Storm Water Regulation: What’s Next? Presented to: September 30, 2014.

Slides:



Advertisements
Similar presentations
Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
Advertisements

Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
Key Requirements of the Construction General Permit
Storm Water Blue Ribbon Panel Recommendations to the California State Water Resources Control Board The Feasibility of Numeric Effluent Limits Applicable.
Virginia Department of Conservation and Recreation Adopting a Local Program in Accordance with the Revised Stormwater Regulations Appomattox County February.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
Proposed Effluent Guidelines For the Concentrated Aquatic Animal Production Point Source Category by Janet Goodwin.
Effective October 1, 2011 New Connecticut General Permit for the Discharge of Stormwater Associated with Industrial Activity October 5, 2010 Connecticut.
1 Effluent Guidelines for Construction Greg Davis USEPA
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
June 19, 2014 CONTROL OF TRASH ENTERING WATERWAYS IN CALIFORNIA DRAFT WATER RESOURCES CONTROL BOARD POLICY.
STATUS OF CALIFORNIA NPDES PERMIT. TIMELINES September 2010-Draft permit available for public comment October 19 TH, 2010-Public hearing on Vector Control.
GAR General Storm Water Permit for Industrial Activity
2014 Industrial General Permit Summary of Key Updates Order DWQ Sandy Mathews August 19, 2014.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
Draft Phase II Small MS4 General Permit Water Quality Monitoring & Assessment Jonathan Bishop Chief Deputy Director Director State Water Resources Control.
Pretreatment, Pollution Prevention and Storm Water Committee California’s Storm Water Program Bruce A. Fujimoto State Water Resources Control Board February.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Presented By: Mark J. Dillon Gatzke Dillon & Ballance LLP 2012 SWAAAE MONTEREY CONFERENCE: CLEAN WATER ACT COMPLIANCE ISSUES.
Introduction to Construction General Permit Inspections.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Hydrostatic Testing Draft General Permit Draft Permit Stakeholder Outreach Meeting April 23, 2015 Moderated by: Lillian Gonzalez, Unit Manager, Permits.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
What is EcoScan? EcoScan is a small environmental consultancy that is principally concerned with: The development and implementation for its clients of.
Industrial Storm Water Permitting in California: a Regulatory Perspective An intensive overview of the program, its key principles, and likely future –
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
Presented to Georgia Airports Association Conference October 21, 2009 EPA Spill Prevention Control and Countermeasures – Update Also – What’s Coming with.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Advisory Committee Kickoff Meeting SWRCB Program to Develop Sediment Quality Objectives for Enclosed Bays and Estuaries of California July 29, 2003 CAL/EPA.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Status of California NPDES Permit. TIMELINES SEPTEMBER 2010-DRAFT PERMIT AVAILABLE FOR PUBLIC COMMENT OCTOBER 19, 2010-PUBLIC HEARING NOVEMBER 2 ND, 2010-PUBLIC.
Revised Statewide General Construction Permit September 23, 2010 CMAA Southern California Chapter Peter A. Nyquist ALSTON & BIRD LLP (213)
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Barb Loida, Carolyn Adamson, Dave Bauer MECA 2014.
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
DRAFT PHASE II STORMWATER PERMIT New Requirements Terri Fashing - MCSTOPPP Manager Wendy Atkins – City of Sonoma Stormwater Coordinator With assistance.
Phase II National Storm Water Regulations What’s in it for you?
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
California Integrated Waste Management Board Update On Long-Term Postclosure Maintenance And Corrective Action Financial Assurances Activities Permitting.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Public Workshop: RIPDES Draft Phase II Storm Water Regulations RI Department of Environmental Management RIPDES Storm Water Program July 25, 2001 Contacts:
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Small MS4 General Permit Renewal 1 Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office.
Storm Water Permit Program Authority to regulate storm water discharges derives from 40 CFR Illinois EPA is delegated authority to administer this.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
CALIFORNIA WATER ISSUES Survey of Wine Institute Advocacy Efforts Wine Institute Board of Directors Meeting – March 8, 2016 Tim Schmelzer, Director of.
2012 Industrial Stormwater General Permit Modification Presented by: Jeff Killelea Department of Ecology Moderated.
Noncoal Program Fees Environmental Quality Board April 17, 2012 John Stefanko Deputy Secretary for Active and Abandoned Mining Operations.
Welcome to the Frog Environmental Winery Compliance Association
Stormwater Pollution Prevention Program Compliance
Waste Discharge Permit: Paradise Irrigation District
Presentation to the Livingston City Council on the Phase II MS4 Permit
STORMWATER MANAGEMENT
John Tinger U.S. EPA Region IX
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Storm Water Regulation: What’s Next? Presented to: September 30, 2014

