Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.

Slides:



Advertisements
Similar presentations
Chapter McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Cost of Sales and Inventory 6.
Advertisements

Construction Engineering 221 Cost Estimating and Bidding II.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 6 The Income Statement and Its Analysis.
Wrap Rate Technique Chapter Introduction The Wrap Rate technique is a method used to allocate profit and other overhead costs to actual.
Basic Management Accounting Concepts Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson.
Cost Planning & Scheduling CTC-415. Bid Estimate Becomes the project budget upon signing of contract Can cost load the schedule –Effective means of cost.
Types of Costing Systems (Pages ) By Ted House(former parts manager)
Farm Management Chapter 6 The Income Statement and Its Analysis.
November 16, Part 4 The Value Chain Job Costing and Overhead Rates Actual versus Budgeted Amounts Levi Strauss Factory Example Absorption Costing and Variable.
Welcome to Financial Series #1 The Income Statement.
ESTIMATING By Laith Jacob.
Income Statement Net Sales - COGS = Gross Profit - Operating Expenses = Operating Income - Interest expenses & taxes = Net Income.
Financial Aspects of a Business Plan
EM15 – Contractors COST MANAGEMENT
ACC3200 Chapter 2: Job Order Costing Job Order Costing.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Setting the Right Price. Lesson Goals: Learn how to: –Calculate total costs –Calculate a profit margin –Use break-even analysis Identify the difference.
March 2005 UMORS 1 UMORS Vander Kooi and Associates, Inc Ultimate Multiple Overhead Recovery System.
CHAPTER TWO The Nature of Costs. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 2-2 Outline of Chapter 2 The Nature of.
Piecing It All Together ! Fundamentals to Consistently Make Money with Your Business Presented by: Tyler Construction Engineers, P.C.
Section 36.2 Financial Aspects of a Business Plan
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Improving Safety through Efficiency in the Construction Industry – Is it a Fallacy? Presented by: Todd Hohn Brian Roberts.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
SCORE ® Counselors to America’s Small Business Service Corps of Retired Executives Create a Winning Business Plan Session 5 Supporting Documents Other.
MODULE 2 INTRODUCTION TO FORECASTING WEL Financial Intelligence.
2.10 Entrepreneurship I.  A category of expenditure that a business incurs as a result of performing its normal business operations.  Examples include:
Chapter 2 Basic Managerial Accounting Concepts
Chart Your Course to Business Success On Target Business Intensive: Session 6 May 1, 2012 Advisors On Target 1.
Technical Manager; Bechtel Oil, Gas & Chemicals.
Budgetary Control and Responsibility Accounting
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
INTD 55 business practices charging for your services.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Copyright 2010, The World Bank Group. All Rights Reserved. 1 Construction statistics, part 2 Business statistics and registers.
Profit Margins and Competition in Fashion Industry.
2.10 Entrepreneurship I.  A category of expenditure that a business incurs as a result of performing its normal business operations.  Examples include:
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Chapter 9 Analyzing Start-up Financial Risks and Benefits.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
On Target Group Coaching for Painting Contractors July 3, 2014.
The Nature of Costs Chapter Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Cash Flow Analysis Part 2 King Saud UniversityCE511- Construction Planning & Control 1.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Maintaining Profitability or improving profitability Phillip Rosebrook, Jr. CR.
The Decision Maker. Managing a Profitable Company.
POB 4.01 PARTS 1 & Understand financial planning.
Measurement and Payment
Finance for Non- Financial Managers Presented by Greg Tilley Weather Gage LLC February 2, 2016.
Unit 3.5 Final Accounts. Financial Statements ▫Profit and Loss account ▫Balance sheet ▫Cash Flow statement Financial Accounting Management Accounting.
Markup vs. Margin Margin is the amount of gross profit, net profit, or overhead, compared to volume of work. (Expressed as a percentages) Markup is the.
Randy Wadle, CEO. Client Profitability  Breaking Down the P&L  Billable Services  Measuring Cost of Service  Client Scorecards.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc., All Rights Reserved CHAPTER 13 McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc.,
Is There a Proper Accounting for Indirect Costs?
Implement expense-control strategies
Cost Accounting and Reporting Systems
Lecture 08.
Understanding Accounting and Financial Information
Cost Concepts and Design Economics
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Implement expense-control strategies
Classification of Cost
Implement expense-control strategies
4.01 Understand financial planning.
ARCH 435 PROJECT MANAGEMENT
Presentation transcript:

Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices

Victor C. Tyler, P.E. President/ owner of Tyler Construction Engineers, P.C. Licensed Professional Engineer in state of Tennessee Author “How To Estimate Road Construction Accurately” Cost and Pricing Specialist Management consultant to the engineering & construction industry

How Time In Construction is Spent Opportunities for improvement  Planning makes actual installation more efficient  Other activities such as site movement, material logistics, general non- productive time and rework is minimized 64% Installation 36% other activities

The Average Construction Day DESCRIPTION %HOURS/DAY Study Plans3%0.24 Material Procurement3%0.24 Receiving & Storage3%0.24 Mobilization5%0.40 Site Movement5%0.40 Layout & Marking8%0.64 Actual Installation64%5.12 Cleanup3%0.24 Breaks – Non-Productive6%0.48 TOTAL DAY 100%8.00

Look at 176 Man-hour Month Where can we improve? DESCRIPTION % HOURS/ MONTH Study Plans3%5.28 Material Procurement3%5.28 Receiving & Storage3%5.28 Mobilization5%8.80 Site Movement5%8.80 Layout & Marking8%14.08 Actual Installation64% Cleanup3%5.28 Breaks – Non- Productive 6%10.56 TOTAL MONTH 100% For one employee approximately 63 hours per month is spent on activities other than actual installation …. approximately 760 hours per year for that one employee.

$45,619 per year If you have 4 full-time field employees paid at $15 per hour … That’s why I talk about productivity in the estimating processes for both field employees and equipment. Today’s Tip Use accurate rates and reduce idle time.

Only _____ ______ are 100% Productive! Lunch Breaks

8 Estimating Accurate Job Costs Bidding on Profitable Jobs Making Profits on Every Job Won

Thus the top priority for the estimator is to estimating accurate job costs. The job of every estimator is to help his or her firm acquire profitable work.

Strategy

Tyler’s Cost Strategy Organized and document data 2. Be detailed and factual 3. Base the estimate on historical data 4. Use a predictable, measurable and repeatable processes (use checklists, templates, software) 5. Always monitor your progress and make adjustments as required

Tyler’s Cost Strategy Know and understand your costs (Labor + Material + Equip + Subs + Job Site Overhead) 7. Make the estimate comparable to the P&L Statement (Revenue – Job Cost – Overhead = Profit) 8. Cost first,…then price (Price = Direct Costs + Overhead + Profit)

Know Your … Direct Job Cost Material Labor Equipment Subcontractors Other direct cost

Know Your … Job Site Overhead Costs (General Conditions)  Labor Burden  Indirect Labor  Job Supervision  Tools & Consumables  Insurances  Travel  Other

Cost First, then Price

. Strategy

Accounting is BORING!

Bid Price Structure Contract Price Total Cost Direct Cost Labor Mat l. Jobsite OH Markup Work Item Cost Gen & Admin. Profit Markup Jobsite OH Subs Equip

Estimate Summary The Estimator’s View Direct Costs …………………….. $$$ Direct Labor Equipment Materials Subcontractors General Conditions plus Labor Burden (%) plus Job Site Overhead (%) equals Total Direct Cost ……….. $$$ plus General & Administrative (%) plus Profit Rate (%) plus Bond Rate (%) equals T otal Contract Price ……… $$$ Company Income Statement The Accountant’s View Contract Revenues …………………… $$$ minus Direct Cost of Sales Direct Labor Equipment Materials Subcontractors Other Direct Costs minus Indirect Costs.……………… $$$ Labor Burden Benefits Indirect Expense equals Gross Profit ………………… $$$ minus General & Administrative Expenses equals Income (Loss) Before Taxes …… $$$

Understanding Risk & Pricing Project A Project B Project C Labor Material Equipment Subcontractor Other $10,000 $20,000 $5,000 $169,000 $2,000 $50,000 $70,000 $7,000 $76,000 $3,000 $90,000 $20,000 $2,000 $4,000 Total$206,000 Overhead – 10%$20,600 Profit – 12%$24,720 $ Total bid $251,320 Example from Book, “Managing a Construction Firm on just 24 hours a day”, by Matt Stevens

Understanding Risk & Pricing Project A Project B Project C Labor Material Equipment Subcontractor Other $10,000 $20,000 $5,000 $169,000 $2,000 $50,000 $70,000 $7,000 $76,000 $3,000 $90,000 $20,000 $2,000 $4,000 Total $206,000 Dual Overhead Allocation Labor/Equipment – 15% Material/Subs/other –5% Office Overhead – 10% $4,500 $9,550 $20,600 $8,550 $7,450 $20,600 $16,500 $4,800 $20,600 Profit – 5% $12,033$12,130$12,395 Total bid $252,683$254,730$260,295 Example from Book, “Managing a Construction Firm on just 24 hours a day”, by Matt Stevens

Margin vs. Markup Job Profit and Loss Statement Sales ……………. $ 700,000 Less COGS … ,000 Gross Profit ……. 193,000 Less OH ………..… 175,000 Net Profit..…….. 18,000 As a % of Sales 100 % 72 % 28 % 25 % 2.6 % Markup As a % of Direct Cost 138 % 100 % 38 % 34.5 % 3.6 %

Basic Cost Summary % of Revenue Revenue $ 700, Labor 120, Material 300, Equipment 75, Subs 12, Overhead and Profit 193, Expanded Cost Summary % of Direct Costs Revenue$ 700, % Direct Costs Labor 120, Material 300, Equipment 75, Subs 12, Other Cost5, Total Direct$ 512, Job Site OH Labor Burden$ 40, Supervision 75, Total Job Site$ 115, Total Cost Input$ 627, Gross Profit73, Overhead55, Profit $ 18,

Quick Study Example: Cost Multipliers You are preparing a bid for Project XYZ and have estimated the direct costs as follows: Direct Costs Labor - $ 75,000 Material - $150,000 Equipment - $ 75,000 Subcontractors - $ 50,000 Create an estimate summary utilizing the cost multipliers we calculated. Therefore, the estimate summary becomes: Direct Cost (labor, material, equipment, subcontractors)= $ 350, Labor Burden:$ 75,000 x (25.93 % )= 19, Job Overhead: $ 350,000 x (14.53 %)= 50, $ 420, Office Overhead: $ 420, x (7.81 %) = 32, Total Project Cost (without Profit) = $ 453,128.12

Strategy to winning more profitable work. Position (Market) Project People Product / Service Price Production Profit

Best Practices … Know Your Cost (Estimating) Understand Your Cost (Project Management) Control Your Cost (Project Accounting) Continuous Improvement (Always)

on each & every job

More Predictable

QUESTIONS?

810 Dominican Drive, 3 rd Floor Nashville, TN Thank You!