By Roy Baker District 4 Health Supervisor.  Examination to assure compliance with respirable dust controls in the Approved Ventilation Plan ◦ Within.

Slides:



Advertisements
Similar presentations
The Basics Equipment Maintenance and Safety
Advertisements

KBHome 60 Day Maintenance Visit KBHome. Faucet Aerator Cleaning or replacing the aerator. Cleaning or replacing the aerator. Twice a Year Twice a Year.
Engine Tune-Up By Jonathan Rollins.
Let’s watch a DVD… DVD Instructor Notes
CHAPTER 45 Engine Lubrication.
USER MAINTENANCE.
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
ADX 150 – Engine Repair ADX 170 – Climate Controls
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
2 Fire Fighter Qualifications and Safety Skill Drills.
Common Faults - Machinery Cover missing or not fitted correctly Action : replace or refit covers Nuts or bolts missing from covers Action : replace Seals.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Stanley DS11 Diamond Saw.
Installation. Indoor Unit Installation Typical Installation.
MSHA’s Final Respirable Dust Rules. Major Sections Modified Part 70 (Underground coal mines) Part 71 (Surface coal mines/facilities) Part 90 (Miners with.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
Oil Heat Nozzles.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Unit 5 Bench Testing, Maintenance, and Troubleshooting.
Bench Testing, Maintenance, and Troubleshooting.  Identify three primary steps in bench testing a helitorch.  Identify six considerations in maintaining.
Spray Finishing Operations/Spray Booth March 9, 2009.
Dust Division Pittsburgh Safety and Health Technology Center Mark Schultz Senior Mining Engineer.
FILTERING MDP. Safety and Safety Gear  When filtering from a fermentation vessel you should never use carbon dioxide to push the beer through the filter,
Installing & Maintaining Irrigation Systems Ms. Gripshover Landscaping Unit 15.
1. The 3M manufactures 2 types of Powered Air Purifying Respirator (PAPR) to be worn to provide respiratory protection for those staff members who have.
CARBURETED FUEL SYSTEM
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Mechanical for Oil Heat
The Airtex Educational Partnership (AEP) was started several years ago by Airtex Automotive Division as a way to merge corporate automotive expertise with.
Hydraulics For The Long Term
Accessories Planned Maintenance. Types l Humidifiers l Air Cleaners l Heat Recovery Ventilators l Condensate Pumps.
A/C testing and service. Before testing and service, technician must be certified by ASE, MACS, or IMACA.
Respirator Safety This Training Covers Respirator Inspection User Fit Checks Respirator Cleaning Respirator Storage.
Fire Pump Functions The main function of a fire pump is to increase the pressure of the water that flows through it. Inadequate or nonexistent municipal.
Plan 2 – Dead-end Seal Chamber Optional Jacket
MECH1200 SEALS, GASKETS & SEALANTS. MECH1200 WHAT CAUSES LEAKS Causes of leakage –Worn or damaged seals –Worn or damaged gaskets –Worn or bent parts or.
TEAM UP! FOR FAN AND PUMP SAVINGS It can be as easy as replacing an old drive belt.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Respiratory Safety Public Safety Murray State University.
Maintenance of Machine tools
Preventing Silicosis in the Mining Environment. 1.Prevention of Silicosis to Improve Mine Workers Health and Quality of Life. 2. Compliance with MSHA.
1 Skill Drill 2-7 Donning a Face Piece Step 1: Fully extend the straps on the face piece. Step 2: Place your chin in the chin pocket. 2 Step 3: Fit the.
Binks Spray Tips November 2008 Surface Preparation - General Anything you don’t want to see in the final finish must be removed from the surface Surface.
On-Shift Examination Scenario Continuous Miner Section What you will need: Pencil and paper to take notes or perform calculations Calculator to calculate.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
Firefighter III Module B Water Supply (4-19) (4-19)
Dust Control Training Program for Underground Personnel
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
Spray Booths Follow safe operating instructions. Spray-finishing operations  Organic materials  Inorganic materials  Dispersed form  Deposited to.
Respiratory Protection
Engine Performance BASIC MAINTENANCE AND LIGHT REPAIR.
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by Travis Benton United Pump and Controls, Inc.
Pre-Shift Examination Scenario Continuous Miner Section What you will need to complete this exercise: Pencil and paper to take notes or perform calculations.
Technician’s Guide & Workbook for Duct Diagnostics and Repair.
Temperature Test Allows monitoring of temperature changes.
Copyright © 2016 by The S.E.A. Group
F I L T R A T I O N SCHOONOVER, INC..
14 Refrigerant Recovery, Recycling, and Recharging.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Chemical Transfer.
CHAPTER 45 Engine Lubrication.
Welcome! Drafting 2323: Pipe Drafting
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Presentation transcript:

