NSF Baseline Review February 10-12, 2004 Optical Module Production Phil Robl Physical Sciences Laboratory.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

The world of micro electronics Introduction Microcontrollers Micro Applications Future education Practical demonstrations.
AMANDA Lessons Antarctic Muon And Neutrino Detector Array.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Computer Integrated Manufacturing CIM
Introducing Belliss USA Inc.
GoldenDOMs Status and analysis plan Shigeru Yoshida (for Hiroko M) Dept. of Physics, Chiba University.
Purpose: Integration of AGATA detectors in triple modules Acceptation tests of triplets (energy resolution, crosstalk,…) Complementing the scanning table.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 1 IceCube Digital Optical Module Production R. Nahnhauer DESY.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
April 4, 2007 Rolf Nahnhauer1 DESY-PROJECT IceCube Digital Optical Module Production.
IceCube 1400 m 2400 m AMANDA South Pole IceTop Skiway 80 Strings 4800 PMT Instrumented volume: 1 km3 (1 Gt) IceCube is designed to detect neutrinos of.
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer.
Energy management at FERMILAB: strategy on energy management, efficiency, sustainability Stephen Krstulovich, energy manager.
RF Cavity / Coupling Coil Module
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
IceCube System Testing
November 24, 2004 Rolf Nahnhauer1 PROJECT : IceCube Digital Optical Module Production at DESY Zeuthen.
From Research Prototype to Production
RICE-II Engineering & Deployment Kenneth Ratzlaff, John Ledford Instrumentation Design Lab The University of Kansas.
A km 3 Neutrino Telescope: IceCube at the South Pole Howard Matis - LBNL for the IceCube Collaboration.
Laguna Beach, CA March 30-April 1, 2003 PMT HV Base Board Development Nobuyoshi Kitamura SSEC / UW-Madison.
Chapter 11 Record-Keeping Procedures. Objective In this module, you will learn: u What kinds of records are needed in a HACCP system u When to record.
Astronomy & Astrophysics Advisory Committee (AAAC) May 11, 2006 Vladimir Papitashvili Antarctic Sciences Section Office of Polar Programs National Science.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
AMANDA and IceCube neutrino telescopes at the South Pole Per Olof Hulth Stockholm University.
Data-Measuring Equipment The Chair trains the following specialists: engineers “Information-measuring technical equipment and technologies” specialty;
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
CIPANP 2006K. Filimonov, UC Berkeley From AMANDA to IceCube: Neutrino Astronomy at the South Pole Kirill Filimonov University of California, Berkeley.
Why Neutrino ? High energy photons are absorbed beyond ~ 150Mpc   HE  LE  e - e + HE s are unique to probe HE processes in the vicinity of cosmic.
J. Vandenbroucke N. Bramall, M.D’Agostino, A. Morey, P. Sandstrom, M.Solarz, I.Taboada Calibration of the Standard Candle: How Standard Is It? IceCube.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
Jan 16, 2004Tom Gaisser 1.3 Cost & schedule review The IceTop component of IceCube Area--solid-angle ~ 1/3 km 2 sr (including angular dependence of EAS.
Science Advisory Committee March 30, 2006 Jim Yeck IceCube Project Director IceCube Construction Progress.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
David Seckel, IceTop Baseline Review, Madison, Dec. 4, 2003 IceTop Baseline Review Dec. 4, Madison WI.
STANDARD OPERATING PROCEDURES FOR BIOTECHNOLOGY
IceCube Dust Loggers Kurt Woschnagg, Ryan Bay Physics Department, UC Berkeley Instrumentation Session IceCube Collaboration Meeting Bartol, March 2004.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
What the system does as a whole? The system can monitor the product’s status such as the expiration date, used and unused products. The system can generate.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Module 12 - part 2Slide 1 of 23 WHO - EDM Basic Principles of GMP Documentation Part 2 Part One, 14.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Christos J. Giordamlis Managing Director ICT Sector is established ISO 9001 R&D Sector is established.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
PSL Metrology Pte Ltd – CSE Training Overview PSL Metrology Pte Ltd, confidential.
Prototyping of Complex Systems Some Experiences Gilson Bootstrapping Series November 8, 2011 Farshid Feyzi Physical Sciences Laboratory.
Project Lead The Way Presented by: Ryan Shoemaker and Joseph Heintzelman.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Status and Perspectives of the BAIKAL-GVD Project Zh.-A. Dzhilkibaev, INR (Moscow), for the Baikal Collaboration for the Baikal Collaboration September.
Status of Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Farshid Feyzi. Outline What we have learned and our present focus Small sample of projects Brief history of where we started and where we are now How.
Future high energy extensions of IceCube with new technologies: Radio and/or acoustical detectors Karle.
Bill Raynor Naval Research Lab
IceCube Construction Endgame
Chapter 11 Record-Keeping Procedures.
IceCube System Testing
Evaluation of Suppliers of Critical Consumables, Supplies and Services Section February 2016.
Factory Tour 2008.
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Tour of the Facility Clean Organized Facility And Latest Equipment
LaBour Pump Selma, Alabama “The Can Do Place” 11/19/2018.
Insert Product Photograph Here
Presentation transcript:

