Results from the 2013 Survey of LSEs to Obtain Retail DR and Dynamic Pricing information Public Summary Frontier Associates LLC June 2014 1.

Slides:



Advertisements
Similar presentations
Time-of-Use and Critical Peak Pricing
Advertisements

1 The Potential For Implementing Demand Response Programs In Illinois Rick Voytas Manager, Corporate Analysis Ameren Services May 12, 2006.
1 Distributed Generation Task Force November 5, 2007.
Retail DR and Price Response 2014 Product Headcounts Paul Wattles, ERCOT Market Design & Development DSWG Feb. 3, 2015.
Price Responsive Load / Retail DR Workshop Paul Wattles Karen Farley DSWG/REP Workshop April 9, 2014.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
Presentation Overview
1 Price Elasticity of Demand in Current Zonal Market PUCT Demand Response Workshop (Project No ) Jay Zarnikau Frontier Associates January 2007.
Measurement, Verification, and Forecasting Protocols for Demand Response Resources: Chuck Goldman Lawrence Berkeley National Laboratory.
Price Responsive Load / Retail DR Data Collection Project and Lessons Learned Paul Wattles Karen Farley DSWG March 2014.
Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley DSWG and RMS sub team October 16, 2012.
Retail Smart Grid Trends Paul Wattles Senior Analyst, Market Design & Development UT Energy Week: “How Smart Grids Enable Consumers” Feb. 18, 2015.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
Price Responsive Load / Retail DR Update to RMS Karen Farley June 3, 2014.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Price Responsive Load / Retail DR Workshop Paul Wattles Karen Farley DSWG/REP Workshop April 2014.
Price Responsive Load Survey Draft Results Paul Wattles Karen Farley DSWG and RMS Aug. 22, 2012.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
An Approach to Adjust ERCOT’s Long-Term Load Forecast for Utility Energy Efficiency Programs Jay Zarnikau Frontier Associates LLC June 10, 2013.
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
ERCOT Demand Response Spring 2015 ERCOT Operator Seminar.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Weather Sensitive ERS Training Presenter: Carl Raish Weather Sensitive ERS Training Workshop April 5, 2013.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
1 Knowing Your Customers Better Through Load Research Presented By: Lawrence M. Strawn Senior Retail Pricing Coordinator Orlando Utilities Commission September.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
1 UFE Workshop Sponsored by COPS October 19, 2004.
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
1 Demand Response A 28 Year History of Demand Response Programs for the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and Forecasting.
DSWG – March 9, 2015 Four-CP Response in ERCOT Competitive Area Carl L Raish.
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish October 6, 2015.
Sept. 28, 2007 Interim Update Load Response Survey.
Price Responsive Load / Retail DR Workshop Paul Wattles Carl Raish Karen Farley REP Roundtable August 5, 2015 – Updates in RED.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
Retail DR and Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley Updates to DSWG & RMS January 2013.
Profiling Working Group August 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting August 14, 2003.
Price Responsive Load / Retail DR DSWG Update Paul Wattles Carl Raish September 17, 2015.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Price Responsive Load / Retail Demand Response 2013 Analysis Report Overview ERCOT Staff & Frontier Associates RMS Meeting August 5, 2014.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
Status Report on DSWG Task 11: Retail DR/Dynamic Pricing Project Presentation to the ERCOT Demand Side Working Group Jay Zarnikau Frontier Associates LLC.
Building Blocks for Premise Level Load Reduction Estimates ERCOT Loads in SCED v2 Subgroup July 21, 2014.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
DSWG - June 25, Four-CP Response for Transmission- and Distribution- Connected ESIIDs in ERCOT Competitive Area Carl L Raish.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish September 1, 2015.
Distributed Renewable Generation Profiling Methodology ERCOT Load Profiling March 4, 2008.
Draft NPRR Weather Sensitive ERS Loads December 2012.
2015 SDG&E PTR/SCTD Evaluation DRMEC Spring 2016 Load Impact Workshop George Jiang May 11 th, 2016 Customer Category Mean Active Participants Mean Reference.
Analysis of Load Reductions Associated with 4-CP Transmission Charges in ERCOT Carl L Raish Principal Load Profiling and Modeling Demand Side Working Group.
Principal Load Profiling and Modeling
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Settlement Timeline Workshop
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Behavior Modification Report with Peak Reduction Component
The Retail Perspective
Presentation transcript:

Results from the 2013 Survey of LSEs to Obtain Retail DR and Dynamic Pricing information Public Summary Frontier Associates LLC June

Background PUC Subst. Rule §25.505(e)(5): Load serving entities (LSEs) shall provide ERCOT with complete information on load response capabilities that are self-arranged or pursuant to bilateral agreements between LSEs and their customers. ERCOT sent an electronic survey to all LSEs in June-July of 2013 seeking customer counts on dynamic pricing/demand response contracts –‘Your response to the survey will allow ERCOT to gain a better understanding of the amount of responsive Load and numbers of retail energy consumers actively responding to Load reduction signals’ 2

Purpose of the project It’s important to understand retail DR & price response Impacts of retail demand response and price response on the long term load forecast Advanced metering – Enablement of DR is an important element in the return on the AMI investment Ability to track growth of these products is a key metric in measuring the success of the ERCOT retail market 3

Background The survey revealed the numbers of current customers in the ERCOT region subject to retail price response/demand response products, including:  Time of Use pricing  Critical Peak pricing/rebates  Real-Time pricing  Direct Load Control  4CP response For REPs in the competitive market, the survey did not ask for the LSE’s estimates of the MWs of demand reduction or strike prices ERCOT then worked with Load Serving Entities to develop a plan for collecting and analyzing data 4

Project path Phase 1 – Initial Survey – Results presented to market in Aug 2012 (RMS and DSWG) Phase 2 – Data collection – Collected ESIID information from REPs Summer 2013 – Additional survey used to collect events from REPS – Phone calls with NOIEs Phase 3 – Analysis – After data collection, evaluation of price elasticity and how it affects: Load forecasting Wholesale market price formation Resource adequacy Phase 4 – Report to market We are here! 5

Evaluation Project ERCOT worked with Frontier for analysis and reporting – Defined approach, data requirements for a subset of the categories – Report on findings and results including presentations to stakeholders – All data is anonymized and Frontier signed NDA Using the information collected from the survey and customer usage information in ERCOT’s possession, our analysis sought to quantify the amount of demand reduction that ERCOT could expect from these various programs and products during various events (e.g., a potential 4CP event or a spike in wholesale market prices). 6

Summary Statistics 7

21 REPs submitted validated ESIIDs to ERCOT 177,451 ESIIDs with validated submissions – 18,385 were excluded from analysis 1,780 ESIIDs became inactive/de-energized after June 15 and still not active 2,214 ESIIDs became inactive/de-energized after June 15 and went to different REP 956 ESIIDs became inactive/de-energized after June 15 and returned to same REP 13,322 ESIIDs stayed and went to different REP – 117,570 ESIIDs were reported on Time of Use pricing products TOU products are incentives for long-term behavioral shifts rather than event-based demand response. Analysis of these products and premises is beyond the scope of this initial analysis and is deferred to a future project. – 41,496 ESIIDs remained for analysis by Frontier 8

Summary Statistics 9 Premises participating in multiple programs Premises participating in a single program

Approach to Quantifying Changes in Demand Associated with DR Actions Identify “events” (e.g., price spikes, days with a high probability of setting a CP, curtailment requests). Historical baseline method: Look at load patterns for a set of customers on previous days and compare (after making appropriate adjustments) with the load shape on the day of the event. Regression analysis: Estimate the average impacts of various events on consumption of the customer(s), while statistically controlling for the effects of other factors which might affect energy consumption (including the weather). IMPORTANT NOTE: All data was anonymized with REP and NOIE identities masked by ERCOT prior to providing to Frontier. 10

Approach to Quantifying Changes in Demand Associated with DR Actions 11 ProgramData SourceMethod of Analysis OLC - Other Load Control  15-minute interval consumption data (anonymized) from 05/01/2013 to 10/15/2013 for each ESI ID in this type of program.  Event information, as reported by two REPs operating larger programs (including start and stop times).  Start date for participation in the program, as reported by REP, for over 10,000 ESI IDs.  Baseline analysis focused on events as reported by REPs. Impacts were calculated on a customer-specific basis, for each program. An historical baseline was constructed, same as the ERCOT ERS “Middle 8-of-10” methodology, and actual usage was compared against baseline usage to estimate demand response 4CP  Aggregated IDR data for consumers served at transmission voltage for each regulated transmission and distribution utility (TDU) service area from 2001 to early  Frontier’s evaluation was limited to use of aggregated (non- individual) data.  The ERCOT staff then conducted supplemental baseline analysis (using a different baseline approach) of individual accounts that showed evidence of demand reduction during a 4CP.  A probabilistic analysis (logistic regression) was conducted to identify the days most likely to have elicited a 4CP response, based on weather, time of day, and other factors.  Baseline analysis focused on actual and potential 4CP days (summer weekday afternoons). Baselines excluded weekend days, holidays, prior CPs, and near-CPs.  Additionally, a regression model quantified the response of the aggregate usage of the transmission voltage customers in each TDU service area to 4CPs and “near 4CPs,” while controlling for other factors.

Approach to Quantifying Changes in Demand Associated with DR Actions 12 ProgramData SourceMethod of Analysis RTP (Real Time Pricing) and BI (Block & Index)  Anonymized data for 4,100 RTP customers and 23,000 BI customers (10/15/ /15/2013), along with location-related information for each account.  Wholesale price data.  Start date for program, as reported by REP, for each ESI ID enrolled in this type of program.  Weather data.  Regression baseline focused on pricing events, defined as LZ SPPs at three distinct price levels: o $300/MWh o $1,000/MWh o $3,000/MWh  Additional models were estimated looking at single price spike levels (e.g., just $3,000MWh).  An historical baseline was constructed, same as the ERCOT ERS “Middle 8-of-10” methodology, and actual usage was compared against baseline usage to estimate demand response. PR (Peak Rebate)  15-minute interval consumption data (anonymized) for each ESI ID in this type of program.  An historical baseline was constructed, same as the ERCOT ERS “Middle 8-of-10” methodology, and actual usage was compared against baseline usage to estimate demand response.

4CP Response: A Summary 13 See Appendix for additional 4CP information. Estimated Average Demand Response During a 4CP in 2013 Total MW Demand Response from Energy Consumers Served at Transmission Voltage in Competitive Areas (regardless of their participation in formal programs) (1) 250 Programs Implemented by NOIEs (2)200 Other Load Control Programs activated during a CPSmall RTP and B&I Programs (incidental impacts during a CP)Small Rough Estimate of Other Response not otherwise accounted for (3)50 TOTAL500 Notes: (1) An historical baseline calculation yields an estimate of 251 MW. Regression analysis suggests a reduction of 201 MW on average over the past 5 years. (2) Based on a review of savings estimates reported by NOIEs. We have been unsuccessful in independently confirming these estimates. (3) This is a conservative estimate based on judgment, to account for response by industrials with IDRs served at a voltage other than transmission and industrials within NOIE service areas.

Customer Segment Providing the 4CP Response 14

Energy Consumption (in kWh) by Transmission Voltage Customers on CP of June 27, 2013, Contrasted against Baseline Energy 15 Zooming In...

Energy Consumption (in kWh) by Transmission Voltage Customers on CP of July 31st, 2013, Contrasted against Baseline Energy 16 Zooming In...

Energy Consumption (in kWh) by Transmission Voltage Customers on CP of August 7th, 2013, Contrasted against Baseline Energy 17 Zooming In...

Energy Consumption (in kWh) by Transmission Voltage Customers on CP of September 3rd, 2013, Contrasted against Baseline Energy 18 Zooming In...

Distribution of the 4CP Response in 2013 by TDU Service Area 19

Load Control Programs NOIE programs indicate a potential for demand reduction of well over 200 MW Four REPs reported programs; two provided data Demand response estimates from the REP programs are quite small in comparison to the NOIEs – Numerous self-initiated events were reported Many were too short in duration to provide a meaningful database for analysis Many involved only a small subset of total enrolled premises – Estimated event-specific demand response not reported publicly due to low number of participating REPs Reported participation provides a benchmark for analyzing growth in this product type in future years 20

Peak Rebate Programs These programs had fewer than 2,000 participants in areas opened to retail competition in 2013 Participants are mainly residential energy consumers It appears as though only one of the two REPs offering this type of program used it in 2013 – probably due to the low number of price spikes (see Appendix) Estimated demand response not reported publicly due to low number of participating REPs 21

Response to a Price Spike Estimated Demand Response During a Spike in Wholesale Energy Prices in 2013 (1,2) (For a Load Zone Settlement Point Price above $3,000/MWh) Total MW RTP and B&I Programs Customers with IDR Meters180 Customers with AMS Meters2 Rough Estimate of Other Response not otherwise accounted for (3)50 Load Control Programs Implemented by NOIEs200 Peak Load Rebate Programs0.5 TOTAL432.5 Notes: (1)There were very few price spikes in ERCOT in 2013 (see Appendix). Consequently, many programs were not activated and the estimates here do not reflect potential demand reduction. (2)Methodology: Regression analysis. (3) This is a conservative estimate based on judgment, to account for response by industrials with IDRs served at a voltage other than transmission and industrials within NOIE service areas. 22

Response to Price Spikes by Consumers with IDR Meters in Competitive Areas 23

Response to Price Spikes by Consumers with IDR Meters in Competitive Areas– Baseline Approach 23 Intervals with North Zone price higher than $3000/MWh are selected as price spikes. The ERCOT ERS “Middle 8-of-10” methodology was adopted. Note that Feb 2 nd, 2011 price spike event was deleted due to overlapping ERCOT EEA and ERS deployment. EventsDate # of customers in the program MW Saving 23/3/ /27/ /1/ /2/ /3/ /4/ /5/ /23/ /24/ /5/ /3/

Observations Yes, the demand side of ERCOT’s market responds to price signals (e.g., spikes in wholesale prices and 4CP-based transmission prices). Gaps in the data and the small number of price spikes in 2013 may have prevented us from detecting the full potential of these programs and pricing products in reducing demand during “events.” 24

Next Steps 2014 data collection project – September 30, snapshot by REPs for which ESI IDs are in programs – November 1, file submission to ERCOT* – November 15, error correction file submission to ERCOT * pushed file submission back by 2 weeks to allow any error handling to be completed prior to Thanksgiving Holiday REP should make all necessary corrections and re-send the full file to ERCOT. ERCOT will use the last file sent for data analysis. – November 15, 2014 – ERCOT will send Survey Monkey links to REPs to gather REP-specific event information TOU Analysis – What are our expectations? – What can we accomplish without asking REPs for more data? 25

APPENDIX 26

Pricing Events -- June June 2013, North Load Zone 28

Pricing Events – July 3000 July 2013, North Load Zone 29

Pricing Events – August Aug. 2013, North Load Zone 30

Pricing Events – September Sept. 2013, North Load Zone 31

4CP Background The Four Coincident Peaks in ERCOT are the highest-Load 15-minute settlement intervals in each of the four summer months (June, July, August, September) These intervals are the basis of various Transmission & Distribution (T&D) charges for much of the ERCOT Load – Non-Opt In Entities (Muni’s and Co-ops), at the boundary meter level – Retail Choice customers with peak demand ≥700 kW (Interval Data Recorder meter required) Combined, over 44% of total ERCOT Load is subject to 4CP charges Chart represents percentages of Load at IE 1700 on Aug. 3, 2011, ERCOT’s all-time system peak “Large C&I” = IDR Required Retail choice load 31

How 4CP Works – Simple average of the metered load during ERCOT system monthly peak 15-minute intervals in four summer months -- June, July, August & September – Multiplied by the applicable prevailing TDSP Tariff, as approved by PUC – Is the basis for the monthly 4CP-based rates for the following calendar year 32

Historic 4CP Intervals ( ) Most common 4CP intervals are between 4:15 and 5:00 PM Mondays and Fridays are the least likely 4CP days August 13, 2007, is the outlier 33

Summer peak interval trends IE 17:00 34

Summer peak interval trends IE 17:00 35

Summer peak interval trends IE 16:45 36

Summer peak interval trends IE 16:45 37

38 The 4CP price signal CREZ project activation = new 4CP incentives >$5.2B in new facilities energized in 2013 – 5 times the average – These dollars will be recovered via 4CP TCOS rates over 30 years Source: ERCOT Transmission Projects Information Tracking (TPIT) Report, Nov Date ‘Postage Stamp’ TCOS Rate (per 4CP kW) 4/16/2010 $ /8/2011 $ /12/2012 $ /23/2013 $ /30/2013 $ /19/2014 $41.08 } 58% increase in 4 years