By Roy Baker District 4 Health Supervisor

 Examination to assure compliance with respirable dust controls in the Approved Ventilation Plan ◦ Within 1 hour of shift change if there is no break in production (Hot-Seating) ◦ Prior to resuming production if there is a break in production at shift change  Deficiencies corrected prior to production beginning or resuming 2

 Examination includes: ◦ Air quantities and velocities ◦ Water pressures & flow rate ◦ Excessive leakage in water delivery system ◦ Water spray number and orientation ◦ Section ventilation & control device placement ◦ Work practices in plan ◦ Any other dust suppression measures 3

◦ Certified person conducting the on-shift examination to assure compliance with the respirable dust control parameters was not certifying by initials, date, and time that the examination was made. 4

◦ Sprays used were not approved in the plan ◦ Water flow rate incorrect ◦ Pressure was not being checked on both sides of the Continuous Miner and multiple locations on Longwall ◦ Dirty sprays were producing an ineffective spray pattern

 Full Pitot Traverse checks of the scrubber were not being conducted and some folks did not know how to conduct the required checks or how to establish a centerline correlation factor (Average velocity divided by centerline reading) for use throughout the week for a comparison depending on your plan requirements.  Scrubber sprays were not being checked to make sure they were working and covering the entire area of the screen.  Different size screens were being used besides what the plan required. Examples- 20 mesh,30 mesh, or bottle brush type  Seals around screen doors and demister were missing or damaged.  The bottom of sumps were found clogged.  Deflector vents were damaged to keep from directing exhaust toward ribs and a few were found missing.

MSHA Approved Dust Hose

Check for and Fix Any Leaks Check for Hose Wear and Replace if Required Hose Clamps – Installed and Tight INSPECTION AND MAINTENANCE - DUST HOSE, FITTINGS AND CLAMPS

INSPECTION AND MAINTENANCE DUST BOXES AND FILTER ELEMENTS... INSPECTION AND MAINTENANCE DUST BOXES AND FILTER ELEMENTS... Door Latches If damaged replace with Fletcher OEM dust tank latch only.

Doors and Door Gaskets Doors and Door Gaskets Doors not warped or bent All gaskets installed, in good condition and clean. Each chamber must be separated. Check for air leaks and replace gasket if necessary. Use only OEM gaskets

Filter Elements Make sure filter sealing surface is clean If dust bypasses filter, this cavity must be cleaned out or system will not operate properly. Never attempt to clean filter elements. Remove and properly dispose of dirty element. Install new approved element when dust collection efficiency decreases to the point that drilling rate is reduced. Clean box area of dust before installing new clean filter or dust can contaminate clean side of system. Hand tighten wing nut as tight as possible Dust leakage around nut is possible if not tight

MAKE SURE HOSES ARE CONNECTED CORRECTLY AIRFLOW DIRECTION ARROWS PN: Cyclone Cap

Roy Baker District 4 Mt. Hope WV. PH#

DAVID STEFFEY CLR – DISTRICT 5 NORTON, VA LESSONS LEARNED DUST EMPHASIS TEAM INSPECTION FINDINGS WATER DELIVERY SYSTEMS

 Water delivery system problems found  Inadequate water pressure Undersized pump High resistance in pipe system  Inadequate water volume Too small diameter water line Poor water delivery to face equipment Hose size Piping on machine Wrong sprays

 Water related Dust Controls Specified in Ventilation Plan are Ambiguous  Type of water sprays cover wide range of options – can not be evaluated Specify BD-2, BD-3, BD-5 can be used Spray flow rates 0.42 gpm to 1.6 gpm Spray type 3 Spray XX or equivalent

Water sprays Required sprays not used Lower water flow rate Lower water pressure Sprays are not maintained – dirty, do not produce spray pattern

