solution as some managers would like it to be

Rijkswaterstaat 19Current measuring navigational buoy Questions / discussion Thank you for your attention! …Time for questions and discussion