T ransmission I mprovement For the Red River Valley & West Central Minnesota.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Goshen Area Bus Reconfiguration
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
1 Local Area Planning Update to TRANSAC – December 16, 2014.
North Mankato Load Serving study Xcel Energy Great River Energy.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Buffalo Ridge Incremental Generation Outlet (BRIGO) Transmission Study Presentation to National Wind Coordinating Committee June 22, 2005 W Grivna, PE.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Xcel Energy Projects From 2008 Reliability Assessment.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
Borah Mitigators Remedial Action Scheme for the Borah West Path Sponsored by: IDAHO POWER Team Members: Kyle Jones Mark Magee Jason Rippee.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
CapX 2020 Transmission Initiative Progress Through An Alliance Approach American Public Power Association E & O Technical Conference Atlanta, Georgia April.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
NSP System. NSP Supply Plans: Generation and Transmission Betsy Engelking Betsy Engelking Director, Resource Planning Director, Resource Planning Xcel.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
2011 Transmission Customer Meeting October 12, 2011.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
US Army Corps of Engineers BUILDING STRONG ® Corps Reservoirs Elizabeth Nelsen and Brian Johnson Hydraulic Engineers 29 Mar, 2012.
US Army Corps of Engineers BUILDING STRONG ® Corps Reservoirs Brian Johnson and Elizabeth Nelsen Hydraulic Engineers 04 Oct, 2012.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
2008 Referenda Analysis Minnesota School Boards Association MinnSPRA Power Hour.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Barrilla Junction Area Transmission Improvements Project
Local Area Planning Update to TRANSAC – December 21, 2016
Local Area Planning Update to TRANSAC – September 15, 2016
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Central Louisiana Crossroads.
The good life by the lake.
Local Area Planning Update to TRANSAC – September 26, 2018
Yale Runback Local Area Protection Scheme
Photo Album Automatic bollard installation for access restriction in the central area of the city.
TONBRIDGE POWER GREEN LINE
Montpelier & Powder River 5-year Studies
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

T ransmission I mprovement For the Red River Valley & West Central Minnesota

Red River Valley Area Fargo-Moorhead.

Red River Valley

Load 2004: 1029 MW 2011: 1223 MW 2016: 1315 MW

Red River Valley

Studies Identified Several Critical Contingencies  Loss of Bulk Lines Center-Jamestown-Maple River Dorsey-Forbes  Local load-serving benefits Alexandria St. Cloud Loss Reduction of approximately 100 MW Real-time Installation of Bemidji – Grand Rapids 230 kV Line shows delay of project need by approximately 4 years Projected need in Fargo area in 2018

Alexandria Area  Loss of Grant County – Elbow Lake Line causes low voltages  Breaker and capacitor addition postpones local-area need until 2013 or 2014  Loss of Elmo – Inman or Verndale – Wing River also causes problems when combined with Grant County line

St. Cloud Area  Loss of Benton County – Granite City 115 kV DCTL causes low voltages and severe overloads  St. Regis load dropped automatically  Cannot reconfigure Granite City without new area source to provide support

The End