Space Reallocation Update October, 2007. Summary “Almost” on time “Almost” on time Definitely under budget Definitely under budget Thanks to all for their.

Slides:



Advertisements
Similar presentations
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Advertisements

St. Andrews School A tour of St. Andrews. This is the Nursery This is the Nursery and it is behind Walmsley House. Children start in Nursery at 3 and.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Short-Term Alternatives for City Offices. Background and History Citys current lease for City Marketplace offices ends October 31, 2014 For 22,221 square.
Space: the Final Frontier How do Astronauts Savy and Sharon spend most of their time….
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Warm Springs Community Park 1 Administrative Building 3 School of Engineering (EAST) 2 Library and Student Service Center (WEST) 1. Administrative Building.
Church Renovation/ Expansion Proposals Willowdale.
Community Update James Simons School – October 2,
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
School of Management Opening Faculty Meeting August 25, 2005 Welcome to Alger Hall.
Recycle North Building Renovation and Design Senior Capstone Design Project Civil and Environmental Engineering Scott Hamshaw Presenting.
Summer IT Project Update Tech Talk September 11, 2007.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
University 101 Dr. Carol Wolf - Professor Cynthia Fox - Peer Advisor.
1 A Descriptive Study of Informal Learning Spaces in the College of Business Administration, Northern Arizona University, Fall 2006 James V. Pinto Professor.
An Information Commons for Graduate Social Science Students Digital Social Science Center: an Information Commons for Graduate Social Science Students.
Scenes from Parsons Hall Renovation
The West London Free School Palingswick House Update.
Hawthorne Hall – LEVEL 1 EXISTING. PROPOSED Hawthorne Hall – LEVEL 1.
Housing Options for Engineering Students. State of the art facilities State of the art facilities LEED (Leadership in Energy and Environmental Design)
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Multi-Purpose.
Network Managers Forum 10/07/14. Overview of the Team.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
ADDITION & REMODEL Eugene Field Elementary School.
Schematic design presentation School of Business South Hall Renovation.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
Micro and Nano Characterization Facility Girish Kunte October 28 th 2014.
SCHEV Space Utilization Study: The Data Collection Process Chuck DeHart, Assistant Director Institutional Research James Madison University May 2006.
Welcome to Meet the Teacher Night! There will be an informational video that will begin at 6:00. While we wait for it to begin, please browse the “Who.
POV Renovations November 14,2014. Repairing the East Wall.
NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.
North Augusta High School Design Development Presentation.
2 nd phase I.Classrooms, toilets, dinning hall, computer rooms and library for the primary students II.Expansion of the high school library and relocate.
Olson Hall Classroom Renovations Rooms 101, 105, 118, 125, 141, 163, 227.
Park Side Elementary West Side Elementary Marshall Middle School Marshall High School Proposed Security/Safety Improvements.
Research Experience Program (REP) Fall 2007 Psychology 100 Ψ.
Orientation - students IT Department. Agenda – IT services Help Desk office Computers (PC labs) Print services Wi-Fi network UNYP IT accounts.
Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010.
Click here for the LIVE WEBCAM
Facilities Services Department Meeting September 2016.
Mrs. Dodge’s 6th Grade Class Room 16 August 25, 2016
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
Principles of Arts, Audio-Visual Technology, and Communications
Main entrance To the hall.
35,000 sq ft / Three Stories Feasibility study to determine what is possible, cost, prelim designs Identification of under utilized spaces, areas for opportunity:
Columbus State Community College
HP Printer Support Number. Support for HP Computer Support for Update your Printer Drivers 24/7 Support Services Support for Diagnosis & Fixing.
Library Remodel Update
Mission Hall Updates Ask & Learn Christine Shaff UCSF Real Estate
Computer Science in the Early Years
WELCOME TO IT CONFERENCE ROOM
New York City Master Plan Update
Located on the first floor of Nitschke Hall Room 1010
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
ULM Library Virtual Tour.
B904 Status Report by Fred B.
2007 Bond Issue Capital Improvement Program
TITLE - TITLE - TITLE Subtitle – Subtitle - Subtitle
KOMPLEX Investors Report – Q
Space Sciences & Engineering
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
The Riggins Report Classroom News for the week of August 13-17, 2018
North Augusta High School – Phase 2A and 2B
2011 Exhibition of School Planning and Architecture
October 2014 Star Data Prior to the C.A.F.E. Reading Initiative these were the results attained.
1.
Presentation transcript:

Space Reallocation Update October, 2007

Summary “Almost” on time “Almost” on time Definitely under budget Definitely under budget Thanks to all for their patience and good humour Thanks to all for their patience and good humour Lots of “small things” yet to do Lots of “small things” yet to do

Ferrier Building Everyone has moved in Everyone has moved in Still need signs Still need signs Some final details still to complete Some final details still to complete Access to Ferrier opposite James Building (to 1 st floor), from Dr. Penfield (to 3 rd floor), and from 3 rd floor of Arts (to 3 rd floor) Access to Ferrier opposite James Building (to 1 st floor), from Dr. Penfield (to 3 rd floor), and from 3 rd floor of Arts (to 3 rd floor)

Arts Computer Lab in May

Arts Computer Lab in September

The Art Computer Lab Help Desk

Department of History Workspace (May)

Department of History Workspace in September

The Beaverbrook Conference Room

The Arts Lounge (Ferrier 2 nd floor)

The Courtyard Construction should start very soon Construction should start very soon Noisy work to be done ONLY early in the morning Noisy work to be done ONLY early in the morning

Courtyard looking east

Courtyard looking west

Down the Slope

Arts West: DLLF

“Ready to Roll” The Computer Classroom: Leacock 212 New lighting is operational New lighting is operational Computers are now installed Computers are now installed Most software is installed Most software is installed The pedagogical options are unparalleled The pedagogical options are unparalleled To learn more and to be given a demonstration of our state-of-the-art classroom, contact Mary MacKinnon To learn more and to be given a demonstration of our state-of-the-art classroom, contact Mary MacKinnon

Leacock 212: The Computer Classroom (prior to the installation of the computers)

What’s Next ? How can we best integrate numerous projects in Peterson Hall? (washrooms, CFI projects, general repairs to offices, ventilation, and more) How can we best integrate numerous projects in Peterson Hall? (washrooms, CFI projects, general repairs to offices, ventilation, and more) How can we make the best use of our new assets? (especially the computer classroom and breakout rooms in Leacock) How can we make the best use of our new assets? (especially the computer classroom and breakout rooms in Leacock) Installation of the computers at the Stand-up computer stations in the Leacock corridor Installation of the computers at the Stand-up computer stations in the Leacock corridor Installation of the printers in Leacock by Snax Installation of the printers in Leacock by Snax