Oklahoma Department of Transportation Susan McClune Regulatory Services.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

Contracting with WYDOT
American Recovery and Reinvestment Plan District Six Economic Stimulus Information Meeting FDOT ROADWAY MAINTENANCE AND CONSTRUCTION PROJECTS – PROCURED.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Doing Business with FDOT
Marcy Mealy Procurement Specialist CDBG Program
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
County Bridges Falling Down SDACC – County Commissioners Spring Workshop Thursday, March 17, 2011.
Contracting with WYDOT
Doing Business with FDOT Professional Services
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Subcontract Requests. P rocess After the notice to begin work is issued, Construction Procurement uploads the contract into SiteManager. At that point.
Procurement Process Economic Stimulus. Items to Be Discussed Professional Services Information Design Build vs. Conventional Where to Find Advertisements.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Improving Understanding, Function and Procedural DBE Compliance ODOT OCR DBE Triage Training Office of Civil Rights DBE Program ODOT Training March 1,
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Purchasing Overview. Fundamentals of Purchasing Procedures.
1 Acquisition Office SYMTRAC TM – The Importance of Compliance presented by Evita J. Fields.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
TRIBAL INVOLVEMENT IN EVERY DAY COUNTS IVAN MARRERO, P.E. ASSISTANT DIVISION ADMINISTRATOR FHWA-OKLAHOMA DIVISION.
Federal Force Account Utilizing Sponsor Resources Georgia Airports Association – Spring Workshop March 13, 2014 Presented By Katie Eleam Aviation Project.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Working Successfully With Property Managers: An Interactive Engagement
STATEWIDE INITIATIVE TO BE CONSISTENT TO BE PREDICTABLE TO BE REPEATABLE.
Presentation Title Here Additional Line if Needed Date Here General Architectural and Engineering Services (Consultant Contingency Contracts) 15 April.
1 Doing Business with the University of North Texas System September 2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Tribal Strategies, Inc. Building a Strong Foundation Small Business Update Tulsa, Oklahoma February 1, 2010 Karen J. Atkinson Tribal Strategies, Inc.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
Kentucky Transportation Cabinet
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
FEDERAL/STATE FUNDING EXCHANGE PROGRAM MICHELE RISKO, CEAO.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
Public Works Department Presentation to: Consolidation of Services Study Commission, Purchasing Subcommittee September 19, 2005.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Diverse Business Program Presented By: Dwan Lee – PennDOT Bureau of Equal Opportunity Anthony Stever – PennDOT Bureau of Public Transportation Kenyon Holley.
BIDDING AS A DBE SUBCONTRACTOR ON UTAH DEPARTMENT OF TRANSPORTATION HIGHWAY CONSTRUCTION PROJECTS.
 GDOT 101 GEORGIA DEPARTMENT OF TRANSPORTATION DBE SUPPORTIVE SERVICES PRESENTS… GDOT 101 NEXT STEPS AFTER DBE CERTIFICATION – DOING BUSINESS WITH GDOT.
WEST VIRGINIA INDUSTRIAL ACCESS ROAD PROGRAM West Virginia Economic Development Council January 27, 2016.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Building Greatly: Construction & Properties’ Segment DCS/Construction and Properties Division 405/ Mike Jones Acting State Construction.
Presented by: CCSD Procurement Services Department How to do Business with the Cobb County School District 1.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Building Greatly: Construction & Properties Department (CAPD)Segment DCAM/Construction and Properties Department 405/ Mike Jones.
Construction & Properties Department (CAPD)Segment for September 5, 2013 DCAM/Construction and Properties Department www://ok.gov/DCS/Construction_&_Properties/index.html.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Metra Construction Contractor Prevailing Wage Workshop
Construction Oversight
Doing Business with Santa Clara Valley Transportation Authority (VTA)
LOCALLY ADMINISTERED PROJECTS
CAPITAL PROGRAM OVERVIEW
Procurement.
Doing Business with FDOT Professional Services
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
HUB Vendor Basics Ruben Gonzalez, CTCD
Use INDOT’s Website to Find Potential Consultant Opportunities
Presentation transcript:

Oklahoma Department of Transportation Susan McClune Regulatory Services

Doing Business with ODOT Construction – highway projects Preconstruction – engineering design Procurement - purchasing

Construction Projects are advertised and are subject to the competitive bidding act. Bidders must be prequalified to bid as prime contractors by the Office Engineer Division. Bids are opened once a month, usually every third Thursday. Contract awards are made by the Oklahoma Transportation Commission at the scheduled meetings, usually the first Monday of each month

Construction Prime contractors may subcontract up to 50% of their work to subcontractors, who are not required to be prequalified. Subs bid directly to the prime bidder (plan holder). Prime contractor also use the services of material suppliers, manufacturers, trucking firms, and construction staking firms.

Construction Highway projects are both federally- assisted and state-aid funded. Types: –Bridge rehabilitation and replacement –Surface Transportation –Interstate Maintenance –Enhancement

Project Areas of Work The areas of work performed on highway projects include: Grade & Drain – clearing & grubbing, excavation, grading, and embankment Erosion & Sediment Control – temporary sediment control, solid slab sodding, etc. Bases – aggregate bases, sub base, etc. Trucking – dirt, aggregates, asphalt.

Project Areas of Work Surfaces – asphalt and concrete paving Structures – bridges Incidental construction – guardrail, fencing, curb & gutter, sidewalks, etc. Material Suppliers of products used in the construction of highway projects Construction staking Traffic Control – lighting, signs, striping, delineators, construction traffic control

ODOT’s Website Contracts and Proposals – information includes: Notice to Contractors – information regarding upcoming bid openings, including pay items Plan Holders List – which prequalified contractors have taken out plans on each project Prequalified Contractors List Bid Letting Reports Bid Opening Calendar

Preconstruction Engineering design – roadway, bridges, hydraulics/hydrology, geotechnical Survey – professional land surveyors Construction Management Right-of-Way Services Providers Bridge Inspection Environmental Studies

Preconstruction Qualification based selection process. A firm must be registered with ODOT’s Project Management Division in order to receive solicitations. Professional services consultants may also work with prime consultants as sub consultants. Information regarding solicitations is available on ODOT’s website.

Preconstruction Right-of-Way Division is responsible for selecting service providers in the areas of: Turnkey Firms, Project Managers, Mapping, Title Investigation, Appraisal, Appraisal Review, Negotiation, Relocation, Demolition, and Utility Relocation Coordination. A prequalification application must be completed and submitted for approval. Once approved, the firm is placed on the ROW Division’s approved service provider list. ROW will send out Requests for Proposals only to those providers on their list.

Preconstruction The Project Management Division is responsible for the consultant selection process. Solicitations for services include: Survey, Roadway Design, Bridge Design, Construction Management, Environmental, Bridge Inspection, Geo-tech, and Hydrology. A Professional Services Information form must be completed in order to receive solicitations. Once the need has been determined and the scope of work developed, a Solicitation of Interest (SOI) is issued electronically to those on the approved list. A Letter of Interest is the consultant’s response to an SOI. This response must include:

SOI Letter of Interest with reference to the specific solicitation Proposed table of organization of the project team identifying the project principal, the project manager, key staff, and sub consultants Information that is common to each contract The statement of qualifications (CAP255) This is a qualifications based selection process. Information about these solicitations may be found on Project Management’s website at: tanthomepage.htm

Procurement Purchasing of goods the Agency uses is governed by the Central Purchasing Act and Central Purchasing Rules Most purchases in excess of $25,000 are sent to the Department of Central Purchasing (DCS) for competitive bids A firm must be registered with DCS in order to receive solicitations

Purchasing Limits Department of Transportation Purchasing - $0 - $25,000 Department of Central Services $25,000 and above DCS’ Website: