West Bench Water Upgrade: Progress Report Michael Brydon Director, Electoral Area ‘F’ Regional District Okanagan-Similkameen 2 April,

Slides:



Advertisements
Similar presentations
Major Expenditures Introduction
Advertisements

The Difference Between Renting and Owning a Home
Farmland Values and Leasing Key Questions Chapter 20 §What determines the value of farmland? §What are the advantages and disadvantages of owning vs. leasing?
Chisholm Trail Special Utility District Open House September 19, 2009.
Regional Water Service Development Cost Charges Update October 2014 Bryan Shoji, P.Eng. General Manager, Infrastructure Services.
Financial Management F OR A S MALL B USINESS. FINANCIAL MANAGEMENT 2 Welcome 1. Agenda 2. Ground Rules 3. Introductions.
Capital Budgeting. Cash Investment opportunity (real asset) FirmShareholder Investment opportunities (financial assets) InvestPay dividend to shareholders.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
DECEMBER 15, :00 PM TWSD RATE ADJUSTMENT HEARING.
4. Project Investment Decision-Making
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
CONCEPTS of VALUE. FACTORS OF VALUE UTILITY –THE ABILITY OF A PRODUCT TO SATISFY HUMAN WANTS. RELATES TO THE DAMAND SIDE OF THE MARKET. SCARCITY –THE.
Unit 4: Utilizing Financial Documents
Buy vs. Lease a Home Jeffrey Scheinost – Organizer Stephen Casey – “Techie” Omabamid Odubela – Summarizer Mohammad Fazil – “Techie” EGR 403, Summer 2004,
Credit Intro to Credit & Establishing Good Credit.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Partial Budgeting AAE 320 Paul D. Mitchell. Goal 1.Explain purpose of partial budgets 2.Illustrate their structure and use 3.Give some examples.
Building: Knowledge, Security, Confidence A Roof Over Your Head FDIC Money Smart for Young Adults.
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
2014 Budget Department Presentations Infrastructure Funding Options.
LLANO COUNTY MUD #1 ROAD PROJECT REVIEW PURPOSE DISCUSS POSSIBILITY OF COMPLETING REMAINING ROAD UPGRADE PROVIDE FACTS TO INFORM COMMUNITY TO MAKE DECISION.
1 TOWN OF LOCKPORT FINANCIAL REVIEW Focus on the Sewer Plant and Sewer Collection Service.
Accounting and Reporting on an Accrual Accounting Basis By: Associate Professor Dr. GholamReza Zandi
Finance for IT Decision Makers Michael Blackstaff Hugh Pike.
No Money Down Financing Find out how to buy a house with 0.00% down payment.
On Target Group Coaching
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
City of Lino Lakes, Minnesota Financing Plan Highlights Citizens’ Charter Review Task Force March 29,2007 Pavement Management Report Financing Plan Presenter:
Chapter 1 Financial and Economic Concepts 1. Chapter One Objectives 2.
Financing Growth in Local Authorities Alison Scott Assistant Director, Policy and Technical CIPFA.
Jeff’s slides. Transportation Kitchener Transportation Master Plan Define and prioritize a transportation network that is supportive of all modes of.
Elk Grove Water District Water Rate Update and Connection Fees Habib Isaac – Principal April 10, 2013.
EXACTA, S. A. Presented by: Jamie Brazda (Knight) 2/08/2013.
Copyright © Texas Education Agency, All rights reserved. Financial Operating Statement Analysis Statistics & Risk Management 1.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
© Oklahoma State Department of Education. All rights reserved.1 Housing Alternatives Standard Renting vs. Buying.
Pro Forma Income Statement Projected or “future” financial statements. The idea is to write down a sequence of financial statements that represent expectations.
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
Best for the Buck: Using Asset Management for Project Design at Highline Water District Matthew J. Maring, P.E. April 30, 2008.
City of Lino Lakes, Minnesota Financing Plan Highlights Citizens’ Charter Review Task Force May 15,2007 Pavement Management Report Financing Plan Presenter:
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Mohammad Aljawadi PharmD, PhD Clinical Pharmacy Department King Saud University PHCL 431 Sep, 2015.
8-1 Copyright  2007 McGraw-Hill Australia Pty Ltd PPTs t/a Fundamentals of Corporate Finance 4e, by Ross, Thompson, Christensen, Westerfield & Jordan.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Construction Contracts
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
The Discount Rate in the Plan Wally Gibson NWPPC Power Committee – Kah-Nee-Ta July 15, 2003.
Implementation of the Joint Operations Plan Regionalization of the Water Resource Carol Bryck Capstone Project Executive Masters of Public Administration.
CH’NG CHIA YEE CHUA YI MEI NEW SZE YEE ONG WEI LING KOK KHAR HOW
The Importance of Understanding Finance The Parsley Patch! Problem? Solution? Outcome?
UNIT No. 3 Capital Budgeting Nature Significance Technique of Capital Budgeting Pay back Method Accounting Rate of Return Net Present Value Profitability.
IB Business and Management
Real Estate Finance Residential decision making: Buy or lease?
Finance for IT Decision Makers Michael Blackstaff Hugh Pike.
Potential Consolidation of WMWD’s Murrieta Division into EMWD April 15, 2015 Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District
Pricing Mark Fielding-Pritchard mefielding.com 1.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
Housing Deciding between Renting and Owning a House.
Blenheim Residents and Ratepayers Association Submissions and Annual Plan Martin Fletcher 29 April 2013.
Water Rate Presentation City Council Meeting December 14, 2010.
HOME BUYING CASE STUDY JOHN BERKA. 49 years old wife passed away a few years ago Lives in a bigger home worth owes Car payment ,
Internal/External Sales Rate Development Level III
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
Basics of financial management Chapter 12
City of Sisters, OR 2017 Water & Sewer Rate Study
Ind AS 115 – Revenue from Contracts with Customers
13 Income Capitalization Approach
Return to Home Page GEOG 370 May 5,
Communal W/WW Systems: Financial Analysis for Municipalities Ontario Onsite Wastewater Association Convention 2019 Alec Knowles, MASc Senior Consultant,
The Wausau Wastewater Treatment Facility
Presentation transcript:

West Bench Water Upgrade: Progress Report Michael Brydon Director, Electoral Area ‘F’ Regional District Okanagan-Similkameen 2 April, 2012

Purpose of this Meeting Recall: West Bench Water Upgrade Project: 1.New core infrastructure: pump house, old water mains, meters (design has commenced on water mains) 2.IHA-compliant treatment New stand-alone treatment (UV or filtration) Agreement to buy filtered water from Penticton Our task: Decide on a treatment method

New Core Infrastructure REPLACED OR NEWER PVC LINES 1980’S DUCTILE IRON LINE (REPLACED ORIGINAL STEEL) ORIGINAL LINES STILL TO BE REPLACED INTAKE LINE STATUS OF WEST BENCH IRRIGATION DISTRICT WATERMAIN IMPROVEMENT

The Treatment Decision Process UV Filtration Extra- territorial Bulk Do nothing Recommended alternative Referendum “Yea” “Nay” We are here

Decision Criteria for the RDOS In selecting a single alternative to bring before voters in a referendum, the RDOS seeks to: 1.Satisfy all Interior Health Authority (IHA) requirements for safe drinking water 2.Minimize financial, technical, and political risk 3.Minimize overall cost to ratepayers

Cost Comparisons: Apples vs. Oranges High capital cost/ Lower operating cost time Lower capital cost/ High operating cost time Stand-alone treatment Agreement with Penticton

Net Present Value: The Life-Cycle Cost of Each Alternative Step 1: Capital cost capital time Cost ($)

Net Present Value: The Life-Cycle Cost of Each Alternative Step 2: Capital cost net of external grants capital time Cost ($) grants Effective capital cost

Net Present Value: The Life-Cycle Cost of Each Alternative Step 3: Discount operating costs (adjusted for inflation) capital time Cost ($) grant Total effective cost operating

Recall July 2011

Results from July 2011 Open House 1.Find an alternative with low risk AND low cost 2.Change evaluation methodology Life-cycle cost over the expected life of the asset (50 years rather than 25 years) Recognize the high probability that the Sage Mesa water system will require treatment upgrades

Voter Assent for Matched Price? “Assume that the City of Penticton matches the price of the UV option. Please indicate your level of support for this option…”

The “Price Matched” Alternative Step 1: Estimate the 50-year life-cycle cost of the UV alternative (net of Sage Mesa pro-rated buy-in) Step 2: Propose buy-in and annual fee structure such that the 50-year life-cycle cost of bulk water is the same as UV

Fees to Penticton: Grants are for Capital Costs Penticton system buy-in fee: $3.6M RDOS infrastructure costs: $4.96 Grant- eligible costs $2.34M Actual grants available to RDOS A buy-in fee of $3.6M maximizes grant usage $3.38M

