Save the Rain Program Overview Onondaga Lake Amended Consent Judgment (ACJ) Compliance Program, January 2011 Joanne M. Mahoney, County Executive.

Slides:



Advertisements
Similar presentations
The Committee and Research – Where are we and where might we be going?
Advertisements

Growing Green Infrastructure in Central New York through Green Job Training Virginia Williams SUNY ESF Outreach This project has been funded in part by.
Porous pavements, green roofs, bioretention... Case studies of urban retrofit GI measures funded by Onondaga Countys Green Improvement Fund Growing Green.
Project Background and Objectives
Map-Based Modeling of People’s Knowledge, Perceptions and Willingness to Participate in Green Infrastructure Alternatives to Traditional Storm-Water Management:
Onondaga County CSO Abatement Gray Project Update.
Roger Williams Park Ponds Restoration Project. Project Update Concept Plans Developed for Structural and Non- Structural Best Management Practices Draft.
Ann Arbor Sustainability Managing Built and Natural Assets Efficient Delivery of City Services 2011.
WHAT IS GREEN INFRASTRUCTURE ? Khris Dodson, Environmental Finance Center November 17, 2010.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Funding for Municipal Infrastructure Ruth Noemí Colón Acting Secretary of State George Stafford Deputy Secretary of State Public Finance and Management.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
2013 Stormwater Workshop June 13, 2013 Sponsored By Michiana Stormwater Partnership John J. Dillon Director, LTCP Management City of South Bend.
U.S. Environmental Protection Agency Region 2 Green Infrastructure – Community Vision March 14, 2013 Ensuring safe and clean water for all Americans Ensuring.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Kari Mackenbach, Green Initiatives Practice Leader, URS Christine Worley, URS Flood and Stormwater Mitigation Using Green Infrastructure.
Water Too Much or Too Little? Or a Little of Both? URS Group Inc ASFPM National Conference May 2010.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Spokane River Forum Conference March 26,  About 1/3 of City  130 outfalls.
Renewing Natural Processes in An Urban Area — An American Perspective Samuel H. Sage 1, Hongbin Gao 1 and Ping He 2 Atlantic States Legal Foundation 1.
The Partnership for Onondaga Creek is a voice for the Community and the environment advocating for better, Non-polluting solutions for Onondaga Creek and.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
Using Rainwater to Grow Livable Communities Sustainable Stormwater Best Management Practices (BMPs)
Dean Marriott Environmental Services Director Janet Gillaspie Oregon ACWA Executive Director.
Samuel H. Sage, Paul M. Harris & Hongbin Gao ATLANTIC STATES LEGAL FOUNDATION, INC. Growing Power's National-International Urban & Small Farm.
CSO Strategies & Financial Management Mayor Gregory A. Ballard City of Indianapolis December 9, 2010.
NYC Green Infrastructure Program
1 Nassau County NY United Water Partnership The US Conference of Mayors Mayors Water Council April 30 – May 1, 2015 Rob Walker Chief Deputy County Executive,
Green City, Clean Waters: Philadelphia Green Schoolyards
Water Research Foundation Workshop: Benchmarking April 23, 2015.
1. DRAFT 2 Encourage Economic Growth Establish Regional Branding Committee Identify two Businesses to Receive SEED Incentive Grants Complete Construction.
District of Columbia Water and Sewer Authority Fort Stanton (CSO 006) Separation Project - Status and Coordination Update - for the Environmental Quality.
Bill Eyring – CNT Senior Engineer Illinois Sustainable Technology Center September 29, 2010 Monitoring and Documenting Green Stormwater Best Management.
Water Management and Conservation in the Landscape (outline) The Water Cycle Stormwater: runoff, conveyance and treatment with urban infrastructure, discharge.
Nutrient Management in the Urban Landscape Rebecca Kluckhohn, P.E. Watershed Engineer West Metro Water Alliance Forum, May 18 th 2011 W W e n c k Engineers.
West Metro Water Alliance A Path to Clean Water – Understanding TMDLs and Watershed Planning September 21, 2011 Diane Spector Wenck Associates, Inc.
Leila Talebi (3/28/2012).  The existing land use of Cincinnati Zoo consists of various types including parking lot, open space areas, and steep wooded.
Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015 Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015.
th Street, NW, Suite 1400p Washington, DC 20005f Using Funds Wisely – Promoting Green Infrastructure.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
The New York State Environmental Facilities Corporation Green Innovation Grant Program (GIGP) $20 Million 27 projects selected Projects from every Region.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Houston Land/Water Sustainability Forum David W. Peters, P.E., CFM, D.WRE February 6, 2008.
URBAN STORMWATER: A PERFECT STORM FOR CHANGE Jon M. Capacasa Director, Water Protection Division EPA Region III.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Frederick A. Laskey Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority.
Fixing Our City’s Old Sewers How the state is helping In early 2015, New Jersey issued new permits to the 25 communities and sewage treatment plants that.
Using New Jersey’s State Revolving Fund to Reduce Combined Sewage Flooding in Camden City Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer.
1 Using Green Infrastructure to Alleviate Poverty and Promote Healthy Communities: Legal and Policy Solutions for the Urban Environment Alexandra Dapolito.
Aaron Cosentino City of Elgin Rob Linke, P.E., CFM Trotter & Associates, Inc. Lord Street Basin CSO Green Infrastructure Retrofit Project November 14,
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
City of Joliet 2014 Proposed Budget November 2013.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Lower Rio Grande Valley Low Impact Development (LID) Implementation and Education by Brianna Saenz,MS, EIT AUGUSTO SÁNCHEZ-GONZÁLEZ, M.S, CFM. Institute.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
Stormwater Utility City of Rowlett
TMDL Implementation: Now What?
GREEN STREETS | GREEN JOBS | GREEN TOWNS INITIATIVE
Manchester’s CSO Program: A Look Behind and a Look Ahead
Natural Environment: 0% Impervious Surface Built Environment:
11/21/2018.
GREEN INFRASTRUCTURE PLAN FOR (Permittee)
[OUR CITY NAME]’S OLD SEWERS
Fixing Our City’s Old Sewers
“Balancing Gray and Green Infrastructure”
The Wausau Wastewater Treatment Facility
2019 Budget-in-Review and 2020 Proposed Budget City of Mahnomen
ECONOMIC INCENTIVES FOR
Presentation transcript:

Save the Rain Program Overview Onondaga Lake Amended Consent Judgment (ACJ) Compliance Program, January 2011 Joanne M. Mahoney, County Executive

1/21/11 2Agenda 1.Fourth Stipulation to the ACJ : “Save the Rain” 2.Gray Infrastructure Projects Completed/Pending 3.Benefits of a Balanced Program 4.Green Infrastructure Projects Completed/Pending 5.Education and Outreach 6.Program Schedule 1.Fourth Stipulation to the ACJ : “Save the Rain” 2.Gray Infrastructure Projects Completed/Pending 3.Benefits of a Balanced Program 4.Green Infrastructure Projects Completed/Pending 5.Education and Outreach 6.Program Schedule

1/21/11 3 Fourth Stipulation to the ACJ Agreed to by all parties (State, ASLF, County) Authorized use of Gray and Green infrastructure Requires Storage Facilities in place of RTFs Includes time extension for Construction and Metro phosphorus effluent limit Balanced program provides additional water quality and community benefits

1/21/11 4 Save the Rain Program: Regulatory Goals Capture and Treat 95% of the Annual CSO Volume via Gray & Green Infrastructure Achieve water quality standards in tributaries and lake Regulatory Goals Capture and Treat 95% of the Annual CSO Volume via Gray & Green Infrastructure Achieve water quality standards in tributaries and lake Community Impacts/Goals Improve quality of life Promote Sustainability Ensure cost effectiveness in compliance with ACJ milestones Community Impacts/Goals Improve quality of life Promote Sustainability Ensure cost effectiveness in compliance with ACJ milestones Major Milestones 89.5% capture/elimination by 12/31/ % capture/elimination by 12/31/2018 Major Milestones 89.5% capture/elimination by 12/31/ % capture/elimination by 12/31/2018

