Tutorial 5: Two walls connected with strut and base slab Deep Excavation LLC DeepEX 2015 – Advanced course1.

Slides:



Advertisements
Similar presentations
(MICROSOFT EXCEL). Is a spreadsheet application designed to take advantage of the windows graphical interface MICROSOFT EXCEL.
Advertisements

Working with Profiles in IX1D v 3 – A Tutorial © 2006 Interpex Limited All rights reserved Version 1.0.
Chapter 9 Working with Tabs and Tables. Chapter Objectives Work with tabs Create and format a table Format text in a table Place graphics in a table.
Working with Tables for Page Design – Lesson 41 Working with Tables for Page Design Lesson 4.
Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 8: Add a.
KompoZer. This is what KompoZer will look like with a blank document open. As you can see, there are a lot of icons for beginning users. But don't be.
Introduction to Microsoft Excel 2010 Chapter Extension 3.
Select New Project from Project menu to create a new project File.
The line sketch with modified height for the plinth floor is displayed.
Tutorial 3: Slope stability and soil nailing walls
Session 25 – 26 DRILLED SHAFT And CAISSON FOUNDATION
Cross Section Introduction
Bank-Stability and Toe-Erosion Model Andrew Simon, Robert Thomas, Andrea Curini and Natasha Bankhead USDA-ARS National Sedimentation Laboratory, Oxford,
Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 1: Introduction.
BASIC TUTORIAL ON AUTODESK REVIT Created By MHS Architecture Portfolio.
STUDENT EXERCISE #2 Use the α-Method described in Section a and the Nordlund Method described in Section c to calculate the ultimate pile.
© by Pearson Education, Inc. All Rights Reserved.
Revit Structure 2015 October-2014Dr. Walid Al-Awad 1 Building Information Modelling.
Tutorial 4: Two walls connected with struts Deep Excavation LLC DeepEX 2015 – Advanced course1.
Session 17 – 18 PILE FOUNDATIONS
Direct Shear Test CEP 701 PG Lab.
Text Boxes and WordArt Guided Lesson.
Footings.
Tutorial 7: Two Walls: Backfill and Excavation Deep Excavation LLC DeepEX 2015 – Advanced course1.
Streamlined Process for Soil-Structure Interaction Analysis of Nuclear Facilities Utilizing GTSTRUDL and MTR/SASSI Wei Li, Michael Perez, Mansour Tabatabaie,
1 iSee Player Tutorial Using the Forest Biomass Accumulation Model as an Example ( Tutorial Developed by: (
Screens appear here to display the: Data Tables Plots Bibliographic Info Add New Data Form, Molecular Structure-Drawing Form ‘Tree’ for navigation between.
Advanced Forms Lesson 10.
How to create Log Plots If your plot has been created before accessing this module will take you straight to your picture. If this is your initial process,
1 Database – Kits Kits… Opens the Machinings library management dialog box.
Lesson No:9 MS-Word Tools, Mail Merge and working with Tables CHBT-01 Basic Micro process & Computer Operation.
An Introduction to Sazeh Negar 6.
Advanced Results Processing Workshop 8. Training Manual Advanced Results Processing August 26, 2005 Inventory # WS8-2 Workshop 8 - Goals In this.
Creating your own form from scratch.. To create a custom form, you can modify an existing form or design and create a form from scratch. In either case,
CIS 205—Web Design & Development Dreamweaver Chapter 5 Using HTML Tables to Lay Out a Page.
Steel Connections Program to calculate steel structures connections according to EC3 and DIN18800.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 8: Reports.
Tutorial 6: Bin type walls with tierod Deep Excavation LLC DeepEX 2015 – Advanced course 1.
GTSTRUDL The GTSTRUDL Base Plate Wizard A Module for the Modeling and Analysis of Base Plates Rob Abernathy CASE Center GTSUG June, 2008 Las Vegas, NV.
© 2008 The McGraw-Hill Companies, Inc. All rights reserved. WORD 2007 M I C R O S O F T ® THE PROFESSIONAL APPROACH S E R I E S Lesson 14 Tables.
Getting Started With AutoCAD ENGR 2 Week #1 Laboratory.
Chapters Project title : Hirbawi Center A building lies in the east side of Tulkarm, this building consists of five stories of ( m 2 ) A building lies.
Session 15 – 16 SHEET PILE STRUCTURES
1 Draw Mode. 2 Notable Points (RMB) End point: Snaps to the closest end point of the selected entity. Mid point: Snaps to the middle point of the selected.
0 Load Calculation Manual Output : 1. Screen Outputs (Results, Pareto Chart, Hourly Estimation) 2. Optional Outputs (*CLTD.txt, *TETD.txt) 3.
WS09-1 VND101, Workshop 09 MSC.visualNastran 4D Exercise Workbook Belted Cylinder.
© 2008 The McGraw-Hill Companies, Inc. All rights reserved. WORD 2007 M I C R O S O F T ® THE PROFESSIONAL APPROACH S E R I E S Lesson 15 Advanced Tables.
GTSTRUDL Using the GTSTRUDL Base Plate Wizard Example of Creating and Analyzing a Base Plate Rob Abernathy CASE Center GTSUG June, 2009 Atlanta, GA.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Version 1.0 3/23/2007 © 2007 ANSYS, Inc. All rights reserved. Inventory # W2-1 BladeModeler 11.0 ANSYS, Inc. Proprietary ANSYS BladeModeler 11.0.
Excel Screen Slide 1 Column Row Cell Formula bar Column heading Row heading Worksheet tab.
Working with Shapes Guided Lesson. Objective  In this lesson you will learn how to insert a shape and format it by changing its fill color, outline color,
December 2011 n 4ce Quick Start Guide Sections Profiles are generated in n 4ce as either Long or Cross Sections. Sections can be positioned in plan using.
Key Applications Module Lesson 14 — Working with Tables Computer Literacy BASICS.
Introduction to Drafting and Design In order to begin our drawing we have to set the drawing limits or the paper size.
PILE FOUNDATIONS UNIT IV.
MS WORD INFORMATION TECHNOLOGY MANAGEMENT SERVICE Training & Research Division.
LUKHDHIRJI ENGINEERING COLLEGE MORBI SUBJECT :- “BOX SHEAR TEST” 1.Mepani Kiran ( ) 2.Pavasiya Jaydeep ( ) 3.Pindoriya Jenti( )
Soil mechanics and foundation engineering-III (CE-434)
1. Explore Interactive GIS 2. Create Map Layouts 3. Reuse a Custom Map Layout 4. Create a Custom Map Template 5. Add a Report to a Layout 6. Add a Graph.
Direct Shear Test.
Microsoft Access 2007 – Level 2
An-Najah National University Faculty of Engineering
Building a User Interface with Forms
WORKSHOP 1 INTRODUCTION.
Learning Objectives • Dynamic Input Line tool. • Coordinate systems.
A Step by step procedure for Analysis, Design and Estimation of a project using Build-Master is shown here.
Graduation Project Bracing system for deep excavation.
Key Applications Module Lesson 14 — Working with Tables
Presentation transcript:

Tutorial 5: Two walls connected with strut and base slab Deep Excavation LLC DeepEX 2015 – Advanced course1

DeepEX is a software program for braced excavations in soils with 2D limit-equilibrium and non-linear analysis methods, and structural verification of all elements (with AISC, ASD, Eurocodes). It offers the ability to analyze walls with multiple braces (tiebacks) in multilayered soils. The non-linear analysis considers elastoplastic behavior for the whole soil-wall-support system. The program also offers the ability to perform traditional limit-equilibrium analyses. The graphical interface is completely interactive and the input is simplified to a great extend. The program utilizes archives of wall types, structural and soil materials, ground anchors etc. The analysis can be performed in either an utlimate state or at a service state (allowable design, LRFD, or Eurocode 7 design approach methods). The program offers the ability to automatically set all critical settings according to the desired design methodology. Corso Paratie, Milano 30 settembre 2009 INTRODUCTION DeepEX 2015 – Advanced course2

Program layout Wall selection Project tree view Design section list (right click) General input tabs File menu (click) Model stages (right click options similar to excel) Command prompt (enter coordinates) Press to perform calculations. Instruction box Model space (left or right click on any item) Mouse is over item Units DeepEX 2015 – Advanced course 3D Model (Frames) View and other

Enter basic project information 1. Select this button 2. Define the project name etc. 3. Press OK DeepEX 2015 – Advanced course

Move model elevations 1. Select this button 2. Set new reference elevation to 100 ft 3. Check All boreholes (this moves all soil layers) 4. Press OK

1. Add a 2 nd wall 2. Double click on right wall 3. Change dimensions 3.1 Change xwall= 60ft Depth L= 45ft

Define basic model limits (top, bottom, left, right) 1. Select this button 2. Set Top= 130ft Bottom= 40ft Left= -60ft Right= 120ft 3. Press OK DeepEX 2015 – Advanced course

Modify soil types (database of soils) 1. Select this button. Or Expand the Soils Tree and Double click on F Options: Right click or press Delete Note: In DeepEX you can use any soil type in more than one borehole. For example the F soil can be used in boring 1 or boring 2 etc. You can use any Boring on any design section. Thus changing any property of the F soil will affect all the excavation Design Sections where F is used! Boring with F soil

Soil type data form Available soil types Add new, copy, delete, paste soil Density Strength Short soil name, description and color. Soil type & initial clay behavior Test data for estimating soil properties DeepEX 2015 – Advanced course

Soil type continued Soil properties: General Soil name: F (this appears in the boring) Description: Detailed soil description. Soil type: Sand  t = 125 kcf : Total unit weight  dry = 120 kcf : Dry unit weight (above water table) c‘= 0 : Effective cohesion  ’= 30 degrees : Effective friction angle v= 0.35 Poisson’s ratio Kx = Horizontal permeability Kz = Vertical permeability Parameters only for clays Su = Undrained shear strength  cv= Constant volume shearing angle  peak= Peak shearing angle DeepEX 2015 – Advanced course

Soil properties (Resistance and Elastic) KoNC = At rest lateral earth pressure coefficient for normally consolidated state. Enter elasticity values as shown before. Click on > buttons for more options. DeepEX 2015 – Advanced course

Soil S1 Soil properties: Change S1 A. General Soil name: S1 (this appears in the boring) Description: Sand Detailed soil description. Soil type: Sand  t =125 pcf : Total unit weight  dry = 120 pcf: Dry unit c‘ 0: Effective cohesion  ’ = 36 degrees : Effective friction angle V = 0.35 Poisson’s ratio C. Elasto-plastic E = 500 ksf rEur = 3 D. Bond Ultimate bond = 30 psi Press OK

Edit Borings (soil layers) To edit the soil layers double click on the model boring. The borings can also be edited from: a) Edit Borings Button. Or from the: b)Tree View – Stratigraphy – boreholes Double click here (or right click) with the mouse. DeepEX 2015 – Advanced course

Enter Soil Layers To edit the soil layers click on the blue button and enter the top of layer elevation. For this example type 90 here: Then select soil type S1 here: DeepEX 2015 – Advanced course Press OK

DeepEX 2015 – Advanced course

Double click on wall DeepEX 2015 – Advanced course

2. Select edit section data, to change wall properties 1. Change wall depth to 45ft DeepEX 2015 – Advanced course Number of nodes controls the divisions along the wall in a limit- equilibrium analysis. (Suggested 200 min, or set so that small intervals (0.25 ft) are generated)

Change wall section AZ 19 sheet pile 1. Change wall type 2. Select AZ-19 section 3. Select A50 steel (fy= 50 ksi) 4. Select OK DeepEX 2015 – Advanced course

Wall using AZ-19 wall section Select OK DeepEX 2015 – Advanced course

Add a new stage (Model Tab) Or right click (to add a stage, similar to Excel) DeepEX 2015 – Advanced course

Stage 1 change center El. 90 Stage 1 DeepEX 2015 – Advanced course

Add Stage 2: Add a strut at El. +92 Right click and add stage 2 DeepEX 2015 – Advanced course

You can also drag the surface with your mouse

Select tool to add a strut Note: After selecting the “Draw ground anchor button” the program tells you to select/enter the 1 st tieback point at the wall (x z) DeepEX 2015 – Advanced course

Add tieback with mouse 1. Select 1 st point on left wall (we will modify the coordinates later 2. Select 2 nd point on right wall

Edit strut section Typing PP24x0.375 will generate a pipe 24” OD x 0.375” thick wall Typing PM600x12 will generate a pipe 600 mm OD x 12mm wall

Add 3 rd stage and excavate to El. +80

Changing the water table Double click or drag the water table Change the water elevations in the general tab Click on the water table button The drop down offers other possibilities for drawing user defined water profiles.

Add stage 4: Draw in a slab between the two walls

Drawn model with slab

Edit slab properties Create 3ft thick slab Elevation refers to slab center Specify ft/2 = El Change spacing to 1ft Edit slab section to make a 3ft slab Include slab weight in vertical stress Select “Use user defined unbraced lengths” and use 10ft

Edit slab section to 3ft Slab thickness d= 36inches Slab width b= 12” Change reinforcement bars to #9 Ctop and Cbot are clearances to center of bars

Completed model with 3ft slab Green points show that slab is supported at “rigid points” Slab is not really on ground. Slab weight is added to vertical soil stresses. NOTE: EXCAVATION IS NOT YET SEALED

Change water levels and seal excavation Change water elevations to El. +90 Go to analysis tab, and apply seal excavation Purple line shows that excavation is sealed (lined). Dashed water table inside excavation shows the water potential and that the excavation is dry within.

Reviewing vertical soil stresses and water pressures: Important that total vertical stress is greater than water pressures Must maintain positive vertical effective stress Program does not consider contribution from wall side resistance and dead weight.

Review forces on slab Double click on slab Water pressure at bottom of slab: 0.62 ksf (rounded) Used FS STR= 1.6 shows the safety factor used to determine the design capacities This was defined in Design tab