Safinah Ltd The resource to manage your coating risk – minimising your costs wherever you are www.safinah.co.uk European Coatings Conference Review of.

Slides:



Advertisements
Similar presentations
Offshore Technical Integrity Safety Critical Elements and Performance Standards Tony Vaclavicek.
Advertisements

Corrosion in ballast tanks Marine Coatings RINA Conference Feb 2010 Presented by: DR M Raouf Kattan - managing director
Ship Machinery and Equipment Maintenance
Cleaning up Marine Antifouling Thu 29 th April 2010 IMarEST, London Introduction and Challenges Dr Raouf Kattan Managing Director Safinah Ltd –
Marine Coatings All products supplied and technical advice or recommendations given are subject to our standard Conditions of Sale. Intershield ® 163 Inerta.
Energy Service Productivity Management ©2007 ESPM Energy Consultants, L.L.C. All Rights Reserved.
Optimising Site Investigations for Offshore Wind Farm Projects Mark Finch Geotechnical Engineering Manager Hydrosearch Associates, Aberdeen UK Offshore.
Crack Management – Part II Feedback From In-Service Inspections Based upon OTC “FPSO Fatigue Assessment: Feedback From In-Service Inspections” Clemens.
“Changing Industry Demands Redesign the OSV’s” 1 This paper was first presented at the “ 4 th International Conference on Technology and Operation of Offshore.
Maersk Contractors Petrobras Visit June Maersk Contractors Drilling Floating Production H 2 S Detection and Protection Liquefied Natural Gas (LNG)
FPSO Research Forum Forum Discussion OTRC, College Station USA April 2003.
Solar Hydrogen Energy Pilot Project for Libya Dr. Mansour Emtir LPI-Tripoli, Libya Berlin-28/03/2008.
Antifoulings – Concerns, penalties and remedies especially for the smaller fleet operator October Athens, Greece The third International Symposium.
Regulations in the North Sea Keith Mayo, Head of Offshore Decommissioning, DECC, UK Date 1/2 October 2009.
Helix Energy Solutions Group, Inc. (HLX) NYSE Recommendation: BUY Price (10/3/14): $21.55.
PART SIX Systems Model and Offshore Oil Offshore Oil: Decision to Recover The determination must be made whether cost of inputs and processing will be.
1 Shtokman – the most risky project in Arctica Nina Lesikhina.
Copyright © 2007 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Benefits of an Integrated Compliance.
Off-Grid Power Markets 26 May The off-grid market consists of some of the largest industrial enterprises on the planet, operating in remote.
Unit 4: Primary Resources Energy from the Oceans.
OUTLOOK FOR FPSO ORDERS OVER THE NEXT FIVE YEARS Presentation by Jim McCaul at the Global FPSO Forum 25 September 2014.
WORLD ENERGY INVESTMENT OUTLOOK
Sheltered Housing – Fit for the future? Eileen Patterson, FOLD HA Fiona Boyle, Research consultant.
Solutions for Flaring & Venting CNG Marine Transportation
The Marine Sector in Singapore. Shipping in Singapore Strategic network of shipping lanes 1/7 of the world’s container transhipment 200 shipping lines.
A Connected World in transformation NICE – DATACENTRES 2012 May 23 rd 2012 Paul-François CATTIER Global Data Centre Solution VP.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Current and Emerging Trends in the Gulf of Mexico Andrew Slaughter, Vice-President, Energy Insight 2013 UK Trade and Investment Breakfast at Offshore Technology.
Round table: COVENANT OF MAYORS (Energy policy of EU) Varna – 10th -12th September 2014.
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
F India’s Energy Challenge June 28 & 29, 2006, Hilton Americas, Houston Panel Session 3B LNG/GTL Amos Avidan.
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.
GWS SMS INTRODUCTION EMS Manual. 3. PROCEDURES FOR BILGE AND WASTE OIL MANAGEMENT OF MACHINERY SPACES As far as possible, the OWS must not be used.
Client Name is.... Dr Lynda Speed
Responsible Transport Practices Presented by: Mathetha Mokonyama Venue: Sandton Convention Centre Date: 18 May 2010.
Flagships of the Future SUSTAINABILITY CHALLENGES AND OPPORTUNITIES IN A HETEROGENEOUS GLOBAL FLEET.
By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.
Tanker performance and Annex VI compliance Manager Research and Projects St. Petersburg 25 November 2008 Vostoc Capital’s The.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
Towards an modern and integrated offshore electricity infrastucture.
Whitelaw & Pearson The Costs of Increasing a Basic Shrimp Vessel from 65 to 85 FEET A Case Study.
AAPA 2011 Pre-CAPSA’11 Study Tour – Bitumen Imports Bitumen Imports - an Australian perspective.
FPSO Experience Database JIP FPSO Research Forum 16 October 2002 Santiago de Compostela, Spain Robert SpongABS Consulting Presented by:
Sustainable Energy Systems The EU “WETO” World Energy, Technology and climate policy Outlook 2030 Domenico Rossetti di Valdalbero European Commission,
Solution To Wasted Gas: Flaring And Associated Gas In Nigeria
The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.
PHASE 7 FACILITIES ENGINEERING
EMIDOI - Electronic Marketplace for Information on Decommissioning of Offshore Installations eContent Concertation Meeting 11 october Frankfurt.
Setting the Scene Presentation at Intsok International Oil and Gas Business Days 2007 by Jim McCaul International Maritime Associates Washington-Houston.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
Bengt Lie Hansen Senior Vice President, Hydro Oil & Energy The Giant Ormen Lange Field Development Hydro’s model for arctic offshore projects World Gas.
Lesson Two Ship Design. Contents Design essentials Design Procedure advances factors concepts requirements Detailed operation.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
LESSONS LEARNED FROM RECENT PIPELINE INCIDENTS FLORIDA NATURAL GAS ASSOCIATION (FNGA) OPERATING & MARKETING CONFERENCE ROD WALKER PRINCIPAL CONSULTANT.
Offshore Research AS 1 Offshore Markets Offshore Research AS 2 Business concept Data from several reliable sources are processed, interpreted.
World Offshore Maintenance, Modifications & Operations Market Forecast World Offshore Maintenance, Modifications & Operations Market Forecast.
Financial Elements 1. Firm’s Main Objective is Value Creation for Shareholders and Other Stakeholders.
IMPROVED SEABED ANCHORING TECHNOLOGY Innovation Opportunity Identified at PROTTEC Retreat 26/28 October 2010 Jonathan Williams, Marine South East.
© 2016 Global Market Insights. All Rights Reserved Mooring System Market Growth Trend & Forecast by Mooring System Market.
Safinah Ltd Independent coating and corrosion prevention consultants Minimising risk from coatings or Paint misbehaving.
The Briggs Group.
Uniper Energy Services
Fonterra Supply Chain Now and in the future 8th August 2016
Teknologi Dan Rekayasa
INSTRUCTOR © 2017, John R. Fanchi
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
The LNG role to improve SoS in Europe
Emergency Response on FPSO
Presentation transcript:

