Regulatory Hot Topics, HCF, 18 th July 2006 Future Investment: Learning from Safety and Environmental Regulations Janet Murfin.

Slides:



Advertisements
Similar presentations
Permitting Process Overview Alasdair McKellar PPC Compliance Officer Environment Agency.
Advertisements

The Great Clean Up SOME ENVIRONMENTAL OBJECTIVES FOR TRAMWAY MUSEUMS OUR CONTRIBUTION TO A SUSTAINABLE ENVIRONMENT.
Key PPC issues for Organic Sector in 2006 PPC Workshop, 25/08/2004 Janet Murfin TT Environmental.
1 West Yorkshire Responsible Care Cell, 19 th October 2005 Proposed REC (Resource Efficiency Club), Chemicals, West Yorkshire Janet Murfin.
How to tell if you’re under IPPC SORIS meeting, CIRCE 8 th September 2004 Janet Murfin, TT Environmental.
© Imperial College London 1 Safety in the Laboratory Dr. Ann Maconnachie Departmental Safety Officer Chemical Engineering.
Pagina 1 de 3 CEPSA Química QUIMICA Palos de la Frontera Jul 12 th, 2012 CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT.
Skip instructions and start Go through instructions (recommended) Rethink waste: profit through resource efficiency Module 1 – Data Collection With support.
Hazardous Substances. Employer’s Responsibility Every employer has a duty to ensure that their employees and others are not exposed to risks to their.
Waste Management (Food Waste) Regulations 2009
WASTEWATER SYSTEM MANAGEMENT by John Lisenko Wastewater systems are indispensable for community health. One of the signs of progress and civilization is.
IChemE, Chemical Engineering Show, Harrogate, 16 th Nov 2005 PPC and COMAH update Janet Murfin.
SWWMG: MARCH 2013 LEGISLATION UPDATE. UPDATES  Industrial Emissions Directive  Waste Carrier/Brokers and Dealers (reminder)  The Packaging Regulations:
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
What to do if EMI is not available… Amanda Flint Contact: T: E: or from 1 st July2012
Site Waste Management Plans Presentation – September 2009 Planning Agents’ Forum.
GENERAL IDEAS IN AIR POLLUTION CONTROL
ECONOMIC EVALUATION OF POLLUTION PREVENTION PROJECTS CHAPTER 11.
Biofuels and (Waste) Legislation- Presentation to Funding and Legislation Workshop 29 th March 2011 Dave Gorman Head of Environmental Strategy Scottish.
IPPC Management in SMEs
Contractor Management and ISO 14001:2004
Environmental Permitting Regulations Tom Fowler – Environment Officer
TRP Chapter Chapter 1.1 Introduction. TRP Chapter Why raise hazardous waste management standards? To reduce risks of inadequate controls on.
Implementation of IED Implications for industry, particularly those involved in waste management, and the influences it has on permitting Dynes Solicitors.
Biofuels and NetRegs (& Business Gateway) Alan Parnell.
Environmental Awareness
TRP Chapter Chapter 4.2 Waste minimisation.
Susan Palachek TCEQ Pollution Prevention & Education.
Seveso II in the UK Mark Maleham tel + 44 (0)
1 Environmental Monitoring Solutions Ltd Callywhite Lane, Dronfield, Derbyshire, S18 2XN Tel: Fax: Web:
Alternative policy approaches Environmental standards Standard allowable levels of various pollutants are established by legislation or regulatory action.
Topic 1 - Laws, Regulations and Codes Textbook pages 58–61.
Supply Unit 5.
HOW TO DO Pollution Prevention & Good Housekeeping NC STATE UNIVERSITY.
© 2009 Michigan State University licensed under CC-BY-SA, original at Water Quality.
TRP Chapter Chapter 3.1 Regulatory approaches.
What is EcoScan? EcoScan is a small environmental consultancy that is principally concerned with: The development and implementation for its clients of.
Eaton Corporation Roxboro ISO Program Engine Air Management Operations Brian Phillips.
Preventing Slips & Trips at Work
The Loan Welcome! So you’re looking to finance a car? Before you look at taking out loans make sure that you are financially able to pay for a vehicle.
The UK WEEE Regulations What do I need to do? The WEEE Regulations What do I need to do? Outline Objectives of the WEEE Regulations What is WEEE An overview.
BRIDGESTONE Environnmental Management System (EMS)
LEGISLATION UPDATE Tessa Bowering Senior Environment Officer.
Innes Garden EP Charges Programme Manager. PPC Charging Discussion Document Follows on from previous consultations Proposing charge calculated from OPRA.
Clean-up of former nuclear sites and the role of the Planning regime Jim Cochrane.
© CHCS CHCS Aspects of REACH (2) Peter Short Chemical safety consultant Safety Data Services Poole.
Paul Leinster Director Environmental Protection. Overview Spearheads Regulatory & Charging Strategy Move towards Environmental Risk Based Regulation Integration.
ENVIRONMENTAL PERMITTING 1 Environmental Law. Environmental Permitting 2 Environmental Permitting (England and Wales) Regulations 2007 introduced a new.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Exemptions Review Tessa Bowering Senior Environment Officer.
The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer.
AIR POLLUTION PREVENTION AND CONTROL
Page 1 Annexes of the Directive 96/61/ES on IPPC Agency on Integrated Prevention Ms. Lucie Svobodová Integrated and Planned Enforcement of Environmental.
Overview of 3 rd Party Inspection Program for USTs.
Industrial Footprint Project Carol Kraege Washington State Department of Ecology May 9, 2006.
Health and Safety Executive Health and Safety Executive Changes to emergency planning requirements SIESO, 13 May 2013 Christina Roberts, Chemical Industries.
Rarotonga 29 th January, What is an EMP? An EMP sets out how a business will undertake its operation to manage pollution risks. EMPs deal with pollution.
Susan Palachek TCEQ Pollution Prevention & Education.
Testing Requirements in the Boiler House Requirements for regular testing will vary according to national regulations, and the type of equipment installed.
Southern California Emerging Waste Technologies Forum July 27, 2006 Conversion Technology 101.
Water Efficiency in Business. 2 Anglian Water 3 Anglian Water currently supply the same amount of water as we did in 1989 Managed demand: Metering /
WASTEWATER SYSTEM MANAGEMENT by John Lisenko
Annexes of the Directive 96/61/ES on IPPC
2015 Definition of Solid Waste Rule
Tony Almond Onshore Oil and Gas Policy Health and Safety Executive
The Disposal of Biological Waste at the University of Sheffield
Experience in the UK in implementing E-PRTR and Data Validation
Anna Hall Senior Groundwater Advisor
Van Wert, OH Water and Wastewater Element Training
Presentation transcript:

