BEST VALUE PROCUREMENT. What is BVP? A procurement process where price and other key factors can be considered in the evaluation and selection process.

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Innovative Contracting
Fair and Reasonable Pricing
Contracting for Laboratory Services Ann Mullin Cleveland US Geological Survey Presented to the Environmental Protection Agency Science Advisory Board April.
Grant Reviews A Tutorial on How to Participate on a DD Council Grant Review Panel Play.
Best Value Procurement MnDOT State Aid for Local Transportation Minnesota Local Road Research Board MnDOT Office of Construction and Innovative Contracting.
Indicator 3.10 part II Employ product-mix strategies to meet customer expectations.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
1 Bid And Proposal Evaluation Bill Shelton Scott Norton
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
Standards Aligned Systems MANDATE WAIVER PROGRAM 2008.
Human Resources Management. Poor HR…  Hire wrong people  Staff under performs  Employee dissatisfaction…attrition  Difficult employees  Under utilize.
Alternative Project Delivery
Andrea O’Neill Cost/Price Analyst ACC-RSA. Elements of a Proposal; Proposal Example Indirect Rate Calculations Unallowable Costs; Preparing For Negotiations;
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Environmental Management Systems Implementation. CH EMS Experiences CH conducted EMS audits of BNL’s EMS as required by a EPA MOU CH assisted the Yucca.
Department of Chemical Engineering, University of Michigan, Ann Arbor 1 6/9/2015.
PROCEDURES FOR SELECTING THE CONTRACTOR
CHAPTER Section 15.1 Hiring Decisions Section 15.2 Training & Motivating Employees Staffing Your Business.
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
Contract Financing Theresa A. Stevens March 12, 2007 Part 2 Non-Commercial Item Purchase Financing FAR Subpart 32.1 PIP Level II Presentation.
Procurement Presentation Alan Brett Contracts Officer HSE.
1 IMC Planning Knowing the Score In IMC, a plan is similar to a musical score. The IMC plan details which marketing communications and media should be.
Other Planning Processes: Final Planning Touches
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
1 WELCOME TO Electrical Safety Arc Flash/Blast Injury Prevention Management/Supervisory Course.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Department of Chemical Engineering, University of Michigan, Ann Arbor 1 9/9/2015.
Source Selection. What is Source Selection? Source Selection is the process of conducting competitive negotiations. Source Selection allows the Government.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
EXAMPLE – Quality Control Plan For Consultants
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
Building Individual Professionalism in Construction Since A Valid, Reliable & Fair Direct or Indirect Measure for ACCE Construction Program Student.
University of Palestine - Gaza Faculty of business& IT – Project Management Chapter 2 Project Definition.
Office of Pipeline Safety Qualifications of Individuals: Protocol Review Integrity Management Workshop July 23-24, 2002.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Formative assessment of the Engineering Design process Review questions in handout Write brief, informal answers to each question.
© Copyright 2005 TEM Consulting, LP - All Rights Reserved Presentation To EAC Aug. 23, 2005 Hearing, Denver, CORev 1 – 08/16/05 - HSB Considerations In.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Stockton University Purchasing and Grants 11/4/15.
D irect C ommercial S ales D irect C ommercial S ales F oreign M ilitary S ales F oreign M ilitary S ales & & A Comparison: July 2015 SCM-OC/SCM-OC-X.
Requirements of Documents for Quality Management System ISO 9001 Certification.
Serving the Public. Regulating the Profession. Structural Engineering Specialist: Meeting the spirit of Elliot Lake recommendation
CPARB GA Issues John Lynch Department of General Administration Engineering & Architectural Services.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
MiAPPA Conference Summer 2009
Commercial Item Acquisitions: A Brief Update
Operations Management
A Comparison: Direct Commercial Sales & Foreign Military Sales
Award Management Services
Qualification Criteria and Available Tender Capacity
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
Request for Proposal - Best Value
الوحدة 20 مهارات التواصل مع الآخرين
Request for Proposal & Proposal
Request for Proposal - Best Value
PROJECT DELIVERY METHODS
Job Analysis & Job Descriptions
Design-Build Acquisition and Contract Incentives July 19, 2018
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
PLANNING & SCHEDULING (First Part)
Design-Build Acquisition and Contract Incentives May 9, 2019
Quality Assurance and msds indicator 9 training Department of radiology,FMU,Faisalabad DR M SAQIB MUNIR,MBBS,MASTER OF PUBLIC ADMINISTRATION,CERTIFIED.
Presentation transcript:

BEST VALUE PROCUREMENT

What is BVP? A procurement process where price and other key factors can be considered in the evaluation and selection process to minimize impacts and enhance the long-term performance and value of construction. Traditionally, price has been the sole factor considered in selection of construction contractors by state departments of tran- sportation. Best-value procurement allows other factors, such as qualifications, schedule, quality, and performance-based criteria, to be used in evaluation and selection. MnDOT and the FHWA do not consider the use of A+B, lane rental, or incentive/disincentives as best-value.

When to use Best Value? Best value procurement is most useful when a project has unique objectives or challenges. That may be difficult to meet using traditional low-bid procurement The series of questions shown in the checklist below can be used to help determine if a project is a good candidate. If the answer is “yes” to most of the questions, the project may be suitable for best value procurement. If the answer is “no” to some of the questions, the project may still be a good candidate, but careful consideration should be given to whether or not those items with a “no” answer can be successfully addressed.

Determine Best Value Criteria Determine the pass/fail best value evaluation criteria that will be used in the procurement. Evaluation criteria should be based on the elements that will bring the most value to the project. The following categories of evaluation criteria can be used with this approach: Qualifications of Personnel – Certain work tasks may benefit from personnel with specific licensure, training, or certifications. Establish pass-fail criteria based on the needs of the project. Experience of Personnel on Similar Projects – The personnel that will perform the work on the project should have experience on similar projects. Establish pass-fail criteria requiring minimum experience levels. Experience of Contractor on Similar Projects – Experience with projects of a similar size, type or complexity may benefit the project. Establish pass-fail criteria requiring minimum experience levels. Availability of Key Personnel, Equipment or Materials – Establish the required personnel, equipment or materials that will be necessary to successfully complete the project. Contractor will indicate availability of these items in the proposal. Ability to Meet Completion Date.