1 2014 Workshop 2014 Residential Standard Offer Program October 23, 2013.

Slides:



Advertisements
Similar presentations
Workshop 2012 Residential Standard Offer Program October 19, 2011.
Advertisements

COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.
1 1Line Training Capacity Release - Phase II Awards and Recall/Reput.
Hard-to-Reach Standard Offer Program October 23, 2013.
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
Contamination Cleanup Grant Program Implementation Workshop.
DANIEL SELIGMAN Policy Manager, Maryland Energy Administration NICHELE PARKER Program Manager, Maryland Energy Administration.
FQHC Look-Alike Change in Scope Module for Implementation of Electronic Information Systems August 5, 2010 Esther Paul, Public Health Analyst Anil Bommakanti,
Grow your business with Dominion Power and Good Cents
Summary of Customer Service Rules for Low-Income Electricity Customers Paul Gasparatto Policy Advisor.
Biller Direct Getting Started
Internet Applications Update Internet Rechartering August 26, 2009.
Guide to using the myNATE website
STANDARD OFFER PROGRAM 2012 WORKSHOP RESIDENTIAL & HARD TO REACH.
User Guide. Service Benefits  Full on-line management of client accounts  Paperless direct debit – no signatures required  Standing orders fixed not.
SRC Application Process Fall 2014 Version: November 12, 2014.
Workflow & Event Derivation Workshop
United Nations University United Nations Development Programme UNU Atlas Implementation Project Atlas Briefing Sessions – Tokyo Mar 2009 Requisitions,
Prepared by. As stewards of a chapter’s money the chapter officers are responsible for the careful handling and dissemination of funds.
Adjustment & COCP Barbara Kwok Licensing Operations Specialist.
Workflow & Event Derivation Workshop
Dispatch Load Board. Is Your Company Looking For A Better Way To Manage Itself Logistically? _______________________________________________________________.
Solar Incentives for Arizona Public Service, Salt River Project, Tucson Electric Power.
Session #15 The StudentLoans.gov Experience Julie Aloisio Rosa Trejo U.S. Department of Education.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Training Presentation This presentation is meant for end users of the ZERO Plan program. The Training will include: Overview of the ZERO Plan process and.
TEXAS Market Profile January TEXAS Market Market Size: $24 Billion Potential Market 7.1 Million Potential Customers.
Rachel Weaver Program Manager Maryland Energy Administration
ECheck Requisition System Updated 12/29/2008https://enet.miami.edu/
1 Ground Source Heat Pump Rebates 2013 February 13, 2013 Ann Kirkpatrick, Trade Relations Manager.
Hard-to-Reach Standard Offer Program October 9, 2012.
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
PURPOSE OF PAYROLL CERTIFICATION 1 The Payroll Certification is an important tool for Fiscal Officers and/or Delegates. It’s purpose is to allow Fiscal.
March 2008 Electronic Billing (EB) Developed by the Department of Developmental Services Developed by the Department of Developmental Services.
First 5 LA Invoicing & Budget Modification Workshop OHCD Contractors FY
Tips & Tools for Successful Implementation Created by Choice Strategies.
FIRST 5 LA Baby-Friendly Hospital Project New Contractor Orientation September 20, 2011.
1 Permits, Licenses and Inspections Regional Project Introductions: Home Builders & Remodelers Association of Cape Cod State Project Sponsor & Technical.
DTE Energy Commercial & Industrial Energy Optimization Program Energy Efficient, Sustainable Detroit DTE Energy Headquarters December 9, 2010.
LEAP Emergency Financial Assistance - Training Webcast: Social Service Agency Partners November 25 & 26, 2010.
2 California Solar Initiative Latest Handbook Changes The slides for today’s presentation can be downloaded/printed at
Matching Grants. Address humanitarian conditions that benefit a community in need Direct Rotarian involvement Match at least two countries (host and international)
1 Military Base Standard Offer Program El Paso Electric.
Money Handling Procedures Updated by Roger Sparrow, Karen Ramage & David Herbst April 2014.
Lead Management Tool Partner User Guide March 15, 2013
Agent Activation Portal. Capabilities New Customer Activation New Customer Activation Status Existing Customer Verifications Check rate plans, contract.
Redevelopment Grant Program Implementation Workshop Spring 2010.
Transaction Fee Reporting System User Guide for State Term Contract and State Purchasing Agreement Vendors.
MyFloridaMarketPlace Vendor Performance Tracking Overview: Requestor Interface February 23, 2006.
Sharyland Utilities’ 2014 Residential and Hard-to-Reach Standard Offer Program Workshop February 2014 Dial In:
ENCOMPASS Voucher Build Process
Automated Statement of Accounts Project and Operational Guideline March 2011.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
Card Verifying and Approvals Office of the Controller.
October 2006 Web interChange - Basic Presentation Presented by the EDS Provider Field Consultants.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
Payments Made Clear; Payments Made Quick™ HealthCare Payment Solutions Patient Friendly Payment Solutions.
DUAL FUEL HEAT PUMP REBATE APPLICATION Name:__________________________________________ Co-op Account #_________________________ Address where appliance.
Student Accounts Cashier’s Office
2016 Commercial Project Submittal Webinar
PEOPLESOFT 101 October 27, INTRODUCTION The detailed business process for reconciling/approving PCard transactions (including uploading documentation)
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
PURPOSE OF PAYROLL CERTIFICATION 1 The Payroll Certification is an important tool for Fiscal Officers and/or Delegates. It’s purpose is to allow Fiscal.
BLACK HILLS ENERGY 2016 Energy Efficiency Portfolio Annual Results Overview December 8, :00am – 12:00pm MST Mark James – Energy Efficiency Program.
iLab Training for VU Departments & Users
Health Savings Account (HSA) Funding & Invoicing
2018 Residential & Hard-to-Reach Standard Offer Programs Workshop
Ohio Web Portal Ohio Edison, Illuminating Company, Toledo Edison
Home Performance Program “Healthy, Comfortable & Efficient”
Presentation transcript:

