How to build a bridge!.

Slides:



Advertisements
Similar presentations
How to build a bridge.
Advertisements

Wooden Bridge Construction
GATHER THE FOLLOWING SUPPLIES:
UNDERNEATH DECK TRUSS. THE NEXT 6 SLIDES ARE EXAMPLES OF ROADBEDS FOR EACH TYPE OF TRUSS BRIDGE.
CeAnn Chalker Boomilever B & C – CeAnn Chalker
The 15th Annual Strongsville Truss Structure Competition
Summit Tech. Ed. Dune Buggy Mrs. Greissel
TODAY ADD LEGO rubric to end of your lab write-up for LEGO NXT
Cantilever Tower Project
Building Model Planes from Plans and Materials
Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University.
Bridge Building Notes Physics.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
The 13 th Annual Strongsville Truss Structure Competition indianalandmarks.org.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
Manila folder bridges.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Balsa Glider Construction
Balsa Glider Construction
Spaghetti Bridges The Pasta Sensations! Take a look at some designs…….
The Waddell A-Truss Bridge
Elevated Bridge.
Bridge Project Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials.
BRIDGE BUILDING.
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
Design Technology We all need Design technology as a part of life, its all about making things to help make life easier. In the next couple of weeks you.
MESA DAY BRIDGES. MESA BRIDGES Forces at Work Forces in a Bridge Building Better Bridges Rules Testing Procedures Materials Suppliers.
The Construction of Vertical Evolution Nigel Howe.
Design and Construction of a Spaghetti Bridge Michael Karweit Department of Chemical Engineering Johns Hopkins University.
PASTA TOWERS. GOAL—Build the most efficient tower.
Joints for Bridge Building. To build a bridge you must join many separate pieces. The stronger the joint, the stronger the bridge. We are going to view.
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3- Develop Solutions Unit 4- Implement A Solution Unit 5- Test and Evaluate.
Bridges Introduction to design.
Structural Engineering
The 16 th Annual Strongsville Truss Structure Competition indianalandmarks.org.
By Dane Wrye Ben Ghusn Stem Lab.
Helicopters SOSI 2012 Matt Chalker
Bridge Building We all have to start somewhere!. A few bridge-building suggestions  Pay attention to the rubric  Get the right materials  Don’t wait.
This is a self-propelled hovercraft, designed to use only one motor which will both lift the vehicle and propel it forward. The hovercraft works by creating.
Bridge Building Design Challenge
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
WOOD TOWER DESIGNS Objective: Students will be able to construct a tower out of wood in order to investigate the physics of structures.
Square Plant Stand. TOOL: Radial Arm Saw NEXT STEP: Surface Planer RESULTS: Rough size pieces for 4 Legs. 33” long PROJECT Square Plant Stand PART Legs.
Joining methods, including PVA adhesive, spray adhesive, solvent cement, hot melt glue (glue gun), epoxy resin, glue sticks, single and double-sided adhesive.
Bridge Specifications 10” Span 2 ¼ “ Outside width 2” Inside width 1” on each end must rest on the test supports 1” square opening in the center of the.
The problem is to design, construct and test the most efficient bridge within the specifications. Back to start of slide show.
REMINDER TURN IN THE TRUSS VIEW DRAWING TO THE WIRE BASKET ON THE TEACHERS DESK. WARNING DO NOT THROW THE DRAWING AWAY. THE DRAWING IS A SUMMATIVE GRADE.
Engineering Structures
Balsa Bridge Construction
The Waddell A-Truss Bridge
BRIDGE BUILDING ASSIGNMENT
Structures.
There are 2 classification of wood joints:
BRIDGE BUILDING ASSIGNMENT
Stick Together & Civil Structures
Balsa Glider Construction
Bridge Construction.
Bridge Project: Team Truss-Arch
Features of Structures
Bridge Construction This is the week 5 PowerPoint presentation.
Bridge Report Team Total Domination. Bridge Report Team Total Domination.
Loading Sand (cont.) Using Sand Hopper:
Constructing Your Bridge
Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials. Bridge Project.
Balsa Glider Construction
Rocket Stability Building a Test Rocket LabRat Scientific © 2018.
Mystery Architecture Robert C Fisler Elemtary Science Olympiad All Grades Event March 16th, 2019.
Balsa Glider Construction
Bridge Building We all have to start somewhere!.
Clay Canteen Project.
Presentation transcript:

How to build a bridge!