Regulatory Hot Topics, HCF, 18 th July 2006 Future Investment: Learning from Safety and Environmental Regulations Janet Murfin

Regulatory Hot Topics, HCF, 18 th July 2006 Background: Is this applicable to me? –New investors in chemical industry –Existing chemical businesses (current upturn) Does the speaker know what they’re talking about? –Just finished environmental aspects of COMAH Top Tier safety report; help SMEs keep out of COMAH –Successful low-impact PPC permit last year; one permit surrender accepted, two more in pipeline; three more PPC applications due 31 st August, various discussions/ projects –Set up and run own business from scratch, used to discussing business implications of these regulations

Regulatory Hot Topics, HCF, 18 th July 2006 Being in any business… Is ultimately about the WILL to do it, and the MONEY to make it happen Chemical industry has very long investment cycles: both these qualities are absolutely essential for success Safety and Environmental Regulations will eat away at your WILL to stay in business (“hassle factor”) as much as your pocket –Permits/ annual charges –Costs of waste and effluent disposal –Training and infrastructure compliance costs –Safety and environmental monitoring (sampling and lab costs!) –All the PAPERWORK and MEETINGS – time, effort, hassle

Regulatory Hot Topics, HCF, 18 th July 2006 Traditional attitudes to safety and environmental regulatory costs “world class” company metrics have lots of areas process companies can improve on - generally ignore safety and environmental costs eg waste disposal, PPC & COMAH permit costs But fastest growing costs are in this area - costings must show these Have worked with 2 chemical companies who didn’t realise they needed PPC permits for new processes – Company A stopped making the product, avoided prosecution; Company L reverted to being an R & D company and stopped manufacture (800kgs a year high value ester – full PPC permit, £12k to apply, £6k annual charges – annual charges alone are £7.50 a kilo) Problem for existing processes too –Company R’s site in France, had sudden product growth which overwhelmed effluent plant capacity and led to problems in river – French regulators stepped in – now pay for offsite effluent disposal (20 tankers per week)

