Introducing LEP3 zero M. Koratzinos TLEP3 day, 9 January2013.

Slides:



Advertisements
Similar presentations
Beam-Beam Effects for FCC-ee at Different Energies: at Different Energies: Crab Waist vs. Head-on Dmitry Shatilov BINP, Novosibirsk FCC-ee/TLEP physics.
Advertisements

Eric Prebys, FNAL.  So far, we’ve talked about nice, periodic lattice, but that may not be all that useful in the real world. In particular, we generally.
Manchester University and the Cockcroft Institute Roger Barlow Technologies manchester.ac.uk Accelerators for ADSRs An account of the requirements.
Monochromatization for Higgs production A.Faus-Golfe IFIC - LAL March1FCC Week 2015.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
Beam Dynamics Tutorial, L. Rivkin, EPFL & PSI, Prague, September 2014 Synchrotron radiation in LHC: spectrum and dynamics The Large Hadron Collider (LHC)
Beam-Beam Optimization for Fcc-ee at High Energies (120, 175 GeV) at High Energies (120, 175 GeV) Dmitry Shatilov BINP, Novosibirsk 11 December 2014, CERN.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
Transverse polarization: do we need wigglers? M. Koratzinos With valuable input from Alain Blondel TLEP ACC meeting no. 4, 24/3/2014.
MEIC Electron Cooling Simulation He Zhang 03/18/2014, EIC 14 Newport News, VA.
Scaling of High-Energy e+e- Ring Colliders K. Yokoya Accelerator Seminar, KEK 2012/3/15 Accelerator Seminar Yokoya 1.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
LHC-CC10, 4th LHC Crab Cavity Workshop Summary Session 5: Crab Cavity Beam Studies P. Collier.
Eric Prebys, FNAL.  In our previous discussion, we implicitly assumed that the distribution of particles in phase space followed the ellipse defined.
Max Cornacchia, Paul Emma Stanford Linear Accelerator Center Max Cornacchia, Paul Emma Stanford Linear Accelerator Center  Proposed by M. Cornacchia (Nov.
June 15, 2002David Finley to Aspen PAC Slide 1 Report on 132 nsec Operation Report to the Fermilab.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
M. Koratzinos, HKUST Jockey Club Institute of Advanced Study, January 2016 Challenges of modern e+e- colliders Michael Koratzinos, University of.
Calibration of energies at the photon collider Valery Telnov Budker INP, Novosibirsk TILC09, Tsukuba April 18, 2009.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Principle of Wire Compensation Theory and Simulations Simulations and Experiments The Tevatron operates with 36 proton bunches and 36 anti-proton bunches.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
Lecture 4 Longitudinal Dynamics I Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
Transverse polarization for energy calibration at Z-peak M. Koratzinos With valuable input from Alain Blondel ICFA HF2014, Sunday, 12/10/2014.
Problems of charge compensation in a ring e+e- higgs factory Valery Telnov Budker INP, Novosibirsk 5 rd TLEP3 workshop, FNAL, July 25, 2013.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
Choice of circumference, minimum & maximum energy, number of collision points, and target luminosity M. Koratzinos ICFA HF2014, Thursday, 9/10/2014.
Muon Collider Physics Workshop FNAL November 10-12, 2009 Muon Collider Lattice Design FERMI NATIONAL ACCELERATOR LABORATORY US DEPARTMENT OF ENERGY f Y.
Note presentation: Performance limitations of circular colliders: head-on collisions M. Koratzinos TLEP ACC meeting no. 8, 25/8/2014.
News from the interaction region study Bernhard Holzer, Anton Bogomyagkov, Bastian Harer, Rogelio Tomas Garcia, Roman Martin, Luis Eduardo Medina Presented.
Input to the accelerator discussion:
The Interaction Region
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
Lecture 2 Live Feed – CERN Control Centre
Why are particle accelerators so inefficient?
Luminosity Optimization for FCC-ee: recent results
Top-Up Injection for PEP-II and Applications to a Higgs Factory
Synchrotron Ring Schematic
Beam beam simulations with disruption (work in progress...)
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
Beam-Beam Interaction in Linac-Ring Colliders
Electron Rings Eduard Pozdeyev.
Parameter Optimization in Higgs Factories Beam intensity, beam-beam parameters, by*, bunch length, number of bunches, bunch charge and emittance.
Overall Considerations, Main Challenges and Goals
Beam-Beam Effects in High-Energy Colliders:
SuperB IRC Meeting Frascati, Nov. 13th 2007
Polarized Positrons in JLEIC
Sawtooth effect in CEPC PDR/APDR
JLEIC Reaching 140 GeV CM Energy: Concept and Luminosity Estimate
MEIC New Baseline: Luminosity Performance and Upgrade Path
HE-JLEIC: Boosting Luminosity at High Energy
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Performance and Accelerator R&D
MEIC Alternative Design Part V
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
MEIC Alternative Design Part III
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Updated MEIC Ion Beam Formation Scheme
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Introducing LEP3 zero M. Koratzinos TLEP3 day, 9 January2013

Contents What is the ultimate luminosity that a circular collider (running at the ZH threshold) can reach? Is there a way to go beyond this luminosity?

