Preparing a Post Bid Report Preparing a Post Bid Report NYS OGS Design & Construction Group Cost Control.

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Construction Engineering 221
MASBO February Information to purchase Services Information to purchase Construction.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
© 2007 Pantavanij Co., Ltd. All Rights Reserved Total Procurement Solution Presentation Online Auction (Sealed Auction)
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
PURCHASING 101 HOW TO BEGIN. Is the purchase available from the District Warehouse?  Online catalogs are/will be available on the district web page for.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
State Use Act Enter a Requisition in Datatel. Step 1: Accessing REQM Screen There are two ways to access REQM. Option 1. Click on Navigation, scroll down.
For West Virginia Department of Education DISCLAIMER This PowerPoint presentation serves only as a snapshot of purchasing regulations. Please visit the.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Change Orders. Build the project that was bid and awarded.
PROCUREMENT PROCESSING Tammy Froscher, Procurement Property Technician U.S. Fish and Wildlife Service, LSRCP Program Office March 17, 2011.
Sole Source Training.
Rachel Weaver Program Manager Maryland Energy Administration
Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Project Kick-Off Meeting for with Project Manager Name,
ACTION PLAN LIN ASSISTANT ENGINEER KUNMING-CHINA.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Chart Your Course to Business Success On Target Business Intensive: Session 7 May 8, 2012 Advisors On Target 1.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
1 Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Task Order Competition (TOC) Process.
For Real Estate Agents Farming Equipment Heavy Equipment Real Estate Motor Vehicles.
How to Select and Pre-screen a Home Improvement Contractor.
United Nations Procurement Division
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Specification & Quantities Estimating
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Monitoring and 638 Contract Close-out. Contract Monitoring and Close-out After Award ▫ Meet with Tribe to discuss the Agreement  Include Monitoring Plan.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
Municipal Assistance Bureau Recommended Bid Analysis Procedures June 24, 2014.
PREPAREDBY: PREPARED BY: Ahmed Al Tayeb Saed Al Qeshawe Tareq Amen Abdalla Syiam SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Invitation to Qualify Training Services CONTRACT  Begin Date August 15, 2011  End Date December 31, 2016  Enrollment Period Ongoing.
Office of Procurement Services.  Vendor Application Website: 
Child Support Director’s Association 2007 Training Conference Administrative Audits Presentation #107 September 18, 2007.
HOW TO DO BUSINESS WITH THE CITY OF ATLANTA Department of Procurement Presented by: Keith O. Brooks, CPPO.
Agenda – JOC Gordian Construction Task Catalog Understanding the Construction Task Catalog ® (CTC) Calculating the Bid Contractor Adjustment Factors Risk.
Doing Business With the U of I Facilities and Services Construction Division Overview of Construction Programs and Contracting Processes Gary Biehl, Assoc.
PURCHASING 101 SECTION 1 - How to Begin. Is the purchase available from your agency or from other state agencies? ⋆ State Surplus Property ⋆ State Fleet.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
Introduction to Procurement for Public Housing Authorities Small Purchase Procedures Unit 4.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Award Management Services
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Request for Proposal - Best Value
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Request for Proposal & Proposal
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Engineering Project Tendering.
Request for Proposal - Best Value
Security Equipment RAF/2012/00030 Compulsory Briefing Session
DEFINING REQUIREMENTS (REV. 05/22/2008)
Team Check-Up Orientation Briefing
Presentation transcript:

Preparing a Post Bid Report Preparing a Post Bid Report NYS OGS Design & Construction Group Cost Control

Agenda 15% Timing What it is & Why we need it Questions/ I nformation Post Bid Report and Results Forms Sample Comments

15% Rule 15% Rule  Post Bid Report is required if: The low bidder is over or under 15% from your estimate. The difference between the 1 st and 2 nd low bidders is more than 15%. Division of Construction holds a Pre-Award Meeting with the low bidder. The low bidder is the sole bidder. Or if you receive specific notification from us that we require additional information from the low bidder.

Timing  Reports are to be completed within three days of the bid date. Keep in mind that mistakes by the low bidder are sometimes found when reviewing their estimate. The low bidder has only five business days from the bid opening to withdraw their bid when a mistake is found, so timeliness is important! oRefer bidder to Spec section Instruction to Bidders Item 8, Withdrawal of Bid oInstruct Bidder to contact Frank The Division of Construction’s field staff may call a pre-award meeting with the low bidder. The Engineer In-Charge needs at least a draft of the Post Bid report before the pre-award meeting in order to help him assess if the low bidder is qualified to perform the work of the contract. Note Spec section – Qualifications of Bidders item 18.2 which requires bidders to furnish OGS with information including a detailed estimate of their bid.

What it is & Why we need it  A report that summarizes a detailed review and investigation of the low bidder’s estimate vs. the government estimate and includes: A comparison of our estimated costs against the low bidders. Explanations of the major differences identified. An indication that the low bidder understands the scope of work and that they can perform the work satisfactorily at the price bid. A recommendation to award or re-bid the project.  This report is sent to the OGS Team Leader, client agency, construction staff and the contract award unit. It is then forwarded to the Office of State Comptroller to assist them in awarding the contract.

Questions/Information Questions/Information  Contact only the low bidder, their phone number will be listed on the report page. Note whom you spoke to and when.  Has the low bidder included all items of the scope of work?  Where are the major differences between your estimate and the bid? Explain in detail each of the major differences Include the description, quantities, unit prices and total cost for the main items of work.  Has the low bidder visited the site?  Has the low bidder worked for OGS before? If the low bidder has not worked on OGS projects, then list similar projects they have worked on  completed report to

Sample Post Bid Report List the major items of work from your estimate. And compare to the low bidders costs Answer these questions Explain the differences Make a recommendation

Sample Comments …  The low bidder has reviewed his bid and has included all items of the scope of work.  The_____was (added/increased/decreased/deleted) on the final contract documents after the final estimate was completed.  The low bidder is comfortable with their bid and their ability to perform the work of the contract.  The differences between the contractor’s estimate and OGS’s were found to be reasonable following discussions with the low bidder.  The low bidder is experienced with this type of work and is satisfied with their estimate.  The contractor owns his equipment and has not included these costs in the bid. The OGS estimate used rental costs for equipment required.

Sample Comments Cont’d….  The low bidder is already on site with another ongoing project and would be realizing cost savings in supervision, equipment, ______, _______.  The low bidder has worked at this facility previously and has adjusted his labor based on his experience there.  The OGS estimate based it’s cost for_____from a similar project, however________  The higher costs for _____appear reasonable, based on recent bid results.  The unit cost for _____differ because of competitive quotes from suppliers.  The low bidder will use a working foreman and therefore has included no supervision costs.  The contractor has his own disposal site thus reducing demo and disposal costs.

For Further Assistance … Bureau of Cost Control NYS OGS Design & Construction Group Scott Downing, CCC Ph Fax