The Romans frequently built bridges with several small arches on top of one another. This slideshow contains tips, hints and several interesting bridge designs.

Tools and Equipment Not all of this is necessary, but all of it is very helpful. “One only needs two tools in life: WD-40 to make things go, and duct tape to make them stop.” -G. Weilacher

Use the glue you are given! Most glue is stronger than the wood itself As long as you use glue for what is was designed it might not really matter

CA Glue (aka superglue) – High School Use Dries quickly Very strong Comes off your fingers naturally within two weeks Must use in a ventilated area Excellent for gluing two sides together!

Wood Glue – Middle School Use Good brand of wood glue Three types available Clamp for ½ hour Water clean up Excellent for laminating beams together

Tools All of these tools are recommended but be careful as they are sharp and can injury you if used improperly. Scissors, ruler, square, level, and sharp blades

More tools Binder clips make excellent clamps (and are cheap) You need a sanding block and plenty of sandpaper.

Even more tools… Files will help you to shape the wood. Pins are available at hobby stores. You must have many. A 3/32” square file is particularly helpful in making notched joints.

This is a ceiling tile that has been glued to a thin piece of wood. The wood keeps it level and prevents pins from pushing through. A ceiling tile works very well to build on. It provides a level surface that you can pin into. Alternatively, you can use several sheets of cardboard stacked together.

How To Build Your Bridge

Planning The success of your bridge is roughly 50% design and 50% construction! A full scale template is highly suggested. Use a ruler and make your plan full scale and symmetric Glue sticks together to make an actual-size ruler – two thick, three thick, etc.

Tape your full scale plans to the board and pin a piece of wax paper on top. Plan templates are available from me! The wax paper prevents the glue from ruining your plans.

Use your balsa sticks wisely as you can only use the materials you are given. Glued joints will be stronger if you pre-sand all of the wood. Choose the best pieces of wood for the vertical and horizontal major components. Darker wood tends to be brittle but stronger.

Construction Take care to make good joints. When you are done, gently sand it. Extra glue adds weight, but not strength. Make sure to follow the gluing directions! Take your time! CA glue is a solvent for itself. That means if the glue has cured, don’t add more or it will dissolve itself.

Make the beams first. Each beam is clamped with binder clips Alternate the clips so that the beam does not warp Sand each beam until it is flat after it dries

Make each side one at a time The aluminum pins are available at any hardware store Don’t pin through the wood!

Complete each side and then remove it from the wax paper Leave the pins in place for the second side to insure that they are identical

Put the sides together and cross brace them Sand the entire bridge! Insert gussets where needed Note that this design has an undertruss which is not allowed in this year’s competition!

Baking Your Bridge! You can loose A LOT of water mass by baking your bridge! Low setting for about 15 minutes Seal in a plastic bag after baking Bake at your own risk!

Bending Wood To bend wood, soften it first over boiling water. Steam softens wood. Bend, pin in place and let it dry. After dry, glue it Be very careful not to burn yourself or your teammates! Never pin through the wood!

Truss Designs Howe Truss Warren Truss Pratt Truss K Truss

Types of Joints Gussets improve a joint End joint (weak) Lap Joint (best) Notched Joint (better)

Loading your bridge You have 5 minutes to place your bridge on the load frame and position it with the loading bucket. You have 20 minutes to load your bridge to failure.

Good Luck! Bridges are rated on efficiency. Your bridge needs to be light and strong! Awards are given for the top 3 teams in both divisions. Judge’s Choice award will be given at the discretion of the judges. The high school winner may receive a $1000 scholarship if they choose to enroll at UMKC in the School of Computing and Engineering!