Regulatory Hot Topics, HCF, 18 th July 2006 Licences to operate (can be closed/ prosecuted/ fined/ imprisoned for failure to have these): –COMAH –IPPC –Waste Management Licence –Planning Permission – for buildings, and Hazardous Substances Ongoing annual licence and compliance costs –All of the above except p/permission Other environmental costs –Solid waste recycling or disposal –Liquid waste recycling or treatment and disposal –Effluent treatment and disposal –Air emissions treatment (scrubber liquor, extraction wastes) Unfortunately, these charges are a significant barrier to small businesses – it’s only worthwhile for turnover of a certain size What are the costs? Need these for p/ permission on new build sites

Regulatory Hot Topics, HCF, 18 th July 2006 Cost comparisons – licences PPC Low Impact PPC Full (lowest) COMAH Lower Tier* COMAH Top Tier* Application2,76513,4503,00018,000 Annual fees4296,5003,0009,000 Estimate 1 year fees 3,19419,9506,00027,000 Time costs to apply 12,50025,00017,000135,000 Costs in Year 1 15,69444,95023,000162,000 *Figures from HSE report, 2003, for new entrants. Improvement costs not included.

Regulatory Hot Topics, HCF, 18 th July 2006 COMAH key business points (1): In business terms - if you can avoid COMAH, do so Inventory management is the key to avoiding COMAH/ keeping out of Top Tier –Keep stocks of COMAH materials below overall and individual thresholds (you really need computerised inventory for this) –Just-In-Time techniques – discharge from a tanker directly into a reaction vessel is often not included (but depends on the material being discharged, and risks must be controlled very well during discharge) –Using 3 rd party warehousing for raw materials and/or finished products (but if the warehouse only work for you, you may still have liability - example company C) As well as the HSE, COMAH is also a hassle because of Hazardous Substances Planning Consent – councils can be a problem (example - company J)

Regulatory Hot Topics, HCF, 18 th July 2006 COMAH key business points (2): Be aware of changing classifications which might put you into COMAH unexpectedly: –HSE have reclassified some substances as carcinogens (example - Diethyl Sulphate) –Environmental classifications have had COMAH limits lowered –More substances are being classified as environmentally harmful Companies are re-testing substances to get more accurate environmental results –There’s more lab standardisation, better QC/QA procedures –Some substances are less environmentally harmful than we thought –REACH will be a driver for more accurate testing, and may reduce number of COMAH environmental substances You can now be a Top Tier COMAH site with very little human risk, but large environmental risk (EA become lead regulators) – should there be a new class of COMAH site to reflect this?

Regulatory Hot Topics, HCF, 18 th July 2006 IPPC key business points (1): If you manufacture ie have a reaction, you will be under PPC Biodiesel is definitely in PPC If you don’t have a reaction, you can only be under PPC if you put hazardous substances (basically the old Red List) to groundwater, surface water or sewer If you can get low impact, do it –Similar application indirect costs (ie consultants/ management time) –Big savings on application, annual and surrender fees –But you do need to justify why still LI every year –And don’t try to pull the wool over the EA’s eyes – it won’t work Watch out for your boiler company having to make a separate application

Regulatory Hot Topics, HCF, 18 th July 2006 IPPC key business points (2): Once you’re under PPC, investment and growth brings its own problems –If you’re Low Impact, you might get to Full size –If you’re already Full PPC, may alter EP-OPRA Full PPC problems –Change in chemistry/ very large size change will need “major change” permit application – time, hassle, cost, on top of planning the changes –Same chemistry, but increase in production (not a “major change” can still increase your EP-OPRA score – eg tipping you up a notch on your product volumes; or increasing your wastes Make sure your product costing includes these “hidden” costs, and you can still charge enough to make a profit

Regulatory Hot Topics, HCF, 18 th July 2006 IPPC key low impact points: Low Impact limits have just changed - agency.gov.uk/commondata/acrobat/ippc_rgs7_v3_0606_ p dfhttp:// agency.gov.uk/commondata/acrobat/ippc_rgs7_v3_0606_ p df Waste water has increased from 20 cu m/ day to 50 cu m/ day If you extract dust and fumes, describe them as LEVs for COSHH purposes – they’re not abatement equipment, because they don’t scrub Defining the installation can be important if you have a site where you also do non-PPC operations – keep PPC separate, otherwise whole site can be brought in COMAH substances must be not more than 10% of lower tier threshold (up from 5%) Hazardous waste threshold can be quite tight (10kg/day over 1 yr, ie 3.65 tonnes) – see next slide!

Regulatory Hot Topics, HCF, 18 th July 2006 Wastes key business points: Correct waste classification is vital these days –Don’t assume your waste contractors are correct - read the small print on the EWC agency.gov.uk/pdf/GEHO0603BIRB-e-e.pdfhttp://publications.environment- agency.gov.uk/pdf/GEHO0603BIRB-e-e.pdf –As well as immediate costs, getting it wrong can take you out of Low Impact (example Company C) If you produce hazardous waste, you need to register with the EA as a producer, and RENEW your permit every year agency.gov.uk/subjects/waste/ / / / agency.gov.uk/subjects/waste/ / / / Review your consent to discharge to foul sewer regularly Re-use, recycling and composting are much cheaper than disposal Check whether you need to apply for a free waste exemption eg for using waste oils for biodiesel; or washing out containers for re-use agency.gov.uk/subjects/waste/ / / /?version =1&lang=_e agency.gov.uk/subjects/waste/ / / /?version =1&lang=_e

Regulatory Hot Topics, HCF, 18 th July 2006 Infrastructure key business points: Infrastructure is vital for environmental protection – bunds, hardstanding, drainage systems, effluent systems etc Can cost significant amounts of money – “right first time” is best Beware of “off-the-shelf” industrial units – pollution prevention standards are higher for chemical businesses. Avoid: –Emissions to groundwater eg soakaways –Emissions to surface water eg car parks draining into rivers (even via interceptors) (example - Company L) –Surface water drains in areas where chemicals are handled –Making your bunds too small (consider business growth) –Storage of chemicals on or near open ground Guidance at agency.gov.uk/business/444251/444731/ppg/?lang=_ehttp:// agency.gov.uk/business/444251/444731/ppg/?lang=_e Watch out for the storage and segregation rules – they keep changing, you may need to alter your current arrangements

Regulatory Hot Topics, HCF, 18 th July 2006 Relationships with Regulators Build relationships as you would with a key supplier (or your bank manager) Regulators are human beings too! Coffee and conversation helps Don’t fall out – it’s not their fault the regulations are complicated. The person on the ground has more power than you think –their good opinion of you may be the difference between Low Impact or full PPC Use their experience to help your project – it’s not all “business prevention”, a good regulator will help you find your way through the red tape Once you’re inside the COMAH/PPC envelopes, don’t make investments unless they agree it’s appropriate (this advice is direct from the EA – people are wasting £10s of thousands) If you change what you’re doing, let them know in advance – it’s polite, and may be able to negotiate no “major change” charges

Regulatory Hot Topics, HCF, 18 th July 2006 Further information on whether these regulations apply to you For COMAH, HSE website at For PPC, EA website at agency.gov.uk/commondata/acrobat/ippcr gsno4v2_ pdf, and also ring up for copy of “Chemicals CD” agency.gov.uk/commondata/acrobat/ippcr gsno4v2_ pdf

Regulatory Hot Topics, HCF, 18 th July 2006 Don’t finalise that investment unless you’re sure that: You know what licences and permits are needed You understand the upfront costs of these, and the ongoing fees and compliance costs You have an idea of the limits of your capacity; when you go into a higher permit, of if permit costs increase; when your infrastructure can’t cope etc You understand your wastes and effluent costs, and what would happen if these costs increased

Regulatory Hot Topics, HCF, 18 th July 2006 Do: Let regulators know your plans early on (and request confidentiality if necessary) Keep up to date with latest requirements via EA and HSE websites Talk to people in industry for advice If using consultants, get them in sooner rather than later (particularly on new build)

Regulatory Hot Topics, HCF, 18 th July 2006 Biodiesel summary page Biodiesel is definitely in PPC: agency.gov.uk/yourenv/857406/ /?version=1&la ng=_ehttp:// agency.gov.uk/yourenv/857406/ /?version=1&la ng=_e You MUST have a buyer for your glycerine by-product, otherwise the permit might not be granted (and you certainly won’t get Low Impact for PPC) If you’re buying a going concern, or a site with a “live” PPC permit, arrange for this to be transferred to you – costs £4,400, but saves at least a year plus all other costs for making a new application and getting it passed by the EA Make sure you hire people with recent experience of the chemical industry – regulations are changing rapidly

Regulatory Hot Topics, HCF, 18 th July 2006 And finally – Murfin’s Law (business version) It always costs more than you think and it always takes longer than you think

Regulatory Hot Topics, HCF, 18 th July 2006 Thank you very much Any questions? Presentation available at Contact tel: