Operations Scheduling
Advertisements

Operations Scheduling
Chapter 17 Scheduling.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 16 Scheduling.
Operations Scheduling
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Short-Term Scheduling
Operations Management
Inputs and Outputs to Aggregate Production Planning
Scheduling Operations Management - 5 th Edition Chapter 16 Roberta Russell & Bernard W. Taylor, III.
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Scheduling.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
Scheduling – Day 2. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material.
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16: Learning Objectives
JIT and Lean Operations
Operations Scheduling. Scheduling in a Process-Focused Environment.
Industrial Systems Engineering Dept. İzmir University of Economics
Chapter 16 Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1. Facility size 2. Equipment procurement Long-term
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 13 Scheduling To Accompany.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Operations Management Operations Scheduling
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Scheduling Seminar exercises Process and Production Management.
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
Activity Scheduling and Control
Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Chapter 16: Learning Objectives Instructor Slides You should be able to: 1.Explain what scheduling involves and the importance of good scheduling 2.Describe.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
Chapter 15 Scheduling McGraw-Hill/Irwin
Inputs and Outputs to Aggregate Production Planning
Chap 11 Learning Objectives
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Production and Operations Management
Scheduling Seminar exercises
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

Scheduling

Learning Objectives Explain what scheduling involves and the importance of good scheduling. Discuss scheduling needs in high-volume and intermediate-volume systems. Discuss scheduling needs in job shops. Use and interpret Gantt charts, and use the assignment method for loading. Discuss and give examples of commonly used priority rules. Describe some of the unique problems encountered in service systems, and describe some of the approaches used for scheduling service systems.

Last stage of planning before production occurs Scheduling Specifies when labor, equipment, facilities are needed to produce a product or provide a service Last stage of planning before production occurs

Batch Production Process Industry Mass Production Project Scheduled Operations Process Industry Linear programming EOQ with non-instantaneous replenishment Mass Production Assembly line balancing Project Project -scheduling techniques (PERT, CPM) Batch Production Aggregate planning Master scheduling Material requirements planning (MRP) Capacity requirements planning (CRP)

Objectives in Scheduling Meet customer due dates Minimize job lateness Minimize response time Minimize completion time Minimize time in the system Minimize overtime Maximize machine or labor utilization Minimize idle time Minimize work-in-process inventory There is no single scheduling rule that optimizes all of these performance criteria. We consider the trade-offs.

Scheduling Low-Volume Systems Loading - assignment of jobs to process centers Sequencing - determining the order in which jobs will be processed Job-shop scheduling Scheduling for low-volume systems with many variations in requirements

Assignment of jobs to process centers Loading Assignment of jobs to process centers Perform work with most efficient resources Use assignment method of linear programming to determine allocation

Loading Infinite loading – jobs are assigned to work centers without regard for the capacity of the work center. Finite loading – jobs are assigned to work centers taking into account the work center capacity and job processing times Vertical loading / Horizontal loading Forward scheduling – scheduling ahead from some point in time. Backward scheduling – scheduling by working backwards in time from the due date(s). Schedule chart – a form of Gantt chart that shows the orders or jobs in progress and whether they are on schedule.

Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with special equipment, on a specialized job. Priority rules: Simple heuristics used to select the order in which jobs will be processed. Job time: Time needed for setup and processing of a job.

If no order specified use first-come first-served (FCFS) Priority Rules FCFS - first come, first served SPT - shortest processing time EDD - earliest due date CR - critical ratio S/O - slack per operation Rush - emergency If no order specified use first-come first-served (FCFS)

Performance Measures of Priorities Meeting due dates of customers or downstream operations. Minimizing the flow time (the time a job spends in the process). Minimizing work-in-process inventory. Minimizing idle time of machines or workers. 9

Assumptions of Priority Rules The setup of jobs is known Setup time is independent pf processing sequence Setup time is deterministic There will be no interruptions in processing such as: Machine breakdowns Accidents Worker illness

Two Work Center Sequencing Johnson’s Rule: technique for minimizing completion time for a group of jobs to be processed on two machines or at two work centers. Minimizes total idle time Several conditions must be satisfied

Johnson’s Rule Conditions Job time must be known and constant Job times must be independent of sequence Jobs must follow same two-step sequence Job priorities cannot be used All units must be completed at the first work center before moving to second

Johnson’s Rule Optimum Sequence List the jobs and their times at each work center Select the job with the shortest time Eliminate the job from further consideration Repeat steps 2 and 3 until all jobs have been scheduled

Sequencing Jobs Through Two Serial Process Johnson’s Rule List time required to process each job at each machine. Set up a one-dimensional matrix to represent desired sequence with # of slots equal to # of jobs. Select smallest processing time at either machine. If that time is on machine 1, put the job as near to beginning of sequence as possible. If smallest time occurs on machine 2, put the job as near to the end of the sequence as possible. Remove job from list. Repeat steps 2-4 until all slots in matrix are filled and all jobs are sequenced.

Work package Gantt Chart Input/Output Control Monitoring Work package Shop paperwork that travels with a job Gantt Chart Shows both planned and completed activities against a time scale Input/Output Control Monitors the input and output from each work center

Scheduling Difficulties Variability in Setup times Processing times Interruptions Changes in the set of jobs No method for identifying optimal schedule Scheduling is not an exact science Ongoing task for a manager

Minimizing Scheduling Difficulties Set realistic due dates Focus on bottleneck operations Consider lot splitting of large jobs

Scheduling Services Considerations Scheduling services different from manufacturing Inability to store or inventory services Random nature of customer requests for service Point of customer contact Back-office operations Front-office operations

Controls customer arrivals for service Reservation systems Scheduling Services Appointment systems Controls customer arrivals for service Reservation systems Estimates demand for service Scheduling the workforce Manages capacity for service Scheduling multiple resources Coordinates use of more than one resource

The goal is to maximize the revenue generated by the fixed capacity Yield Management Yield Management – the application of pricing strategies to allocate capacity among various categories of demand. The goal is to maximize the revenue generated by the fixed capacity Fixed capacity Hotel, motel rooms Airline seats Unsold rooms or seats cannot be carried over

Hospitals, police/fire departments, restaurants, supermarkets Cyclical Scheduling Hospitals, police/fire departments, restaurants, supermarkets Rotating schedules Set a scheduling horizon Identify the work pattern Develop a basic employee schedule Assign employees to the schedule

Labor is very flexible resource Employee Scheduling Because: Labor is very flexible resource Scheduling workforce is complicated, repetitive task Heuristics are commonly used There is a lot if industry specific software available.

Service Operation Problems Cannot store or inventory services Customer service requests are random Scheduling service involves Customers Workforce Equipment