Safinah Ltd The resource to manage your coating risk – minimising your costs wherever you are European Coatings Conference Review of the FPSO Market

Oil forever? “ The Stone Age did not end for lack of stone, and the Oil Age will end long before the world runs out of oil.” - Sheikh Zaki Yamani, a Saudi Arabian who served as his country's oil minister three decades ago.

A bit of history Huntingdon Beach California 1948 $126 for a plot of land free with an encyclopaedia set

Lake Maracaibo Venezuela 1960’s Caspian sea 100 miles offshore

Finally offshore Louisiana 1947 first system out of sight of land Kerr McGee

Offshore systems Civil Engineers Naval Architects Engineering Co.

FPSO Initially for deep water harsh environments Not suitable for main GOM – shallow water However –Low time to build or convert and reduced costs –Result in use in shallow water also as cost effective

FPSO Floating Production Storage Offloading First FPSO “Shell Castelon” built in 1977 in Spain Not to be confused with FSO

Market in Service by number

On order by number

Order time line No. of FPSO

Where are they being built *Includes full and modules

Projects planned Mar 2008 – 86 Mar 2011 – 124 Mar 2013 – 154

Fleet age profile

Next 5 years Likely to be sustained at Mar 2008 levels for next 5 years. –World GDP –Demand for Oil declines in developed countries e.g.US Car fuel consumptions targets –Shale oils and other sources –Oil price high at present –Rising costs/delays/capacity

New build issues Available hulls for conversion as opposed to new build Local content requirements Price/Finance Schedule Capacity Bigger vessels and deeper water

Capacity increasing Demand is on the increase with Europe mainly going for new builds and or re- deployment (80:20) – high fatigue demand Rest of the world relying on conversions, then new builds and the redeployment (50:40:10)

New challenges Development in subsea tie ups Price of oil EOR systems improved Larger fields ~ larger units Smaller fields ~ tie back Pipeline capability/technology. Temperatures and chemical make up AIM – Asset Integrity Management Life Extension

AIM and Life Extension The big challenge together with Life Extension programmes –1 FPSO – 10% of total workforce man-hours on fighting corrosion Looking to add up to years on design life Want to maintain – spend on coatings Permanent means of access Anodes

Coating issues New build specification Maintenance specification Repair specification Harsh environments –Africa - high corrosion - low fatigue –N.Sea - high fatigue – low corrosion –Edges

Coating management Need to engineer solutions –Performance specifications –Processes and procedures –Data recording and mapping –Assessment of coating life –Benchmark testing

Coating system needs Life expectancy – 25 years Through life maintenance Conservative at New Build (yards) Owners pay the price.. CAPEX vs OPEX

Key attributes New build Match the process Match the location/timing Shop primer weathering/welding Min number of coats Compliance/Norsok etc. Low Al content Age onset embrittlement Edges M&R Ease of M or R Process compliant Alternative technologies Harsh environments Time frames Environmental control

Anti Fouling To coat or not to coat –Biocide technology –Biocide free technology –Abrasion/impact –Ice Load on mooring systems can add huge costs. New solutions?

Other areas Cargo tanks –High temperatures –Sulphur content Ballast tanks –Critical –Higher temps –Reverse impact

Other areas Decks/Turrets –Restricted ventilation –Complex structures –Poor coating system solutions in service

Coating demand Based on a generic scheme Based on a generic FPSO Serves as an indicator not an absolute

Vessel areas Vessel dwt - 110,000 Length- 240m Breadth- 40m Depth- 23m Topside weight t

Typical areas Area nameArea size sqm UW hull7000 UW hull sides5000 Boottop3000 Topsides3500 Decks10000 Superstructure3500 Cargo tanks (total)60000 Cargo tanks (min)17000 Ballast tanks Slop tanks and reserves3200 FW tanks800 Engine room11000 Void spaces2000 Topside structural steel36000 Topside piping9000 Total * Topside equip Vendor coated Vague Specs.

Challenges Focus on M&R solutions Focus on benchmark testing Focus on survey/data collection (all in one service) Focus on complimentary technologies Demand will increase as current NB specs are simply not good enough.

Thank you Any questions?

Safinah Ltd Independent coating and corrosion prevention consultants