The Permits of Concern  The New Industrial General Permit  The Recent Phase 1 and Phase 2 Permits  The Renewal of the Construction General Permit

The EPA Drives the Content  Over 50% of fresh water resources are no longer fishable or swimmable  Concerns with industry are contamination from chemicals and spills  Concerns with communities are contamination from chemicals, urban slobber, and hydro-modification  Concerns from construction are sediment transfer and hydro-modification

The Industrial General Permit  Adopted April 1, 2014  Effective July 1, 2015  Will effect a significant amount of businesses not currently covered

SWRCB Stated IGP Goals  Performance Based Model  Improved Data Quality  Incentives and Flexibility  Reduce Compliance Costs (from Previous Drafts, not from current IGP)

Industrial General Permit Timeline 1991Board adopted first industrial general permit 1997Board adopted second industrial general permit 2003Board hearing on 1 st draft of industrial general permit 2005Board hearing on the 2 nd draft permit 2005Board convened a Blue Ribbon Panel of experts 2006Blue Ribbon Panel of experts completed report on Numeric Effluent Limits Board delayed development of 3 rd draft permit (SMARTS, CGP) 2011Board hearing of 3 rd draft permit 2012Board hearing of 4 th draft permit 2013August 21, 2013 – Board hearing on final draft

Previous Drafts Not Popular

Significant Changes Significant Changes from Previous Draft Permit

Significant Changes  Owner may appoint a Duly Authorized Rep.  Trade Secrets may be redacted in SMARTS  Minimum BMPs, including Training  Place holder for future TMDL’s  QISP program administered by SWRCB (Current schedule is ToR process in early 2015)  Self-guided training for P.E.’s and P.G.’s  Coverage & Annual Report through SMARTS

Significant Changes - Monitoring  Monthly visual observations  Pre-storm visual observations not required  Storm water discharge visual observations only required during sampling  Sampling frequency changed from quarterly to twice in first half on year (July 1 st – December 31 st ) and twice in second half of year (January 1 st – June 30 th )  Proposed NALs are for Oil and Gas, Total Suspended Solids, as well as any Facility specific parameters based on the site assessment. Testing for turbidity and pH but no NAL’s.  Regional Board can add parameters as they see fit.

Monitoring Incentives  Water Quality Exceedances increase Risk Level  Risk Level can be reduced with consistent compliance as proved by sampling  Sampling frequency reduction eligibility after 4 consecutive samples QSE below NALs  Frequency reduction to 2 samples per year

Phase 1 and Phase 2 Permits

Phase 1 and 2 Permits - Generalities  Vary by Region and are drafted at Regional Level in reality. Most have a Regional Approach.  Basin Plan is generally a big driver  Typical Significant Provisions: LID Design Standards – Post-construction requirements Oversight Compliance Inspections Increased review of small projects Ordinance revisions to comply with permit minimums Water Quality Monitoring Onerous Annual Report and Inventory Record Keeping Staff Training and Community Outreach  Increased costs to Permittees, & lots of new Permittees

The Construction General Permit Renewal The Current CGP vs. The Future CGP

The Current Construction General Permit  Adopted September 2, 2009, Expired September 1, 2014  Revised in 2010 to remove NEL’s  Significant Provisions: QSD/QSP Training/Certification Requirements Significant Inspection/Sampling Regimen Risk Levels for Traditional, Type Levels for LUPs Compliance Reporting in SMARTS Water Quality Effluent Action Levels (NAL’s) Prescriptive Active Treatment System Regulation Designation of a Legally Responsible Person  Extended until new permit adopted

What about the Renewal?

DISCLAIMER: MOST OF THIS IS OPINION VERY EARLY IN THE PROCESS  Staff has begun renewal permit draft  Staff has reached out to stakeholders and will have a very public process  Staff position (without Board direction yet) is to issue more of an “administrative clean up” Permit  NEL’s will not come back…NAL’s will remain close to the same thresholds (assuming EPA buy-in)  Training requirements will not be increased  Costs to comply should remain the same.  3 rd Party Groups will pressure for more requirements

Industry Concerns  Training Requirements NEVER include decision makers or our clients – WE ARE THE TRAINER  Regional Water Quality Control Board interpretations are often not in concert with State Water Board intent, which of course leads to regulatory creep and confusion  Gray areas within the Permit often cost us time and money to investigate or create defensible positions  Far too often, key information not readily available when permits are issued  Input from the people that perform the work is still rare  3 rd Party groups have the largest, most organized voice

Questions? Contact me with questions or to get involved at: Gerald R. Montgomery – Montgomery & Associates, Inc.