Workshop 2014 Residential Standard Offer Program October 23, 2013

Agenda Key Changes for 2014 Overview of RSOP RSOP – TCC Large Projects Small Projects RSOP – TNC Single Program Summary 2

3 KEY CHANGES for 2014  Sites  Residential dwellings, or additions, completed after January 1, 2012 do not qualify  TNC now a single program  Re-defined Underserved TNC  Incentive TNC  A new field to report “# of bedrooms” has been added as a required field on the customer input form  New document upload feature added to database

4 Continuing in 2014  Work schedules required for Project Sponsors completing duct efficiency and infiltration measures in Single Family projects  Changes to the Host Customer Agreement and Acknowledgement Form to include all Pre and Post CFM readings for Duct Efficiency and Air Infiltration measures and “R” Value of Existing Ceiling Insulation  All use of marketing, including social media, telemarketing, etc., must be approved by AEP prior to use

5 RSOP Overview

Residential SOP Overview  Program adheres to PUCT rules and guidelines  Internet application and reporting  Incentives paid for kW and kWh savings  AEP  reviews, approves, rejects applications  pre-approves all marketing material, including social media and telemarketing  processes Incentive Requests based on inspection results  manages programs and incentive dollars  adjusts programs as needed to meet goals

Residential SOP Overview  Project Sponsor  Enters into SOP Agreement  Follows program requirements outlined in manual  Identifies project opportunities  Markets program and negotiates terms with customer  Verifies customer eligibility – ESI ID  Explains to customer:  Role of PS, AEP and customer  HCA – Customer protection, complaint process  AEP does not provide endorsements  AEP does not pay for measures, material or labor  Installs and reports qualifying measures

8 Eligible Customers and Measures

9 Eligible Customers  Customer must be an AEP distribution customer  ESI ID begins with:  TCC ….  TNC ….  May be a customer of any Retail Electric Provider  Customers of Municipals and Co-ops are not eligible

10 Eligible Customer Sites Residential Only  Single-family  Dwellings consisting of two or less units (i.e., a duplex or less)  Multi-family  Individually-metered are residential (each unit)  Common areas and master-metered are considered commercial; not eligible Residential dwellings, or additions, completed after January 1, 2012 do not qualify for the program

11 Eligible Measures  High-efficiency A/C and heat pump retrofits  Insulation  Infiltration control (includes an upper limit on the pre-retrofit CFM reading of 4 CFM per square foot of conditioned space)  Duct sealing  Refer to Program manual for other measures

12 Eligible Measures All measures shall meet criteria defined in program manual and installation standards described in deemed savings appendix Excellent workmanship is expected  Proper materials, applications

13 Required Forms  Host Customer Agreement and Acknowledgement  Customer authorizes work  Customer verifies work complete  Customer acknowledges AEP may inspect work  Requires Pre/Post CFM readings for DT and IN  Requires existing R-value for CI  Work schedule required:  Multi-family projects  Duct efficiency  Infiltration

14 Reporting  Homes cooled with window a/c only are considered “gas” for heat type (electric space heaters are plug loads)  Measures must be reported within 45 days

15 Marketing  All marketing material, including social media, telemarketing, Craigslist, etc., must be approved by the appropriate program manager prior to use.

16 TCC - Small vs. Large Projects

17 TCC  Large Projects  Project size equal or greater than $10,000  Reserves funds for program year  Small Projects  No minimum project size  Reserves funds for 30 days  First-time participants start here

18 TCC - Small vs. Large Projects Small Projects  Smaller project size  No security deposit  Funds reserved 30 days  Max. PS Incentive:  Per request - $5,000  Per Month - $25,000  Per Year - $150,000 Large Projects  Minimum project size $10,000  5% security deposit  Funds reserved to November 30, 2014  Max. PS Incentive:  $150,000

19 TCC - Small vs. Large (cont.) Small Projects  No milestone  M&V Options  Deemed Savings  Eligible Customers  Single-Family  New participants begin here Large Projects  Milestone schedule  M&V Options  Deemed Savings  Measured Savings  Eligible Customers  Single-Family  Multi-Family

20 TCC - Large Projects: Security Deposit  5% of approved amount  Cashier’s check, Certified check, money order, or guaranteed check  Refunded when 90% of contract achieved from inspection adjusted incentive reports

21 TCC - Large Projects: Milestones  40% of contract met by May 31, 2014  75% of contract met by August 31, 2014  Failure to meet any milestone may result in contract reduction or termination

22 TCC - Incentive Payments kW kWh  Standard Incentive Rate$242$0.08  Underserved Counties$296$0.10  Load Factor Cap: For all combined kW and kWh incentive payments, incentive is limited to $627 per kW at TCC

23 TCC - Underserved Counties  Incentives paid at underserved counties rate until budget for underserved counties depleted, then paid at Standard Rate  Underserved budget included as part of the total program budget:  Large Projects$ 650,000  SmallProjects$ 650,000

24 Underserved Counties - TCC ATASCOSAEDWARDSKINNEYUVALDE BEEFRIOLA SALLEVAL VERDE BROOKSGOLIADLIVE OAKWHARTON CALDWELLGONZALESMAVERICKWILSON COLORADOGUADALUPEMCMULLENZAPATA DE WITTJACKSONMEDINAZAVALA DIMMITJIM WELLSREAL DUVALKENEDYREFUGIO

25 Incentive Payment Example Install HVAC measures resulting in savings of: 25 kW 55,000 kWh Incentive Payment if site is in regular county (different if in underserved county): $242/kW$0.08/kWh Total Incentive $ 10,450 before any limits

26 TNC

27 TNC - Incentive Payments kW kWh  Standard Incentive Rate $254$0.084  Underserved Counties $296$0.10  Load Factor Cap: For all combined kW and kWh incentive payments, incentive is limited to $658 per kW at TNC

28 TNC - Underserved Counties  Incentives paid at underserved counties rate until budget for underserved counties depleted, then paid at Standard Rate  Underserved budget included as part of the total program budget: $63,000

29 Underserved Counties - TNC BRISCOEKENT COTTLEKING DICKENSKNOX FOARDMOTLEY HALLSTONEWALL HARDEMAN

30 How Do I Participate as a Project Sponsor?

31 Participation  Review Program Manual and SOP Agreement  Determine Project Size  TCC - Determine if Large or Small Projects  1 st -time participants apply in Small Projects  Register on program website if a 1 st time user  Complete and review on-line application  All applications must be complete and ready to submit by the program submit date  Submit application via internet  Upload testing procedures, if applicable

32 Participation (cont.)  Applications will be reviewed upon receipt  Contracts will be awarded based on project sponsor qualifications, performance history, etc., to ensure program goals will be achieved with quality installations and timely reporting  Provide proof of statutorily-required insurance  Once Application pre-approved, enter into a contract with AEP to install eligible measures  Refer to Program Manual and Program Website for additional information

33 Create Application  Update and/or Complete Project Sponsor Details  Sponsor Profile  Qualification Documents  Subcontractor Information  Project Description  All fields must be completed on each form  All forms not listed here

34 Application Schedule  1 st Day to Register  TCC and TNC – October 24, 10:00 am CDT  Begin applications  Submit applications:  TNC:November 5, 10:00 am CST  TCC Large:November 6, 10:00 am CST  TCC Small:December 3, 10:00am CST

35 Implementation Schedule  January 7, 2014  TNC Reservations 10:00 AM CST  TCC Large Projects Implementation pages 10:00 AM CST  January 21, 2014  TCC Small Projects Reservations 10:00 AM CST

Implementation Schedule  ALL  Must have 2014 HCA’s prior to implementation  Must have Approved status to make reservation  Open reservation required before installations begin 36

37 Marketing AEP will not provide marketing assistance or endorsements  Use of AEP name not allowed  Exception: pre-approved Informational Brochure  Informational Brochure  Available for download on “Downloads/Tools” on program website  Any other materials must be pre-approved by program administrator (telemarketing, radio, , newspaper, flyers, social media, etc.)

38 Identify Project Opportunities Project Sponsor must:  Verify customer eligibility  Obtain Original Customer signature and date on Host Customer Agreement & Acknowledgement form authorizing work to be performed

39 Multi-family Projects  Obtain pre-approvals for Multi-Family Projects  Site  Measures  Work Schedule  Duct Description  TNC – must submit MF template to reserve MF funds

40 Install Measures Reserve funds via internet  TCC Small Projects  TNC Large Projects (TCC)– Funds previously reserved by contract Submit work schedule for duct efficiency and infiltration measures Install measures Original Customer signature and date on Host Customer Agreement & Acknowledgement form to verify completion

41 Reporting and Invoicing  Add Installations within 45 days of completion  Monthly reporting via internet  Submit Incentive Report by the last day of the month, but no earlier than the 15 th.  Inaccurate reporting results in failures  AEP will process inspection-adjusted invoice within 45 days in normal circumstances

42 Installation Inspections  Random sample of measure installations  Verify that number of installed measures equals number of reported measures  Verify measure is installed and capable of performing its intended function with a 10 year life  Verify that measures qualify and that installation standards were followed  Verify measures were reported in a timely manner

Reporting Issues  Work schedules not kept current  Installations added but not reported within 45 days of installation

44 Common Reporting Issues  Accurate reporting – measures reported not found  HCA’s and Installations done prior to application approval or open reservation  Home square footage errors (tax records not always reliable)  ALL signatures and dates on HCA’s – customer, project sponsor, subcontractor (if applicable)  Duplicate measures on invoices (review before submitting)

45 Common Reporting Issues (cont.)  Ceiling Insulation – inaccurately reporting existing R-Value; # bags reported should match CI tag  Listing a service area on application and not servicing that area  Listing a measure on application and not providing that service  Silicone sticking A/C supply registers to ceiling sheetrock and supply boot  Inspection scheduling issues  Homeowners expecting a “Bill of Sale”

46 Photo Examples of Failed Measures Duct Efficiency, Infiltration, and Insulation

47 Duct Efficiency

48 Duct Efficiency (cont.)

49 Infiltration

50 Infiltration (cont.)

51 Infiltration (cont.)

52 Insulation

53 Insulation (cont.)

54 Program Website Refer to for:  News & Updates  Latest program announcements  FAQ’s  Program Manual  Program Downloads/Tools  Program contact information

55 AEP Contact Information  TCC – Jim Fowler  Phone:   TNC – Rhonda Fahrlender  Phone: 

56 Comments and Questions……………….