NSF Baseline Review February 10-12, 2004 Optical Module Production Phil Robl Physical Sciences Laboratory

2/10/04 NSF Baseline ReviewPhil Robl2 The Physical Sciences Laboratory, University of Wisconsin – Madison Engineering and Instrumentation for Research Engineering and technical staff of 27 Large machine shop – CNC and manual machines Electronics shop – broad array of test instruments Stockroom with large inventory Experienced purchasing staff Qualified suppliers and subcontractors 35 years experience, 6000 projects 4400 m 2 facility

2/10/04 NSF Baseline ReviewPhil Robl3 IceCube at PSL AMANDA hot water drill (three generations – 1992 to 1999) AMANDA Optical Module Production (1997 – 2000) Enhanced Hot Water Drill for IceCube –Hose reel and cable reel –Instrumented Drill Head –Mobile Drilling Structure Integration and assembly IceCube Digital Optical Modules –DOM Design – Flasher Board, Delay Board, PMT Collar –DOM assembly –DOM packaging, storage and shipping –Production room –Dark freezer lab

2/10/04 NSF Baseline ReviewPhil Robl4 3rd Generation AMANDA Drill Head

2/10/04 NSF Baseline ReviewPhil Robl5 A ntarctic M uon A nd N eutrino D etector A rray

2/10/04 NSF Baseline ReviewPhil Robl6 Digital optical module Gel curing AMANDA OM production

2/10/04 NSF Baseline ReviewPhil Robl7 Hose Reel for Enhanced Hot Water Drill

2/10/04 NSF Baseline ReviewPhil Robl8 Hose Reel for the Hot Water Drill -- finished at PSL

2/10/04 NSF Baseline ReviewPhil Robl9 Finished Hose Reel with Hose and Mobile Drilling Structures

2/10/04 NSF Baseline ReviewPhil Robl10 Hose Reel being assembled at the South Pole

2/10/04 NSF Baseline ReviewPhil Robl11 Outfitting of HPP MDS

2/10/04 NSF Baseline ReviewPhil Robl12 Interior of Rodriguez Well MDS

2/10/04 NSF Baseline ReviewPhil Robl13 AMANDA OM Production at UWPSL FY analog OMs FY analog and ALED OMs FY OMs: –201 ALEDs (198 8" PMTs and 3 10" PMTs) – 11 dAOMs ( 6 8" PMTs and 5 10" PMTs) – 40 DOMs (In collaboration with LBNL) – 20 dAOMs (poured for UC Irvine) – 28 test & development

2/10/04 NSF Baseline ReviewPhil Robl14 OM Production for FY00

2/10/04 NSF Baseline ReviewPhil Robl15 IceCube DOM Production Flowchart

2/10/04 NSF Baseline ReviewPhil Robl16 PMT Collar Installation Jig

2/10/04 NSF Baseline ReviewPhil Robl17 Gel Pouring Jig

2/10/04 NSF Baseline ReviewPhil Robl18 Assembled DOM

2/10/04 NSF Baseline ReviewPhil Robl19 Finished DOM Ready to Pack and Test

2/10/04 NSF Baseline ReviewPhil Robl20 DOM Production at PSL

2/10/04 NSF Baseline ReviewPhil Robl21 DOM Production Room Prefab Structure

2/10/04 NSF Baseline ReviewPhil Robl22 Dark Freezer Laboratory

2/10/04 NSF Baseline ReviewPhil Robl23 Dark Freezer Laboratory

2/10/04 NSF Baseline ReviewPhil Robl24 DFL Construction at PSL

2/10/04 NSF Baseline ReviewPhil Robl25 DFL Computer Room

2/10/04 NSF Baseline ReviewPhil Robl26 Quality Control of Production All procedures documented in detail All procedures coordinated with German and Swedish OM facilities All assembly technicians trained Log components in each unique DOM: –Benthossphere S/N –PMT S/N –PCB S/Ns (four boards) Log each assembly operation –Date and time –Room pressure, temperature, humidity –Deviations from normal procedure Record results of each test (computerized)