SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26, 2013 1.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Specifications
Advertisements

ODOT Structure Project Manager Training
Precast Bent System for Bridges in Seismic Regions
2013 Northcentral Region Construction Conference
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
Project Scheduling for Load Testing Bridges for ENCE 667 Course Project Spring 2001 Justin Myers.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Idaho Load Rating Program
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Supervision and Administration
International Federation of Consulting Engineers Speaker: Richard Kell AM FTSE BE(Hons) HonFIEAust CPEng, Director, Cardno International Pty Ltd.
SHRP2 Project R04 Bridge Designs for ABC
Bridge Projects PCEF Meeting Dover, DE Aug 25, 2009 Troy M. Jenkins, P.E. Chief Engineer Northeast Prestressed Products, LLC.
Construction Industry Efforts and Capabilities to Support PBES Deployment. William G. Duguay J.D. Abrams, L.P.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Manitoba Infrastructure and Transportation RADBUG - August 2014 Water Management and Structures.
FHWA Update 2011 VOBug Meeting Helena, MT Thomas Saad, P. E. FHWA Resource Center Phone:
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
2012 Section Engineer Meeting Wednesday October 3, 2012 Presented by Steve Applegate – Project Consultant Tom Nein - Plate Production & Plant Manager.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Certification/Qualification Program. Certification Program What is it? Who is involved? What should be considered? Where can a Certification Program work.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Workforce Management System presented by Crystal Woods, Human Resources Division Head Arkansas State Highway and Transportation Department.
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
October 1, 2014 David Rush Work Zone Safety Program Manager, Traffic Engineering Division 2014 Work Zone Safety Team Reviews.
NE Regional statistics and discussion guide report Summary
Old Policy – which no one ever seem to have heard of.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Bridge Engineering Section Bridge Rehabilitation.
Approaches to Historic Bridge Rehabilitation Case Study #4
LRFR vs. LFR Virtis Opis User Group Meeting, August 2, 2011
TEA, Portland, Maine Travis Koestner Missouri Department of Transportation October 20, 2006 Alternate Paving Update $$ Cost Control at MoDOT $$
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
A SSET M ANAGEMENT Northeast Bridge Management Peer Exchange (BMPE) April 26, 2011 Manchester, NH Bridge Management Questionnaire Report Wade F. Casey,
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE XYZ STATE 1.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Office of Highway Safety Boston, Massachusetts July 10, 2006.
Project Constraints Maximum Expected Traffic Load: 2 twenty-ton, 2-axle trucks per week Channel Size: app. 6 ft wide x 5.5 ft deep Available Reinforcement.
Colbert County Budget Solutions John Bedford, P.E. County Engineer 2012 ACEA Convention.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
Kansas DOT Research Project Implementation Presented By Rick Kreider (Chief of Research) Created By Susan Barker (T 2 Engineer)
VT 100 over the Mad River Bridge Replacement July 13, 2015.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Bridge Deck Overlay Projects 101 Presentation by Central Office Bridge Rehabilitation Group.
A CCELERATING B RIDGE C ONSTRUCTION (ABC) WITH P REFABRICATED B RIDGE E LEMENTS & S YSTEMS (PBES)
Session 10 Purdue Research Updates Use of railroad flatcars as bridges on low-volume roads.
The Professional Engineer Stamp. PE Stamp Required: Optional Details Optional Procedures Optional Materials Structural Capacity Safety Results of.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Offsite manufactured Bridges
Approaches to Historic Bridge Rehabilitation Case Study #3
Blatnik Bridge Management Study
ABCD What’s New In Bridges
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
What’s new in Bridges ABCD March 2019
Historical Life Cycle Costs of Steel & Concrete Girder Bridges
Director Kirk T. Steudle, P.E.
Presentation transcript:

SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,

2 Charles (Rick) Ellis, P.E. BSCE, Michigan State University, 1992 Assistant Division Head – Bridge Responsibilities: – Assist Bridge Engineer in daily activities of Division and management of personnel. – Oversee AHTD Bridge Design Consultants. – Manage new workforce timekeeping system for the Division. – No defined role or responsibility for PBES/ABC. Introduction

3 Bridge Division is located within the Central Office complex in Little Rock and is under the direction of the Asst. Chief Engineer-Design. – Current staff of 29 includes 26 graduate engineers. – Staff is divided into 4 Design Sections and 1 Structural Inventory and Rating Section. – Design Sections produce plans and specifications for bridges, box culverts, retaining walls, overhead sign structures, etc. – Inventory & Rating Section is responsible for load rating and recommending postings for the approx. 13,000 bridge length structures in the State. Also responsible for analyzing bridges for overload vehicles. Project Planning, Programming and Research is undertaken within the Central Office complex in Little Rock and is under the direction of the Asst. Chief Engineer-Planning. Construction and Maintenance and bridge management and inspection are undertaken within 10 districts and is under the direction of the Asst. Chief Engineer-Operations who is located within the Central Office complex in Little Rock. Organizational Structure

4

5 How many bridges replaced and at what cost? – State: $80 Million per year – Local: $6.6 Million per year *Does not include bridges replaced with box culverts. How many bridges rehabilitated and at what cost? – State: Practically zero – Local: Practically zero – Recently began a Bond Initiative to repave interstates. Part of program will rehabilitate bridge decks using Hydrodemolition with Latex Modified Concrete Overlays. Volume of Work

6 AHTD does not have a process or policy in place to support implementation of PBES/ABC type activities and projects. AHTD does not have a decision making tool or method to assist in the identification and selection of cost effective PBES/ABC type projects. Planning and Decision Making

7 AHTD’s greatest challenges or barriers in the effective implementation of PBES/ABC type initiatives and products. – Lack of education/experience – Detailing and Design, especially seismic – Lack of experience among local Contractors – Few precast Fabricators within state PBES/ABC Implementation Barriers

8 Common Arkansas Bridge Types & Span Ranges: – Steel Beam/ Girder Units, 35’-150’ spans – Prestressed Beam/Girder Units, 50’-130’ spans Limited Arkansas Bridge Types & Span Ranges: – *Reinforced Concrete Channel Beams; 19’, 25’ & 31’ spans – Double Basket Handle Network Tied Arch currently under design by Consultant, 440’ long and approx. 90’ tall. PBES available within Arkansas: – *Reinforced Concrete Channel Beams *Used often in the past on low volume routes. Recent use diminished due to incomplete conformance to LRFD. Bridge Types and Materials

9 Contracting Options commonly used by AHTD: – Value Engineering – A+C (Cost + Time) Construction Alternatives commonly used by AHTD: – Lane Closures or Detours – Non-Peak Hour Construction, nighttime closures – Non-Peak Hour Construction, weekend closures Contracting and Construction

10 AHTD does not have any involvement with transportation industry groups in support of PBES/ABC type projects. AHTD has participated in and is interested in continuing participation in domestic PBES/ABC scanning tours. Education and Outreach

11 AHTD has no great success in the implementation of PBES/ABC type activities and projects. PBES/ABC Successes

12 AHTD’s future endeavors for implementation of PBES/ABC type projects has not yet been determined. PBES/ABC Future Endeavor

13 Questions

14 More Questions