1 CDBG and Environmental Review For Grant Administrators.

Slides:



Advertisements
Similar presentations
The Texas Department of Housing and Community Affairs HOME Program Environmental Review Procedures OCC – Chapter 6.
Advertisements

The Texas Department of Housing and Community Affairs HOME Program Environmental Review Procedures HBA – Chapter 6.
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
The Lifecycle of Grants: Environmental Review November 7, 2012.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
NEPA Environmental Procedure Pam Truitt, Grants Management Consultant  September 4, 2014.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
 WELCOME  Welcome to the home page for the Louisiana Mapping Project (LaMP). The LaMP effort is being undertaken by Department of Homeland Security’s.
HUD Environmental Review Requirements November 30,2010.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
2009 CDBG/CHIP Recipients’ Workshop Welcome to the COMPLIANCE SESSION ENVIRONMENTAL REQUIREMENTS Afternoon session will cover new CHIP FEDERAL LABOR STANDARDS.
2011 CDBG Recipients’ Workshop COMPLIANCE 9:30EnvironmentalRick 10:30BREAK 10:45Wage Rate ProvisionsMary Alice 11:00Uniform Acquisition Robert 11:15Conflict.
Presented to: Association of California Airports By: Peter F. Ciesla, Environmental Protection Specialist Date: September 21, 2006 Federal Aviation Administration.
Presented to: Hershey Aviation Conference By: Ed Gabsewics, Charlie Campbell & Suki Gill Date: March 3, 2010 Federal Aviation Administration Environmental.
NHPA, Section 106, and NEPA Highlights and Misconceptions.
Office of Business Development Training
The National Environmental Policy Act (NEPA)
Module 15 Environmental Considerations Civil Works Orientation Course - FY 11.
Negotiating the NEPA Maze: It Really Is Rocket Science Start.
Connecticut Department of Transportation Bureau of Policy & Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Sacred Sites. Documentation Documentation: Forest Supervisor or Ranger District Offices may document Sacred site (s) information in a variety of ways.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Page CDBG Recipients' Workshop Community Finance Division NEPA Environmental Procedures.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
3 CDBG Disaster Recovery Program Information Workshop Monday, February 1, 2010.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Completing the NEPA Process for CatEx Projects: Part 3 to CE Closeout.
Environmental Review Process for Responsible Entities 24 CFR Part 58.
Mitigation in the Section 106 Process Dave Berwick Army Program Manager Advisory Council on Historic Preservation.
1 Environmental Planning and Historic Preservation (EHP) Compliance (p ) EHP Compliance.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
Environmental Troubleshooting State Community Development Block Grant Rhode Island December 2012.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
NEPA Environmental Procedure Pam Truitt, Grants Specialist  September 10, 2015.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Environmental Review Process for Responsible Entities 24 CFR Part 58 NEIGHBORHOOD STABILIZATION PROGRAM.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Slide 1April 8, 2015, Financial Assistance Council Meeting.
CIVIL RIGHTS IMPACT ANALYSIS Animal and Plant Health Inspection Service Civil Rights Enforcement and Compliance.
By Rachel Coleman.  “ The head of any federal agency having direct or indirect jurisdiction over a proposed federal or federally assisted undertaking.
1 CDBG and Environmental Review For Local Officials.
Streamlining NEPA for Reusable Launch Vehicles Federal Aviation Administration Associate Administrator for Commercial Space Transportation October 2004.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
Proposition 1 Workshop: the Grant Application Process July 2015.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Historic Preservation Memoranda of Agreement. What is an MOA? As part of the Section 106 review process, it is an agreement among an agency official,
CDBG Compliance Lite Michael Casper and Pam Truitt December 2, 2015.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
Rulemaking by APHIS. What is a rule and when must APHIS conduct rulemaking? Under U.S. law, a rule is any requirement of general applicability and future.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
3 CDBG Disaster Recovery Waterway Debris Program Wednesday, January 13, 2010.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
FCC’s NEPA Process Overview of NEPA Overview of NEPA Overview of FCC’s NEPA rules and procedures Overview of FCC’s NEPA rules and procedures Nuts and bolts.
National Treasures: Brownfields and the National Historic Preservation Act Brownfields 2006 Boston, MA.
ACA Conference - September 2017
Michigan Dept. of Environmental Quality Water Resources Division
HUD SMAC Conference November 7, 2017
National Environmental Policy Act (NEPA)
Environmental Planning in the Army Corps of Engineers
Cultural Resources Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Environmental Requirements and planning grants
The National Environmental Policy Act (NEPA)
NEPA Assignment Program Overview
Presentation transcript:

1 CDBG and Environmental Review For Grant Administrators

2 CDBG and Environmental Review If you want to successfully participate in the CDBG program, then Compliance with Environmental Review Requirements is the key to success!

3 Why Environmental Review? Protect health and safety, avoid or mitigate impacts that may harm our clients, Avoid or mitigate any harm to the surrounding environment and project site. Avoid litigation that could stop project on environmental grounds Avoid monitoring findings and/or loss of HUD financial assistance to your project REQUIRED – by Federal Law & Regulation under the National Environmental Policy Act of 1969 (NEPA) and NEPA related laws

4 Statutory & Regulatory Structure National Environmental Policy Act (NEPA) and implementing regulations of the Council on Environmental Quality (40 CFR Parts ). HUD Regulations (24 CFR Part 58). NEPA-Related Laws and Authorities (24 CFR 58.5).

5 What is NEPA? Ensures that environmental information is available to public BEFORE decisions are made and BEFORE actions are taken Requires systematic, interdisciplinary approach Helps public officials make decisions with an understanding of environmental consequences

6 NEPA-Related Laws/Authorities National Historic Preservation Act (1966) Floodplain Management & Wetlands Protection: Executive Orders (1977) Coastal Zone Management Act of 1972 Safe Drinking Water Act (1974) Endangered Species Act (1973) Wild & Scenic Rivers Act (1968)

7 NEPA-Related Laws/Authorities Clean Air Act (1970) Farmland Protection Policy Act (1981) HUD Environmental Criteria & Standards Noise Abatement and Control Near Explosives or Flammable Sites Near Airport Runway Protection Zones Near Toxic Hazards Environmental Justice E.O. (1994) Noise Control Act (1972)

8 Environmental Review Regulations 24 CFR Part 58 HUD’s regulation allows local units of government to perform NEPA responsibilities that would otherwise apply to HUD. Regulation titled “Environmental Review Procedures for Entities Assuming HUD Environmental Responsibilities”

9 Certifying Officer As part of CDBG grant agreement, the Chief Elected Official of the jurisdiction assumes responsibility for environmental review and must sign the Request for Release of Funds /Certification (RROF/C) and findings. CEO accepts the jurisdiction of the Federal Courts for the responsible entity in environmental matters for this certification.

10 Choice Limiting Actions! Cannot commit HUD and non-HUD funds to a proposed project prior to release of funds authorization Must oversee actions of sub-recipient Choice-limiting actions will reduce or eliminate your opportunity to choose alternatives Examples: property acquisition, leasing, demolition, rehabilitation, construction, and site improvements (including site clearance)

11 Choice Limiting Actions! Limitation on Activities Do not take ANY action until the environmental review compliance is achieved. Option agreements are allowable.

12 Importance of Early Start Begin environmental review process as soon as possible. Typical times required to complete review range from 1 to 120 days. Allow time for periods of public comment on environmental notices, including Finding of No Significant Impact (FONSI) and the Notice of Intent to Request for Release of Funds (NOI-RROF).

13 Steps in the Environmental Review Process Designate Environmental Review Officer. Create the Environmental Review Record. Develop Project Description. Determine the Level of Environmental Review Required. Notify State/ Federal Agencies for Comment. Publish Required Notices According to Level of Review.

14 Submit RROF and Certification to the State. Obtain Letter “Removing Environmental Conditions” from State. Proceed with Project. Maintain Documentation of Compliance in the Environmental Review Record (ERR). Steps in the Environmental Review Process, cont.

State Requirements/Process Insert example here or incorporate into bullets on slides containing federal info

16 Designate Environmental Review Officer Manages entire environmental review process and serves as point of contact for public inquiries regarding the environmental review. If paid from CDBG, must follow procurement standards. The Certifying Officer is the Chief Elected Official and assumes responsibility by signing off on the environmental review.

17 What is the scope? What Activities will be included? What is the location? ­ Get Maps  Planning Area Map  Wetlands Map  Floodplain Map  USDA-SCS Soil Survey Map & Report  Farmland Conservation Map  Historical Districts Map - GIS Identify the Project

18 Local grantees must group together and evaluate, as a single project, all individual activities that are related either geographically or functionally, or are logical parts of a composite of contemplated actions. In projects with multiple activities, the Environmental Review must be completed utilizing the highest level of review relative to the activities included in the project. Identify the Project Concept of Aggregation

19 Environmental Review Record Written record of review Must be available for public inspection Must contain the following: ­ description of project and each activity ­ maps ­ photographs ­ site plans ­ correspondence ­ studies

20 Environmental Review Record ­ public notices ­ written determinations or findings as evidence of review,decision making and action ­ RROF/Certification, Release of Funds ­ copies of comments and RE’s responses. DO NOT APPROACH ARBITRARILY ­ Be thorough ­ Be responsible ­ Be thoughtful

21 Levels of Environmental Review Four levels of review: ­ 24 CFR Part 58.34(a) Exempt ­ 24 CFR Part Categorically Excluded  Categorical exclusions SUBJECT to laws and authorities at 24 CFR Part 58.5  Categorical exclusions NOT subject to laws and authorities at 24 CFR Part 58.5 ­ 24 CFR Part Environmental Assessment ­ 24 CFR Part Environmental Impact Statement

22 Activities which are deemed not to affect the human and /or physical environment (i.e. environmental studies, planning, or administrative activities) No publication requirements Document finding in the environmental review record and proceed with project Exempt Activities