Terms of a Bulk Water Deal time A buy-in fee of $3.6M Annual payments of $135,000/year ($0.22/cubic meter) Changes tied to price paid by Penticton ratepayers 50-year life-cycle cost = UV cost: $11.27M

RDOS Recommendation for the West Bench Water System Enter into a “bulk water” agreement with the City of Penticton for filtered water “Price-matched” to UV Term = 25 years (RDOS wanted 50) RDOS owns and operates the water utility on behalf of West Bench residents Sage Mesa has the right (but not the obligation) to buy bulk water from Penticton on the same terms as the West Bench

Benefits of Recommended Alternative: The West Bench Perspective REJECTED 3. Cost: Tied for low-cost alternative 1. Water quality: Penticton’s water is already IHA- compliant 2. Low Risk: Low operational risk for RDOS RDOS retains control of infrastructure and policies

Benefits of Recommended Alternative: The City of Penticton Perspective Source: 2010 Annual Report Penticton Water Treatment Plant With combined West Bench and Sage Mesa demand (less than 1,000 ML/year) Annual capacity: 30,000 ML

Benefits of Recommended Alternative: The City of Penticton Perspective If West Bench purchases bulk water: If West Bench builds its own treatment plant: Penticton Revenue Buy-in fee $3,600,000 Present value of annual fees (50 years, 6% interest, 3% inflation) $3,530,000 Total $7,130,000 Penticton Revenue Buy-in fee $0 Present value of annual fees (50 years, 6% interest, 3% inflation)$0 Total $0

Some Questions to Ponder: Are taxpayers from the City of Penticton “losing money” on the proposed deal? Are Penticton taxpayers “subsidizing” West Bench water?

Understanding the Economics of the Deal: An Analogy… Scenario: You own and operate a condominium at Apex Mountain You use the condo for approximately 100 days per year You would like to rent the condo when you are not using it in order to make money What price should you charge?

Fixed and Variable Costs Mortgage$1,000 Strata fees$200 Utilities$100 Insurance$20 Monthly fixed cost$1,320 Annual fixed cost$15,840 Fixed cost per use $15,840/100 uses$ Variable cost per use (hot tub, cleaning)$11.60 Total “cost per use”$170.00

Pricing Decision Price per night $0 $11.60 Variable cost (friends and family rate) $ Total cost (fixed and variable) “Market price” for condo rentals at Apex Mountain $100.00

Losing Money? Price to “break even”: $170/night Price at “market price”: $100/night Costs Fixed$ Variable$11.60 $ Revenues Rent$ Total profit (loss)($70.00) Costs Fixed$ Variable$11.60 $ Revenues Rent?

Losing Money? Price to “break even”: $170/night (or not rent) Price at “market price”: $100/night Costs Fixed$ Variable$0 $ Revenues Rent$0 Total profit (loss)($158.40) Costs Fixed$ Variable$11.60 $ Revenues Rent$ Total profit (loss)($70.00)

Simpler: Focus on Variable Costs Price to “break even”: $170/night (or not rent) Price at “market price”: $100/night Costs Variable$0 Revenues Rent$0 Total profit (loss)$0 Costs Variable$11.60 Revenues Rent$ Total profit (loss)$88.40

Losing Money on West Bench Water? (Numbers from recent media/CoP) Price to “break even”: $0.39/m 3 Price at “market price”: $0.22/m 3 Costs Fixed Variable $0.39 Revenues Fees$0 Total profit (loss)($0.39) Costs Fixed Variable $0.39 Revenues Fees$0.22 Total profit (loss)($0.17)

How Much per m 3 is West Bench Paying? time Standard Penticton DCC “Excess” payment above standard DCC Effective fee: $0.48/m 3

Water Pricing: Actual Numbers Water fee/m 3 $0 $? Variable cost $0.39 Estimated total cost of providing a cubic meter of treated water Effective willingness to pay for water (based on UV price-match) $0.48

Summary RDOS Recommendation: Price-matched bulk water deal with the City of Penticton Benefits to West Bench: IHA-compliant water Low technical and financial risk Lowest cost (tie) Benefits to Penticton: Better utilization of fixed-cost infrastructure Profitable!

Other Good News 1.Veteran’s Tribute in Selby Park: $24,520 grant from Community War Memorial Program Chris Allen and Cal Meiklejohn taking design lead 2.West Bench walking corridor: $496,155 grant from Province of BC to build pedestrian trail 2.5m wide paved path River Channel bridge to Max Lake Road