CERN-KEK X-band collaboration 3 Dec. 2011 T. Higo on behalf of X-band group of KEK.

Slides:



Advertisements
Similar presentations
Choke-mode Damped X-band Structure for CLIC Main Linac Hao ZHA, Jiaru SHI CERN Sep 27, 2011 Jiaru Shi, LCWS11 Workshop, Granada1.
Advertisements

Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
High gradient studies in simple setups (for discussion) T. Higo.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
X-band Structures Test Results at NLCTA Faya Wang Chris Adolphsen, Christopher Nantista 9-Feb-11.
High gradient features from Nextef on recent CLIC prototype structures US-HG workshop, SLAC 9 February 2011 T. Higo representing X-band group of KEK.
CLIC RF structure master schedule and CERN production
Report from Nextef IWLC10, Genève, Oct. 20 T. Higo (KEK)
Working Group 1: Microwave Acceleration Summary 10 July 2009.
Design of Standing-Wave Accelerator Structure
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Results from Nextef Observations in high gradient tests of CLIC Prototype Structures and associated study activities CLIC2013, CERN 29 January, 2013 T.
KEK activities on CLIC X-band Accelerating Structures Tsinghua Univ., March 24 T. Higo (KEK)
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
R&D status and future strategy in KEK X-band area May 16, 2011 T. Higo (KEK)
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
040220LCPAC 2004 Structure (T. Higo)1 X-band accelerator Structure LCPAC Feb. 20, 2004 T. Higo KEK.
Statistical analysis of RF conditioning and breakdowns Jorge GINER NAVARRO CLIC Workshop /01/2015 J. Giner Navarro - CLIC WS20151.
Summary of the meeting T. Higo This meeting was originally born as a collaboration meeting among three laboratories, CERN, SLAC and KEK, but the attendee.
Structures design R&D program Alessandro D’Elia-UMAN/CI and CERN On behalf of Roger M. Jones 1.
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 …
X-band high gradient activities at KEK May 13-15, nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK.
X-Band: test stand and structure program
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
A Study of RF breakdown of Narrow Wave Guide Shuji Matsumoto Kazue Yokoyama Toshi Higo Accelerator Lab., KEK 2016/1/41SLAC Workshop 8-10 July 2009.
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
High gradient study at KEK CLIC08, Oct , 2008 T. Higo.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Status report from KEK Feb. 26, 2010 T. Higo, S. Matsumoto T. Takatomi, Y. Higashi and X-band group.
Nextef results CLIC09, Oct T. Higo (KEK). Contents Quadrant high gradient test status – Initial processing and power limit – VAC characteristics.
TD18 High Power Test Results Faya Wang Chris Adolphsen May 3, 2010.
W. Wuensch CLIC project meeting High-power rf structure testing.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch,
Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo.
X-Band Technology, requirement for structure tests and its application for SASE FEL D. Schulte for the CLIC collaboration Special thanks to A. Grudiev,
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
Discussion on critical issues for testing: breakdown identification, preparation for test, processing protocol, etc. 4 th Annual X-band Structure Collaboration.
Some information from Nextef For poster session in IWLC T. Higo.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
KEK test area plans Shuji Matsumoto Accelerator Lab., KEK.
Test Accelerating Structures Designs, Objectives and Critical Issues
KEK Status and plans of structure production and testing
Effort to identify the critical issues for high gradient
X-band and high-gradient development plans at Tsinghua University
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Review of rf structure test results
Testing Infrastructure, Program and Milestones
Shuji Matsumoto Accelerator Lab., KEK
Summary of WG4 Normal Conducting RF
Recent high-gradient testing results from the CLIC XBoxes
High Gradient tests at the KEK Nextef Facility
A Study of RF breakdown of Narrow Wave Guide
T24 results and comparison to the preceding studies on CLIC prototype structures May 17, 2011 T. Higo (KEK)
5th X-Band Structure Collaboration Meeting
T18_VG2.4_Disk_#2 processing summary
Presentation transcript:

CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK

Activities centered at CLIC high-gradient accelerator structures in 2011 Nextef runs for CLIC prototype evaluation – T24 (undamped) was tested for 2000 hours till earthquake. – TD24 (damped, CLIC prototype) is being tested now. Role of magnetic field – Became evident through the tests Nextef is establishing a new test area for – Basic studies to understand and suppress breakdowns – Study toward much higher gradient Production of test structures – Two pairs of prototypes are being made in 2011 – Taking benefit from the collaboration with SLAC CERN-KEK High gradient activities in /12/14

High-gradient test at Nextef T18_Disk_#2 TD18_Quad_#5 TD18_Disk_#2 TD24R05? TD24 Choke? T24_Disk_#3 TD24_Disk_#4 Narrow waveguide test High power components test Basic studies at shield-B RF delivery from KT1 to shield-B KT1 Nextef CERN-KEK High gradient activities in 2011 KX03 (60cm HDDS) 32011/12/14

CLIC test structures; fabrication and test T18  TD18  T24  TD24 CERN-KEK High gradient activities in 2011 T18_Disk_#2 TD18_Disk_# /12/14 T24_Disk_#3 TD24_Disk_#4 undamped damped

T24 run till earthquake and after CERN-KEK High gradient activities in /12/14 Our office Nextef shield Exposed to air  finish TD24 run Waveguide collapse But fortunately, It reached the very promising breakdown rate, …..

Measurements scaled according to: TD24: September 15 KEK SLAC CERN Simple early design to get started More efficient fully optimised structure No damping waveguides T18T24 Damping waveguides TD18TD24 = CLIC goal CLIC RF team N. Shipman Same input power as 100MV/m loaded Tests at KEK and SLAC Achieved Gradient Staphnes presentaion at LCWS /12/146CERN-KEK High gradient activities in 2011

Toward evaluation of CLIC prototype Damped TD24#4 processing for more than 1700 hrs on Dec /12/147CERN-KEK High gradient activities in 2011 Nov. 21

2011/12/14CERN-KEK High gradient activities in BDR comparison around 250ns TD24#4 on Dec. 3 at ~ 1700hr preliminary

T24#3: Evolution of breakdown rate shows ever decreasing characteristics 2011/9/279LCWS2011, Granada (Higo) We should and we can evaluate the same characteristics in the CLIC prototype, damped structure, TD24#4.

Toward evaluation of TD24 in nominal CLIC operation Damped structure – TD24#4 (present one, close to CLIC) 100MV/m loaded – 100 MV/m no-loaded can only be estimated CLIC pulse shape – Nextef nominal test is severer in pulse shape, full square pulse of 252nsec Processing continues, integrating more than 1700 hrs. KEK and CERN agreed to evaluate the breakdown rate, close to CLIC requirement, through months of operation. 2011/12/14CERN-KEK High gradient activities in

CERN-KEK High gradient activities in 2011 KT-1 X-band KT-2 C-band Nextef X-band A B Pulse compressor KT1-B /12/14 Nextef expansion for further strengthening the R&D

Commissioning of another test area, shield-B, is early next year 2011/12/14CERN-KEK High gradient activities in Candidate of test setups being prepared at KEK Transport line Single klystron Shield-B

Other activities under collaboration 2011/12/14CERN-KEK High gradient activities in DDS damped-detuned cells Choke mode cavity Program in collaboration with Tsinghua univ. Assembly of whole structure by KEK to serve as an independent production study. We should revisit the fabrication study than that developed by SLAC/KEK.

6th Annual Collaboration Meeting on X-band accelerator structure design and test program International Workshop on Breakdown Science and High Gradient Technology Date: April 18th to 20th, 2012 Place: Seminar hall of 4 th building, KEK, Tsukuba, Japan Chaired by T. Higo (KEK). Scientific program by T.Higo(KEK) S.Tantawi(SLAC) W. Wuensch(CERN). 2011/12/1414CERN-KEK High gradient activities in 2011 Next collaboration meeting in next April, a high gradient workshop, will be held in KEK.

2011/12/14CERN-KEK High gradient activities in KEK Structure fabrication & CERN supports for structure fabrication, high power test & system expansion SLAC conducts structure fabrication, high power test & basic research US-Japan SLAC/KEK CERN/KEK collaboration CLIC US-HG Tsinghua, IHEP Structure design, fabrication & test Asian collaboration CERN/KEK collaboration is a base for worldwide R&D toward high gradient

Conclusion KEK appreciates the study toward CLIC high gradient accelerator structure. It gives KEK the important understanding and technology toward normal-conducting high-gradient operation. On the other hand, KEK believes that the study offers CLIC an important standpoint. Both CERN and KEK obtain mutual benefit from this collaboration. 2011/12/14CERN-KEK High gradient activities in