Pay for Performance Regulation Donald Tretheway Senior Market Design and Policy Specialist January 11, 2012.

Slides:



Advertisements
Similar presentations
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
Advertisements

JANUARY 14-15, 2014 | NEPOOL MARKETS COMMITTEE Matthew Brewster MARKET DEVELOPMENT | Conceptual design.
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
11 Presentation for ERCOT ETWG FERC Notice of Proposed Rulemaking: Frequency Regulation Compensation in the Organized Wholesale Power Markets (RM )
Procurement Integrity Act (PIA) Overview
Convergence Bidding Overview Margaret Miller Manager, Market Design & Regulatory Policy CPUC Convergence Bidding Workshop August 26, 2010.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
ERCOT Billing, Settlement Disputes & Data Extracts
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
2013 Calendar Year Customer Survey Results
Farm Bill/Dairy Policy February 26, 2014 Dairy Gross Margin, LLC Dr. Scott Brown Agricultural Markets and Policy Division of Applied.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
Stakeholder Meeting February 13, 2008 Interaction between Scarcity Pricing and Demand Response Dongqing Holly Liu, Ph.D. Senior Market and Product Economist.
Review of EDC Solar Long- term Financing Program Analysis January 12, 2012 Center for Energy, Economic, and Environmental Policy DRAFT.
1 Texas Regional Entity Compliance Update July 2007.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
The E-Mod multiplier increases or decreases the amount of premium to be paid during each policy period. What is an Experience Modifier? The Experience.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
California ISO – Internal Use Only Flexible Capacity Requirement CPUC RA Workshop March 30, 2012 Mark Rothleder Executive Director Market Analysis and.
Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.
ISO Comparison – CAISO Alex Lee (ERCOT)
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
School District Accounting Manual Addendum Items and Other Hot Topics for 2007–08 August 2007.
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Transmission Congestion Rights – Credit Perspective April 17, 2014.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Unit-Specific Bid Limits based on Modified Generic Cost.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
ERS Update – DSWG Presentation September 21, 2012.
Demand Forecast Deviations Working Group Presented to: Stakeholder Advisory Committee Presented by: Pat Doran January 24, 2007.
Goal Parameters How Tools Results Increasing Revenues by Optimizing Generation Relative to PJM Forecasted Price Signals.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
SAWG Update to WMS March 4 th, 2015 Brandon Whittle.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
Culminating Project Graham-Kapowsin High School Bethel School District.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
Auction Format and Fiscal Terms New York Task Force Meeting April 28,
CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
Renewable energy support schemes in the Republic of Moldova
Wind Management at MISO
Exceptional Fuel Costs in LMP
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Briefing on 2017 CAISO Policy Initiatives Roadmap
T-D Interface Working Group November 2, 2017 Energy Storage and Distributed Energy Resources Phase 3 (“ESDER 3”) UPDATE Jill Powers.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Pay for Performance Regulation
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

Pay for Performance Regulation Donald Tretheway Senior Market Design and Policy Specialist January 11, 2012

Agenda TimeTopicPresenter 1:00 – 1:15IntroductionChris Kirsten 1:15 – 1:30FERC Order 755Don Tretheway 1:30 – 2:50Changes from Straw ProposalDon Tretheway 2:50 – 3:00Next StepsChris Kirsten Page 2

ISO Policy Initiative Stakeholder Process POLICY AND PLAN DEVELOPMENT Issue Paper Board Stakeholder Input We are here Straw Proposal Draft Final Proposal

FERC Order 755 ISO compliant –Capacity payment based upon energy opportunity costs of marginal unit –Payment of net energy from providing regulation ISO non-compliant –Market based mileage payment –Accuracy adjustment for mileage payment –Inter-temporal opportunity costs implemented in participant’s bid not by the ISO, but must be verifiable by the ISO Page 4

What is mileage and accuracy? Mileage: the absolute change in AGC set points between 4 second intervals Accuracy: comparison of AGC set point to actual telemetry 1.Mileage adjustment for under-response 2.Hourly percentage for response accuracy to AGC set points Page 5

Changes from Straw Proposal (1 of 2) Clarified the methodology to set marginal clearing prices for regulation capacity and mileage rate based upon the expected total regulation costs and the historical accuracy of individual resources Modified calculation of the mileage multiplier to an hourly value using historical data from the prior week Changed the interval to calculate accuracy and mileage for individual resources from hourly to 15 minutes Clarified how the ISO will settle incremental RTPD mileage awards and the impacts of these awards on bid cost recovery revenue Page 6

Changes from Straw Proposal (2 of 2) Modified how the ISO will measure the minimum performance threshold to reflect a monthly 30 day average of 15 minute interval accuracy measurements Propose to publish a report on pay for performance data to assess mileage multiplier calculation, bid cap, and minimum performance threshold after obtaining one year of actual data Added a mileage bid cap of $50.00 Determined ramp period for regulation certification will be 10 minutes Page 7

Mileage Multiplier and Historical Performance Hourly Mileage Multiplier based upon prior week Resource specific historical accuracy –Calculated monthly based upon prior 30 day average 15 minute accuracy –Used for minimum performance threshold and to determine market awards Page 8

Determination of Market Clearing Prices A: Determine expected cost B: Divide expected cost by historical accuracy C: Select the highest mileage bid that cleared D: Capacity is highest expected cost less expected mileage Page 9 AB CD

Alignment with RT regulation 15 minute award interval Accuracy and mileage determine per 15 minute interval –Same measurement interval for DA and RT awards Mileage rate if both DA and RT regulation award –Weighted price paid for actual miles in 15 minute interval Mileage payments included in BCR revenue –Weighted split if DA and RT regulation award –No accuracy adjustment included Page 10

Market performance report 1 year after implementation Using actual mileage and accuracy data to evaluate: –Appropriateness of the minimum performance threshold level –Historical data used to calculate the mileage multiplier used to determine the expected cost of regulation –Level of the mileage bid cap given the change in resource participation under the new compensation mechanism –Other Determine if modifications are needed to refine PFP regulation design Page 11

Next Steps Page 12 Please submit comments to ItemDate Post Revised Straw ProposalJanuary 4, 2012 Stakeholder Conference CallJanuary 11, 2012 Stakeholder Comments DueJanuary 18, 2012 Post Draft Final ProposalFebruary 8, 2012 Stakeholder Conference CallFebruary 15, 2012 Stakeholder Comments DueFebruary 22, 2012 Board MeetingMarch 22, 2012