Calculate A Production Plan With The Inventory Chain Template © Dale R. Geiger 20111.

Slides:



Advertisements
Similar presentations
Verify Unit of Measure in a Multivariate Equation ©
Advertisements

Estimate Future Costs Given Planning Factors © Dale R. Geiger
CAPACITY LOAD OUTPUT.
Complete Steps 1-3 in Accounting Cycle © Dale R. Geiger
Calculate a Production Plan with the Inventory Chain Template ©
Calculate Probability of a Given Outcome © Dale R. Geiger
Calculate Point of Indifference Between Two Cost Scenarios
Determine The Purpose And Motivation For Managerial Costing © Dale R. Geiger, 2011 Used by Permission 1.
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
Calculate Cost of Goods Manufactured © Dale R. Geiger
Calculate Projected Costs With The Cumulative Average Learning Curve © Dale R. Geiger
Identifying Cost Relationships High-Low Method © Dale R. Geiger
Calculate Breakeven Point © Dale R. Geiger
Calculate Total Cost and Per-Unit Cost for a Given Production Volume ©1.
Calculate Schedule and Cost Variances with Earned Value Analysis © Dale R. Geiger
Chapter48 An introduction to management accounting.
DOM 301 : Operations Management Practice
Identify Sensitive Variables through What-if Scenarios ©
Identify Sensitive Variables © Dale R. Geiger
Calculate Total Cost And Per-Unit Cost © Dale R. Geiger
Calculate Net Present Value © Dale R. Geiger
Calculate Total Cost And Incremental Costs © Dale R. Geiger
Calculate Volume and Performance Variances ©1. What Does it Mean?? 37 Best in class or worst? Best in class or worst? 37 out of 100? or 37 out of 37?
Calculate Volume And Performance Variances © Dale R. Geiger
The Master Budget and Flexible Budgeting
Project Sales Or Production Levels Using The Rolling Average © Dale R. Geiger
Calculate Expected Values © Dale R. Geiger
Aggregate Planning and Resource Planning Chapters 13 and 14.
Define Governmental Operating Activities © Dale R. Geiger
1 The budgeting process The traditional goals of the planning and control process are: - to identify the economic goals and how to achieve them - to measure.
Calculate Financial Position © Dale R. Geiger
Cooking with Combinations Statistics: Chapter 4 Section 1.
Verify Unit Of Measure In A Multivariate Equation © Dale R. Geiger
The Envelope System © Dale R. Geiger Questions to Consider Does “the Government” overspend its budget? Who decides how much to spend? How do managers.
Explain Changes in Net Position © Dale R. Geiger
Calculate Present or Future Value of Cash Flows © Dale R. Geiger
Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Transaction Analysis © Dale R. Geiger Terminal Learning Objective Action: Demonstrate How Transactions Affect the Accounting Equation Condition:
Calculate Present or Future Value of Cash Flows ©
Complete All Steps In The Accounting Cycle © Dale R. Geiger
Allocate Single Cost Pool to Users © Dale R. Geiger
Calculate Economic Order Quantity © Dale R. Geiger
Aggregate Planning and Resource Planning Chapters 13 and 14.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Explain the Impact of Poor Cost Information © Dale R. Geiger
Demonstrate How Transactions Affect the Accounting Equation © Dale R. Geiger
Chapter 9 Introduction to a Standard Cost System.
Calculate Economic Order Quantity © What do you think? Corporal O’Reilly, the supply clerk, knows that it costs the Army money to generate a purchase.
Calculate Spending and Efficiency Variances ©1. Why So Much? ©2.
Part V: Plan, Monitor and Control Financial Operations
Calculate a Production Plan with the Inventory Chain Template
Verify Unit of Measure in a Multivariate Equation
Verify Unit of Measure in a Multivariate Equation
Calculate Break Even Point
Calculate Spending and Efficiency Variances
Calculate a Production Plan with the Inventory Chain Template
Calculate Spending and Efficiency Variances
Recommend Investment Course of Action Based on NPV Calculation
Calculate a Production Plan with the Inventory Chain Template
11.1 Backward Chain Template
Calculate Cost of Goods Manufactured
Calculate Economic Order Quantity
Process Activity Types
Identify Cost Assignment and Settlement
Calculate Breakeven Point in Units and Revenue Dollars
Calculate Expected Values of Alternative Courses of Action
Identifying Cost Relationships High-Low Method
Quantities in chemical reactions
Presentation transcript:

Calculate A Production Plan With The Inventory Chain Template © Dale R. Geiger 20111

What is a Forecast? plan A forecast is a plan for the future based on estimates, strategies and historical data standard Represents a standard for comparison to actual performance commitment Implies a commitment to an agreed-upon level of output at an agreed-upon cost Encourages “What-If?” scenarios May or may not be tied to the legal budget © Dale R. Geiger 20112

Terminal Learning Objective Task: Calculate A Production Plan With The Inventory Chain Template Condition: You are a cost advisor technician with access to all regulations/course handouts, and awareness of Operational Environment (OE)/Contemporary Operational Environment (COE) variables and actors Standard: with at least 80% accuracy: Identify and enter relevant scenario data into macro enabled templates to calculate Production Needs, then Plan Direct Labor, Overhead and Forecast Material Purchases © Dale R. Geiger 20113

Consider the Following Process Flow Building, manufacturing, and all other processes start with inputs and physically progress to outputs Purchase meat for freezer, move from freezer to refrigerator to defrost, move to grill, move to table © Dale R. Geiger 20114

Planning’s Key Difference: Backward Chaining outputsend state goals inputs Planning starts with outputs and end state goals and logically works backwards to determine needed inputs If you are planning a menu with a desired output of ten burgers you will have to work backwards through the process If there is no inventory in the refrigerator and freezer, you will need to purchase hamburger meat for ten burgers If you wish to maintain inventories in the refrigerator and freezer for future cookouts you will need to specify output and inventory end states in order to plan properly © Dale R. Geiger 20115

Input-Output Equation Input-Output Equation Beginning + Input – Output = End If you take more water out of the bucket than you put in, what happens to the level in the bucket? © Dale R. Geiger 20116

Using the Equation Given any three of the Variables, can Solve for the fourth Example: How much Fuel did my Car Use? Start with a Full Tank Drive 300 miles Re-Fill Tank, using 10 gallons Full Tank + 10 gallons – Output = Full Tank Full Tank + 10 gallons = Output + Full Tank © Dale R. Geiger 20117

The Input-Output Equation Inventory Beginning InputOutput Ending Beginning + Input – Output = Ending © Dale R. Geiger 20118

Material Requirements Planning © Dale R. Geiger Inventory Beginning InputOutput Ending Inventory Beginning InputOutput Ending Inventory Beginning InputOutput Ending

Check on Learning How does a forecast differ from The Budget? Where does the planning process begin? © Dale R. Geiger

Demonstration Problem Planning assumptions Output goal is 10 Planned ending grill inventory is 0 Planned ending refrigerator inventory is 35 Planned ending freezer inventory is 20 Known facts Actual beginning grill inventory is 0 Actual beginning refrigerator inventory is 10 Actual beginning freezer inventory is 30 How many burgers should you plan to purchase and put into the freezer? © Dale R. Geiger planned end states starting points planned action

Backward Chaining Demonstration Freezer Beg  Purchase End  To frig © Dale R. Geiger Refrigerator Beg Defrost End  To grill

Backward Chaining Demonstration FreezerGrill Beg  Purchase End  To frig Beg 0 Cook End 0 Beg 0 Cook End 0 10  To table © Dale R. Geiger

Backward Chaining Demonstration Grill Beg 0 Cook End 0 Beg 0 Cook End 0 10  To table © Dale R. Geiger Refrigerator Beg 10 Defrost End  To grill

Bill of Materials Of course, the real world gets more complicated Rather than eating plain hamburgers you might specify the following bill of materials: Buns Cheese Pickles, onion, lettuce, and tomatoes Mustard, ketchup, mayo How would this affect your planning? © Dale R. Geiger

S’mores After the cookout you plan to make s’mores on the grill The bill of materials for each s’more is: 1 marshmallow 2 graham crackers 4 chocolate squares The process flow is: Pantry  Assembly  Grill © Dale R. Geiger

S’mores Planned production is 30 s’mores Beginning state of Assembly and Grill is zero units Planned ending state of Assembly and Grill is zero units © Dale R. Geiger

S’mores © Dale R. Geiger Chocolate squares Grill Beg 30  Purchase End Beg 0 Cook End 0 Assembly Beg 0 Assemble End 0 Graham crackers Beg 6  Purchase End Marshmallows Beg 5  Purchase End Pantry

S’mores © Dale R. Geiger Chocolate squares Beg 30  Purchase End Graham crackers Beg 6  Purchase End Marshmallows Beg 5  Purchase End Pantry

S’mores © Dale R. Geiger Chocolate squares Grill Beg 30  Purchase End Beg 0 Cook End 0 30  To table Assembly 30  To grill Graham crackers Beg 6  Purchase End Pantry 1 per unit

S’mores © Dale R. Geiger Chocolate squares Grill Beg 30  Purchase End Beg 0 Cook End 0 30  To table Assembly 30  To grill Marshmallows Beg 5  Purchase End 12 Pantry 2 per unit

S’mores © Dale R. Geiger Grill Beg 0 Cook End 0 30  To table Assembly 30  To grill Graham crackers Beg 6  Purchase End Marshmallows Beg 5  Purchase End 12 Pantry 4 per unit

Real World Complexities These simple concepts are applied through materials requirement planning (MRP) systems in much more complex situations Consider the complexities of: Automobile manufacturing Computer assembly Making and launching a space shuttle Can you see applications for ARFORGEN? © Dale R. Geiger especially when you consider the lead times of purchasing and assembly!

But My Organization Doesn’t Have Inventory! What about staffing and training requirements? Ex. Air traffic controllers, Nuclear reactor operators Not having an adequate supply of trained workers can be costly Overtime, exhaustion, errors A “Just-in-Time” effort requires even more careful planning © Dale R. Geiger

Check on Learning How does the Bill of Materials affect the materials planning process? What are the non-manufacturing applications of Materials Resource Planning? © Dale R. Geiger

Planning’s Impact on Cost Plans have financial consequences There are costs of our burger production process Fixed costs are energy and labor in this example Variable costs are dependent on the number of burgers produced Flexible Forecasting Uses same assumptions for fixed and variable costs per unit, only changing (flexing) volume © Dale R. Geiger

Flexible Forecast Example Assumptions: Fixed Cost = $20 Variable Cost per Burger = $5 © Dale R. Geiger

Flexible Forecast Example Assumptions: Fixed Cost = $20 Variable Cost per Burger = $5 © Dale R. Geiger

Flexible Forecast Example Assumptions: Fixed Cost = $20 Variable Cost per Burger = $5 © Dale R. Geiger

Flexible Forecast Example Assumptions: Fixed Cost = $20 Variable Cost per Burger = $5 © Dale R. Geiger

Flexible Forecast Example with Revenue Assumptions: Price per Unit = $10 Fixed Cost = $20 Variable Cost per Unit = $5 © Dale R. Geiger

Flexible Forecast Example with Revenue Assumptions: Price per Unit = $10 Fixed Cost = $20 Variable Cost per Unit = $5 © Dale R. Geiger

Check on Learning How does total cost change as quantity produced increases? What is a flexible forecast? © Dale R. Geiger

Practical Exercise © Dale R. Geiger

Practical Exercise © Dale R. Geiger