Quickly Recognizing Problems Can Maintain Nozzle Performance, Quality and Efficiency  Seven Reasons Why Nozzles Don’t Perform Properly Erosion and nozzle wear Wear of the nozzle orifice and internal flow passages As a result flow is usually increased, pressure may be decreased and the pattern may become irregular Nozzles should be checked with a pressure gage and flow meter – when flow rate is 15% above published value this nozzle should be changed Corrosion Nozzle surface breaks down due to chemical action of sprayed material or environment Nozzles that are corroded should be changed Certain materials used to produce nozzles are more durable than others Choose your nozzle based on in mine conditions High temperature – Not usually a factor in coal mining

Caking or bearding Build up of material on the orifice due to liquid evaporation Water quality can greatly affect this (hard water) Typically a problem with atomizing nozzles Caked nozzles should be replaced Damage Damage to the orifice can occur when improper cleaning tools are used Meaning – nails are not good for cleaning nozzles Clogging Material clogs the orifice and the spray pattern is not evenly distributed Good filtration systems can help avoid this Improper Assembly Some nozzles require careful reassembly after cleaning Simplicity of maintenance should be considered (the fewer the parts the better)

 SOURCE OF THE MINE WATER Public Water storage tank Surface water – pond/stream  FILTRATION TO MAINTAIN A CLEAN WATER SUPPLY At source On MMU Maintain filtration system Considerations when Ensuring Water Delivery System Meets Plan Requirements

Other Considerations  Number and Type of MMU’s you will use Continuous Miner Dust suppression sprays Scrubber Wethead Miner Longwall  Other Water Needs Belt transfer points Regulatory requirements for fire fighting

DAVID STEFFEY CLR – DISTRICT 5 NORTON, VA

By Brent Wolfe Health Specialist District 3

 Sampling Unit  Equipment (sampling units) not maintained as approved  Flow rates not maintained at 2.0 L.P.M.  Sampling head assemblies are not cleaned and inspected  Pre-sampling shift checks : o Black hose used o No voltage checks made o Pump and apparatus assembled prior to 3 hours before the start of the start of shift  Sampling Procedures  Respirable dust samples are not collected at required times (shifts/days) o Example : 14 days to take 5 valid samples with full production, 3 shifts a day.

 Sampling Procedures  Certified persons do not know the regulatory requirements for the proper collection of respirable dust samples o A Control Filter sent in as a Regular Sample o 1 Control Sample sent in for 5 separate respirable dust samples  Improper record keeping for length of shift  Maintaining sample in appropriate location:  Belt DA Sample found too far away  Operating sampling unit portal-to-portal  Full Shift Sampling

 Air at end of curtain does not match plan o Example: Lower air quantity due to curtain found 16” off the mine floor.  Air not balanced with scrubber quantity (blowing face) o Example: To much air quantity at end of line curtain (More than limits of Plan).

Scrubber quantity lower than plan quantity  Air quantity measurements performed incorrectly o Plugs in Pitot holes o Not testing all Pitot holes o Holes between scrubber screen sprays and screen

 Ductwork dirty/plugged  Screens not dried per Plan  Demisters found with 1 inch thick sediment on layer filaments  Sump pump not working

 Dust box door seals not maintained - Non- approved seals o Ex. weather stripping from home improvement store  Vacuum hoses do not match approval requirements and found leaking  “Clean“ side of collector contaminated  Dust box door latches not maintained  Vacuum setting does not meet approval plate

 Non-Approved Hoses being used ( electrical conduit)  Electrical tape covering up holes  Clean Side of system contaminated with white fine dust  Latches missing; Door hinges broke; Mine sealant used to seal door.  Vacuum pressures to low, Hoses not clamped onto barbed connector’s.

 Valves installed in the dust collection system.  Low pressure found when valve to dust collection box turned off.  Door Seals “pieced” together with and without approved seals.

 Water sprays  Required sprays not used (1MM sprays used instead of 3/32”)  Lower water pressure (dirty filters, inside of hoses collapsed).  Sprays not maintained—dirty, do not produce spray pattern.

 Mag Gauges not maintained  Holes on adapters of Mag Gauges plugged with dirt/sediment  Loose adapters on Mag Gauges  CMO’s do not know Plan requirements (Scrubber screen needs cleaned every 40 feet of advancement).