1/21/11 5 Gray Projects Completed to Date Gray Projects Completed to Date Total Investment: $367 million 1.Aeration System Upgrade 2.Odor Control - residual handling and clarifiers 3.Chemical Storage Building and Feed System 4.Digester and Lagoon Improvements 5.Phase II Plant Improvements 6.Ammonia Removal Pilot 7.Phosphorus Removal Pilot – Phase I 8.Digital System Upgrade 9.Ammonia Removal – BAF 10. Phosphorus Removal – HRFS 11.CSO Toxicity Evaluation Report 12.Erie Boulevard Storage System Upgrade 13.Franklin St. FCF 14.Harbor Brook FCF 15.Hiawatha RTF 16.Kirkpatrick St. Pump Station Upgrade 17.Maltbie St. FCF 18.Midland Phase I Pipeline 19.Newell St. Pilot Disinfection 20.Onondaga Creek FCF - Boat 1.Aeration System Upgrade 2.Odor Control - residual handling and clarifiers 3.Chemical Storage Building and Feed System 4.Digester and Lagoon Improvements 5.Phase II Plant Improvements 6.Ammonia Removal Pilot 7.Phosphorus Removal Pilot – Phase I 8.Digital System Upgrade 9.Ammonia Removal – BAF 10. Phosphorus Removal – HRFS 11.CSO Toxicity Evaluation Report 12.Erie Boulevard Storage System Upgrade 13.Franklin St. FCF 14.Harbor Brook FCF 15.Hiawatha RTF 16.Kirkpatrick St. Pump Station Upgrade 17.Maltbie St. FCF 18.Midland Phase I Pipeline 19.Newell St. Pilot Disinfection 20.Onondaga Creek FCF - Boat 21.Siphon Rehabilitation 22.Teall Brook FCF 23.West St. Sewer Separation (CSOs 057, 058, 059) 24.Water St. Sewer Separation (CSO 024) 25.Brighton Sewer Separation (CSOs 053, 054) 26.Ammonia Source Trackdown Program 27.Tallman/Onondaga Sewer Separation (CSOs 038, 040, 046a and 046b) 28.Midland Phase II (includes Regional Storage and Treatment Facility plus 1,000 ft. pipeline) 29.Phosphorus Removal Pilot – Phase II 30.Biosolids Handling (mechanical thickeners) Improvements – Metro 31.South Ave./Bissell St. Sewer Separation (CSOs 047 and 048) 32.Sewer Separation 050 – Parkway/Rockland 33.Clinton Conveyances Phase 1 – pipeline outside the Trolley Lot & Armory Square 34.Clinton Conveyances Phase 2A – pipeline behind the MOST under RR 35.Sewer Separation 051 – Colvin Avenue 21.Siphon Rehabilitation 22.Teall Brook FCF 23.West St. Sewer Separation (CSOs 057, 058, 059) 24.Water St. Sewer Separation (CSO 024) 25.Brighton Sewer Separation (CSOs 053, 054) 26.Ammonia Source Trackdown Program 27.Tallman/Onondaga Sewer Separation (CSOs 038, 040, 046a and 046b) 28.Midland Phase II (includes Regional Storage and Treatment Facility plus 1,000 ft. pipeline) 29.Phosphorus Removal Pilot – Phase II 30.Biosolids Handling (mechanical thickeners) Improvements – Metro 31.South Ave./Bissell St. Sewer Separation (CSOs 047 and 048) 32.Sewer Separation 050 – Parkway/Rockland 33.Clinton Conveyances Phase 1 – pipeline outside the Trolley Lot & Armory Square 34.Clinton Conveyances Phase 2A – pipeline behind the MOST under RR 35.Sewer Separation 051 – Colvin Avenue

1/21/11 6 Gray Infrastructure Program Summary Gray Projects Harbor Brook Interceptor (ARRA) Midland Conveyance (CSO 044) Clinton Storage Facility Harbor Brook Storage Facility and Conveyances Erie Boulevard Storage System (EBSS) Gate Chamber #3 Improvement Sewer separation projects Facilities Planning Floatable Control Remaining CSO Facilities Plan Gray Projects Harbor Brook Interceptor (ARRA) Midland Conveyance (CSO 044) Clinton Storage Facility Harbor Brook Storage Facility and Conveyances Erie Boulevard Storage System (EBSS) Gate Chamber #3 Improvement Sewer separation projects Facilities Planning Floatable Control Remaining CSO Facilities Plan

1/21/ % annual CSO volume capture 247 million gallons Multiple Projects Throughout Sewersheds Compliments Gray Program Total Gray + Green volume capture: 85.2% by % by % by % by 2018 Extensive monitoring & reporting required 6.3% annual CSO volume capture 247 million gallons Multiple Projects Throughout Sewersheds Compliments Gray Program Total Gray + Green volume capture: 85.2% by % by % by % by 2018 Extensive monitoring & reporting required Green Infrastructure Program Summary Green Street Concept Drawing Edmonston, MD – Completed 2009

1/21/11 8 Green Infrastructure Technologies Impervious Area TypeGreen Infrastructure Technologies Flat Roof BuildingsVegetated Roof Parking Areas & SidewalksPorous Pavements, Bioretention RoadwaysGreen Streets (Bioretention, Street Trees) Residential Rooftops Downspout Disconnection Rain Barrels & Cisterns Rain Gardens County Facilities & SchoolsCombination of the Above Technologies

1/21/11 9 Onondaga County Civic Strip Onondaga County Civic Strip Greening County Facilities Utilizing Multiple Green Infrastructure Technologies

1/21/11 10 Advantages of Revised Program Balanced approach: Gray & Green Improved water quality for tributaries and lake Gray: Fixed capture benefit Depreciates over time Green: Appreciates over time Ancillary environmental and community benefits Onondaga County at the forefront of GI Movement Balanced approach: Gray & Green Improved water quality for tributaries and lake Gray: Fixed capture benefit Depreciates over time Green: Appreciates over time Ancillary environmental and community benefits Onondaga County at the forefront of GI Movement Philadelphia, PA Portland, OR Cincinnati, OH Milwaukee, WI Chicago, IL Kansas City, MO Syracuse, NY New York, NY Cities To Watch:

1/21/11 11 Green Projects Completed/Underway 1.Parking Lot #21 (former “Farmer’s Market Lot”) 2.Pearl Street Parking Lot 3.Parking Lot #3 4.Creekwalk (Jefferson St. to Fayette St) 5.Rosamond Gifford Zoo - Primate Exhibit and Courtyard 6.Rosamond Gifford Zoo - Elephant Building and Grounds 7.Townsend Parking Lot B 8.Townsend Median Reconstruction 9.Hazard Branch Library Green Roof 10.Urban Forestry Grant / Tree Planting Projects 11.Rain Barrel Program Installations 12.Green Improvement Fund Projects (20+ applications to date): 1.Jefferson Clinton Commons 2.Dunbar Associates 3.King & King Architects 4.St. Lucy’s Church 5.Lincoln Supply …and more… 1.Parking Lot #21 (former “Farmer’s Market Lot”) 2.Pearl Street Parking Lot 3.Parking Lot #3 4.Creekwalk (Jefferson St. to Fayette St) 5.Rosamond Gifford Zoo - Primate Exhibit and Courtyard 6.Rosamond Gifford Zoo - Elephant Building and Grounds 7.Townsend Parking Lot B 8.Townsend Median Reconstruction 9.Hazard Branch Library Green Roof 10.Urban Forestry Grant / Tree Planting Projects 11.Rain Barrel Program Installations 12.Green Improvement Fund Projects (20+ applications to date): 1.Jefferson Clinton Commons 2.Dunbar Associates 3.King & King Architects 4.St. Lucy’s Church 5.Lincoln Supply …and more… Commercial Green Street, Harrison Street (OnCenter)

1/21/11 12 Parking Lot #21 (Formerly “Farmer’s Market Lot”) Before After

1/21/11 13 Pearl Street Parking Lot

1/21/11 14 Warren Street Parking Lot #3 James Street Erie Boulevard Warren Street James Street Erie Boulevard Porous Concrete Captures over 700,000 gallons of stormwater annually

1/21/11 15 Rosamond Gifford Zoo Primate Exhibit and Courtyard Rain Garden along Primate Exhibit Porous Pavement in Courtyard Rain Barrels and Cisterns to harvest runoff from rooftops

1/21/11 16 Rosamond Gifford Zoo Elephant Exhibit (summer 2011) 6,000 sq.ft. Green Roof 6,000 sq.ft. Green Roof Enhanced Stormwater Management Enhanced Stormwater Management

1/21/11 17 Green Roof at Hazard Branch Library: Roof Membrane 2010; Green Planting, Spring 2011 Green Roof at SUNY ESF

1/21/11 18 Enhanced Street Trees

1/21/11 19 Rain Barrel Program for Residences in the CSO 004 Sewershed Grant Funded (Green Innovations Grant Program)

1/21/11 20 Green Improvement Fund (GIF) 3 million dollar pilot program Storm water management on private property is vital to success of green infrastructure program Grant funding for targeted sewer sheds in the City of Syracuse (Midland, Harbor Brook, Clinton) GIF Program Committee created to review funding opportunities for potential projects Applications are reviewed by Program Committee for final recommendation on funding level Over $1 Million dollars currently allocated under program Program developed to provide financial incentives to private and 501 ( c ) 3 property owners for the implementation of green infrastructure. Program Highlights 30 Applications submitted to-date 7 completed projects in 2010: ▫King & King Architects ▫Dunbar Association ▫Near Westside Initiative (2) ▫St. Lucy’s Church ▫Jefferson Clinton Commons ▫Hotel Skyler Over 15 Projects slated for 2011 Program Highlights 30 Applications submitted to-date 7 completed projects in 2010: ▫King & King Architects ▫Dunbar Association ▫Near Westside Initiative (2) ▫St. Lucy’s Church ▫Jefferson Clinton Commons ▫Hotel Skyler Over 15 Projects slated for 2011

1/21/11 21 Treatment Wetland and Restoration Project CSO 018 Constructed Wetland Harbor Brook CSO 018 Green Infrastructure 2011 Signature Projects

1/21/11 22 OnCenter Convention Center Green Roof Green Infrastructure 2011 Signature Projects

1/21/11 23 Water Reuse at OnCenter War Memorial Green Infrastructure 2011 Signature Projects

1/21/11 24 Benefits of Save the Rain Strategy Fewer Construction Impacts Higher Level of Public Acceptance More Sustainable Lower Life Cycle Cost Energy Savings Avoided Operations & Maintenance Lower Staffing Needs Fewer Construction Impacts Higher Level of Public Acceptance More Sustainable Lower Life Cycle Cost Energy Savings Avoided Operations & Maintenance Lower Staffing Needs

1/21/11 25 Gray/Green Project Schedule 2011: Complete 50 Green Projects Green OnCenter Wetland Harbor Brook War Memorial Water Reuse Green Streets Green Improvement Fund 2018: Achieve Compliance with ACJ 2011: Complete 50 Green Projects Green OnCenter Wetland Harbor Brook War Memorial Water Reuse Green Streets Green Improvement Fund 2018: Achieve Compliance with ACJ CompletionProject 12/31/2011Harbor Brook Interceptor 12/31/2011Midland CSO /31/2013Clinton Storage 12/31/2013Harbor Brook Storage 12/31/2018Sewer Separation

1/21/11 26 Education & Outreach Partners: Environmental Finance Center SUNY ESF Onondaga Environmental Institute

Thank You! Questions? Please Visit: