5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,

Slides:



Advertisements
Similar presentations
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
Advertisements

PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
ENGINEERING DESIGN AND PRODUCTION OF X-BAND RF COMPONENTS Germana Riddone, CERN, Geneva, Switzerland Maria Filippova, I. Syratchev, Anastasiya Solodko,
Development of an X-band Dielectric PETS C. Jing, Euclid Techlabs / ANL HG Workshop, May
ON/OFF news. Reflected Transmitted Stroke 8.0 mm RF power, dB Piston position (gap width), mm ON OFF Compact design of the high RF power variable (mechanically)
Design of Standing-Wave Accelerator Structure
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
Offset Quadruple-Ridge Orthomode Transducer, Mode Splitter/Combiner
Different mechanisms and scenarios for the local RF
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
30 GHz waveguide line modification towards 12 GHz.
1 28-Nov-2011 Dog-leg meeting «BE/RF» Current 30 GHz layout CTF3 CTF2 Overmoded 90 bend Mode converter Ø50 circular waveguide (existing line) 326 mm 1.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Development of Dielectric-Based Wakefield Power Extractors Chunguang Jing 1,2, W. Gai 1, A. Kanareykin 2, Igor Syratchev, CERN 1. High Energy Physics Division,
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
Course B: rf technology Normal conducting rf Part 5: Higher-order-mode damping Walter Wuensch, CERN Sixth International Accelerator School for Linear Colliders.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
2nd CLIC Advisory Committee (CLIC-ACE), CERN January 2008 Introduction to the CLIC Power Extraction and Transfer Structure (PETS) Design. I. Syratchev.
RF structure design KT high-gradient medical project kick-off Alberto Degiovanni TERA Foundation - EPFL.
TE/TM are the configuration of E and H fields
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
18/04/12 Arnaud ACKER Mechanical Analysis of RF Network 1/14 CLIC Two-Beam Module type 0.RF Network. Drive-Beam Main-Beam.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
The NLC RF Pulse Compression and High Power RF Transport Systems Sami G. Tantawi, G.Bowden, K.Fant, Z.D.Farkas, W.R.Fowkes J.Irwin, N.M.Kroll, Z.H.Li,
Evaluation of the TE 12 Mode in Circular Waveguides for Low-Loss High Power Transportation Sami G. Tantawi, C. Nantista K. Fant, G. Bowden, N. Kroll, and.
I. Syratchev, CLIC Breakdown Workshop, CERN, 20 May 2008 Power Circulation in a CLIC Accelerating Structure I. Syratchev.
CLIC Power Extraction and Transfer Structure.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
ON/OFF news. Reflected Transmitted Stroke 8.0 mm RF power, dB Piston position (gap width), mm ON OFF Compact design of the high RF power variable (mechanically)
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
I. Syratchev, HGW 2012, KEK, Japan The high power demonstration of the PETS ON/OFF operation with beam. I. Syratchev for CLIC team.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Update on PETS experiments (Igor for the CLIC collaboration)
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
The status of RF components G. Riddone, M. Filippova RF development meeting on
2010 TESTING PROGRAM AND RESULTS FOR THE CLIC PETS X-BAND WORKSHOP ON RF STRUCTURES, BEAM DYNAMICS AND SOURCES 2 nd December 2010 Alessandro Cappelletti.
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
Two-beam module layout
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Multi-stage pulse compressor
Development of X-band 50MW klystron in BVERI
Manipulating RF phase and amplitude at high power level.
X-band high-power variable RF splitter
An X-band system for phase space linearisation on CLARA
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
RF design of compact X-band waveguide components
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
12 GHz High Power RF components requirements for CEA activities
Summary of the test structure design
F.Marcellini, D.Alesini, A.Ghigo
Rf structure development meeting TBTS component status and use/test at KEK and SLAC G. Riddone, I. Syratchev
CLIC Klystron based. Updates 2017.
Update of CLIC accelerating structure design
CLIC Feasibility Demonstration at CTF3
CLIC Power Extraction and Transfer structure (PETS)
Presentation transcript:

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev, CERN

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Many hundred thousands of waveguide components are needed for CLIC. The fabrication cost and waveguide network logistic are serious issues that are needed to be addressed to make an optimal RF waveguide distribution system. The RF network in CLIC connects at a short distance (~ 0.5 m) broadband decelerating structure (PETS) and narrowband accelerating structure. Thus, all the waveguide components should be optimised to avoid parasitic circulation of the reflected signals in a system. We have developed the special RF components to provide specific to CLIC operational properties. In general, the particular choice of individual components could seriously affect the RF network layout and cost.

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 ON/OFF mechanism CLIC module RF network 3 dB splitter

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May GHz choke mode flange prototype has been tested at SLAC up to 90 MW 200 ns. To allow the independent transverse alignment of the two linacs in CLIC, the special, contact-free choke mode flanges are planned to be used. By specification, the 0.25 mm transverse misalignment should be tolerated. y x Throughout the design, reflection and matched radiation through the choke were minimized In this geometry shift along narrow wall of the waveguide causes severe coupling to the trapped TM 02 mode, which is close to the operating frequency.  y ±0.25mm  y ±0.5mm Choke flange with circular groove choke Matched radiation Reflection S-parameters, dB

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Modified, double-sector choke flange Frequency, GHz S11, dB y x  y ±0.5mm  x ±0.5mm The new geometry allows for ±0.5mm sheer shift in both directions. It also can tolerate twist <1 0 and kink < 3 0. Matched radiation through the choke is below -40 dB. The slot is 2.5 mm wide.

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May Ready to be used as a part of the compact RF/vacuum valve. - Building block of the RF phase stable long waveguide line. It will naturally compensate the thermal expansion without introducing extra RF phase advance. - Rotatable (360 0 ) high RF power waveguide contact free joint (with circular grove). Designed for C-band medical accelerator. Polarizer converts H 10 in rectangular WG into rotating H 11 in a circular WG Choke flange Choke flange. Other applications Mini UHV gate valve

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May dB H-plane splitter The GHz version of the splitter was tested at SLAC up to 150 MW x 260 ns. Compact vacuum pumping port (design) S11, dB Radiation into the vacuum port S-parameters, dB

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 S11,S12 S13,S14 3 dB hybrids (WR90) CLIC choice. 32 MV/m surface E-field at 100 MW. H-plane#1 H-plane#2 E-plane SLAC-type KEK-type

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Cross Potent family H-plane E-plane Hybrid solution

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Reflected Transmitted Stroke 7.7 mm RF power, dB Piston position (gap width), mm ON OFF Compact design of the high RF power variable (mechanically) reflector Radiation through the chokes The variable reflector is a core element of the PETS ON/OFF mechanism. It is activated when the local termination of the RF power production in PETS is required. S-parameters, dB

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Influence of the external waveguide circuit bandwidth on the PETS RF power production Variable reflector with compact H 20 -> H 01 mode convertor Phase, deg. Amplitude PETS output signal Amplitude Phase, deg. Time, ns

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 PETS ON/OFF operation Power to the structure Power extracted from the drive beam The simulations have been done with HFSS, when the discrete current elements were representing the steady state current at a fixed frequency. ON OFF

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 High RF power variable reflector. Other applications Variable attenuator (phase shifter) Variable splitter Load (short circuit)

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 X-band moderate peak power ‘dry’ RF load with SiC absorber (design). The 15 MW peak RF power loads are the most common components in CLIC module. ~ loads will be needed for 3 TeV CLIC option. 100 mm Max. E-fields on the ceramic surface tangential normal 15 MW SiC

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 X-band high peak power (>50 MW) broadband ‘dry’ stainless steel load. Pulsed heating distributions along the load: H-field plot (quarter of the period) Design specifics Load regular part cross section E The load half Matching taper WR90 We have received about 50 loads. The companies provide very reproducible results with reflection <-30dB at frequencies above GHz. The loads have been tested up to 60MWx400ns (KEK) and 25MWx1600ns (SLAC). Loads #36-39 Green – design Red - measured