23 Activities excluded from NEPA requirements but may be subject to other Federal laws 2 Classes ­5­58.35(a) – activities SUBJECT TO other federal laws or authorities (CEST) ­5­58.35(b) – activities NOT SUBJECT TO other federal laws or authorities (CENST) Categorically Excluded

24 Environmental Assessment is required if project activities are not determined to be Exempt or Categorically Excluded. EA is required in extraordinary circumstances. Most CDBG funded activities require an Environmental Assessment. Environmental Assessment

25 An Environmental Impact Statement (EIS) is required when the RE determines that the project will have a potentially significant impact on the physical/human environment. This determination often results from the scoping process and environmental responses collected from the applicable contacting agencies as well as interested and affected parties. Environmental Impact Statement

26 If activity is determined exempt, no further review is required. Complete the “Finding of Exemption” form including all activities determined “exempt” from environmental review process and submit to State. The Certifying Officer must sign the determination. Process for Exempt Activities

27 Complete Statutory Checklist, including a detailed project description. If activities occur in floodplain or wetlands, conduct 8-step decision making process. Submit Section 106 Project Information form and submit to SHPO Certifying Officer Publish NOI/RROF and respond to public comments. Submit to State CDBG staff for Release of Funds. Process for Categorically Excluded Subject to (CEST)

28 Complete Statutory Checklist, including a detailed project description. Certifying Officer must sign off on the determination. Submit to State CDBG staff for Release of Funds. Process for Categorically Excluded Not Subject To (CENST)

29 Consult with the SHPO/THPO to complete the Section 106 process. For projects in floodplains or wetlands, conduct 8-step process. Publish notices. Consider and respond to comments. Comply with other laws and authorities. Complete Environmental Assessment documenting the level of review and submit to State CDBG Environmental Review Officer for review. Process for Environmental Assessment

30 Publish Combined Notice (FONSI- NOI/RROF) and allow 15 day comment period. Send copies of FONSI to agencies required by your state CDBG staff. Submit public notice, affidavit of publication and Request for Release of Funds and Certification (RROF/C) to state CDBG staff. Process for Environmental Assessment

Allow for 15 day (at least) time for objecting begins upon when the State CDBG agency receives the recipient’s NOI/RROF/C. The State CDBG agency may release funds via the “Authority to Use Grant Funds” (form HUD ) or comparable letter. 31

32 In the event the environmental assessment reveals that an EIS may be required, contact your state CDBG staff to discuss possible means of mitigation and/or project modifications. Process for Environmental Impact Statement (EIS)

33 Section 106 of the National Historical Preservation Act Start the Section 106 process as early as is feasible Submit Section 106 Project Information Form and all applicable supporting documentation to SHPO/THPO SHPO will recommend if Cultural Resource Assessment or Memorandum of Agreement (MOA) or other method to mitigate adverse consequences is required Section 106 Process

34 1.Determine if project area is located in a floodplain or wetland 2.Publish “early” notice of proposal to allow public to consider and comment on action (15 day comment period) 3.Evaluate practicable alternatives to locating project in a floodplain or wetland 4.Identify potential direct and indirect impacts associated with project occupancy and modification of floodplain or wetland Floodplains and HUD “8 Step” Process

35 5.Design or modify actions to minimize adverse impacts and preserve floodplain 6.Reevaluate whether proposed action is practicable/feasible in light of flood hazards and costs of minimization 7.Publish final notice of decision, identify why there is “ no practicable alternative” and mitigation measures adopted (can be combined with FONSI notice.) 8.Obtain approval (receive RROF/C) and implement action with mitigation HUD 8-Step Process, cont.

36 Important Tips Change of scope in project might change review required. DON’T SPEND A DIME – until your ER is complete and you have received Release of Funds from your state agency. Even $.01 of CDBG money commits entire project to regulations When in doubt – contact your state CDBG staff!

37 Environmental Review Mini-Quiz Questions List the 4 levels of environmental review that may apply to a project. How many times must environmental notices be published for the following: (a) Environmental Assessments; (b) Exempt Activities; (c) Categorical Exclusions subject to NEPA related laws and authorities (d) Categorical Exclusions not subject to related laws and authorities (e) Finding of No Significant Impact

38 Environmental Review Mini-Quiz Questions For each of the following activities, indicate the appropriate level of review: ­ Environmental studies & administrative costs ­ Removal of barriers that restrict access/mobility for handicapped persons ­ Construction of wastewater treatment plant ­ Replacing of existing deteriorated sanitary sewer lines with new lines in the same right of way. The new lines are the same diameter as the previous lines. List the _(#)__ federal and state agencies that must be notified for environmental comment on all assessed activities. (state specific)

39 Handouts/Attachments Environmental Review Process Charts Sample Notice of Intent to Request Release of Funds NOI/RROF) Combined Notice of Finding of No Significant Impact and Notice of Intent to Request Release of Funds

Handouts/Attachments Request for Release of Funds and Certification (OMB No , HUD Form ) Sample: Notice for Public Review of a Proposal to Support Activity in the (100-Year Floodplain or Wetland) Environmental Review Record