Background K. Yokoya has shown the following plot (using V. Telnov’s formulae) You are here Due to a strange coincidence, the luminosity of circular and linear machines per IP at 240GeV E CM are the same! …but what is the real limit on the luminosity of circular machines?

Luminosity limits What would be the ultimate limit of luminosity for LEP3 and TLEP? This is easy to calculate since we already face a series of “hard” limits: – Limit on the total power dissipated – Beam-beam limit (beamstrahlung limit is a “softer” limit under this definition since it affects the lifetime and could be mitigated in principle by flatter beams, higher acceptance and fast duty cycle) I will not concentrate on beamstrahlung here

Total power limit We have limited the total power dissipated in the ring to a “reasonable” 100MW (50MW per beam). The formula of the total power loss, in convenient units, is: This translates to

Luminosity and beam-beam Head-on collisions: Luminosity is given by And the beam-beam parameter is Therefore

Maximum luminosity So the maximum theoretical luminosity is Max. of 0.1 For LEP3 this is =6cm -1 (0.6/0.1cm -1 ). For TLEP =0.75/0.1cm -1.Difficult to go beyond that. Total power limit Beam-beam limit Physical constants

Max. luminosity; notes I assume that we can reach the beam-beam limit. Beyond that: – Squeezing further in y is very challenging and does not help too much since it reduces the hourglass factor – Smaller emittances do not help If σ z stays constant, a bigger machine gains linearly with the bending radius In principle, TLEP would give 3 times the luminosity of LEP3 Luminosity can be improved by reducing σ z coupled to higher β* (→higher RF frequency? – very challenging)

The numbers For head-on collisions and with vertical β* of 1mm, the maximum achievable luminosities are: LEP3 (current design): 1.1×10 34 cm -1 s -1 LEP3 (ρ = 3.1km) : 1.3×10 34 cm -1 s -1 TLEP (ρ = 9km, E CM 240GeV) : 4.8×10 34 cm -1 s -1

Can we do better? (I am not talking about improvements of 20% here…) With head-on collisions, very little margin If we move to a crab-waist scheme, we can improve on the apparent σ z, but the beamstrahlung limit gets worse [beamstrahlung is proportional to 1/(σ x σ z )], so this does not appear to be a good option There remain more exotic schemes: Charge compensation! (suggested by V. Telnov one evening in Protvino…)

Charge compensation The idea is simple: counteract the electric field of the incoming beam, and the beam-beam limit and beamstrahlung limit is not there any more! This is not as easy at it sounds, as the effect of the incoming beam is a non-linear lens diverging in both planes and difficult to simulate Many schemes have been proposed and tried over the years: – Electron beam compensation [indirect] on an (anti)proton beam (TEL, Fermilab) – Four-beam accelerators (DCI, Orsay, 1971) – Other schemes with electric wires next to the beam, multipoles, etc., to produce the same non-linear lens effect… It is fair to say that none of these schemes has had spectacular success, but CC remains an active field of study

Four-beam compensation DCI was not a spectacular success (no discernible gain seen), but 40 years have passed since then. (“small initial bunch displacement errors lead to charge separation” and “a minute deviation from neutrality is amplified as the like-charge beams repel each other”) – Beam instrumentation is much better nowadays – The higher beam energy might improve things by faster damping The increase in costs for a four-beam solution is substantial… …but it merits a closer look

From LEP3/TLEP… HHHHHH LEP3 e+e+ e-e-

To LEP3 zero… HHHHHH LEP3 zero e+e+ e-e- e-e- e+e+

Artist’s impression of LEP3zero Accelerator ring magnets main ring magnets Thermal power management Vacuum management Clockwise e+ anticlockwise e- Clockwise e- anticlockwise e+ Vacuum chamber

Next steps Listen to Valery’s talk! Four-beam Monte-Carlo has been developed in the nineties by B. Podobedov and R.H. Siemann – could be resurrected

End

ADDITIONAL SLIDES

Tevatron electron lens TEL Improvement in proton lifetime of a factor 2 at high intensities