FRANKLIN TOWNSHIP MUNICIPAL SANITARY AUTHORITY F.T.M.S.A 2011.

Slides:



Advertisements
Similar presentations
JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Advertisements

Sewage Treatment.
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
Tennessee Solid Waste Program- Background The solid waste program within the DSWM regulates landfills and waste processing facilities in Tennessee. Solid.
Leswin D’cunha CH2M HILL Introduction to Wastewater Engineering Introduction to Engineering/Chabot College November 29, 2012.
Wastewater Treatment. Municipal WW Management Systems Sources of Wastewater Processing at the Source Wastewater Collection Transmission and Pumping Treatment.
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
INFORMATION on RATE increase On May 6, 2008, the Clark County Water Reclamation District Board of Trustees approved a rate increase at a public hearing.
WASTEWATER ENGINEERING
City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
1 CITY OF MONROE WASTEWATER DEPARTMENT BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities March 27, 2010.
The Quality Company - Worldwide SOUTH WEST WASTE MINIMISATION GROUP 3 RD JUNE 2009.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Capital Improvement Program (CIP) Overview Nick Kanetis, P.E. June 14, 2013.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates October 14, 2014 West Point Wastewater Treatment Plant, Seattle.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
The City of North Bend Sanitary Sewer System
Domestic Waste Water Treatment
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
Wastewater Treatment Plant Overview Adapted from May 2009 presentation UIUC Researchers: Poust, Somers, Poole.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Wastewater Treatment. Municipal WW Management Systems Sources of Wastewater Processing at the Source Wastewater Collection Transmission and Pumping.
Fairview Township, York County May 28, 2015
Wastewater generation
Wastewater Treatment CE 326 Principles of Environmental Engineering Prof. Tim Ellis Spring 2008.
MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 FISCAL YEAR BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
Water Research Foundation Workshop: Benchmarking April 23, 2015.
Co-Generation: Today’s Reality Larry McFall Plant Operations Manager Rock River Water Reclamation District Rockford, IL
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority.
SEWAGE TREATMENT.  Sewage is the mainly liquid waste containing some solids produced by humans, typically consisting of washing water, urine, feces,
Water Treatment Chapter 11. Sewage Treatment Rationale More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement.
Waste Water Treatment Plant. HOW DO TREATMENT PLANTS PROTECT OUR WATER? Wastewater treatment plants: Remove solids, everything from rags and plastics.
Sewage Treatment.
Page 1 Town of Williamston Water Rates. Page 2 Page 3 Major New Costs Incurred Due to MCRWASA Plant Coming On Line Extra staff time: $10,000 (estimated)
The Schererville Wastewater Treatment Plant is located in Northwest Indiana and serves the wastewater needs of a population base of approximately 45,000.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
1 Wastewater Treatment Processes Jae K. Park, Professor University of Wisconsin-Madison.
Water & Wastewater ITT Water & Wastewater Ralf Hansson, Global Projects April, 2011.
May 18, 2004 City Bond Election. MAY 2004 BOND ELECTION General Election May 18, 2004 Elections City Mayoral Election City Council Election City Bond.
PRESENTSITS Sanitary Wastewater Concentrator. A Shortcut to Reusable Clean Water From Sanitary Wastewater!
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
PROGRESSIVE WATER ENGINEERING PVT. LTD COMPLETE SOLUTION PROVIDER FOR WATER & WASTEWATER TREATMENT ENGINEERING.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2014 / 15 Fourth Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to operation of wastewater systems.
Conventional Sewage Treatment Plants:
CTC 450 Review WW Sludge Processes.
Schererville WasteWater Treatment Plant
PREVENTING AND REDUCING SURFACE WATER POLLUTION
Ongoing Odor Monitoring & Mitigation
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Schererville WasteWater Treatment Plant
Non-Residential Customer Non- Residential - Capacity Evaluation Borough of Conshohocken Authority Customer Informational Meeting June 20, East.
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Presentation transcript:

FRANKLIN TOWNSHIP MUNICIPAL SANITARY AUTHORITY F.T.M.S.A 2011

FTMSA Established in December 1967 by Franklin Township Supervisors Treatment facility initial operation commenced May 1970 Franklin Township becomes Municipality of Murrysville in 1978 Facility doubled capacity in 1984, upgraded to advanced secondary treatment in 1992 and added an additional sludge process in 2005

FTMSA Regulate all sanitary sewer service within its service area including all of Murrysville Efficiently operate the sanitary sewage treatment facility located in Murrysville Provide for the efficient cost effective transportation and treatment of sewage generated in its service area Ensure compliance with local, state, and federal regulations PURPOSE

FTMSA Mark A. Adamchik> ……… Chairman James S. Hamilton. … Vice-Chairman Robert Klingensmith ……… Secretary William J. Kagarise, Jr. …………… Treasurer Allan J. Sarver …… Asst. Sect./Treas. BOARD OF DIRECTORS Appointed by Murrysville Council to five year terms

FTMSA Manager ………………….James C. Brucker Assistant Manager Kevin Kaplan Plant Superintendent ……..Gene Greco Solicitor …………………..Donald J. Snyder, Jr Engineer ………………Hatch, Mott, MacDonald Auditor ……………………Sarp & Co. Bond Counsel …………….Victor K. Lynch Trustee ……………….... M&T Bank Management and Advisory Staff

FTMSA Established in 1968, the Authority’s sanitary sewer conveyance and collection system consists of approximately miles of sewer lines, 5 sewage regulators, 7 pump stations, and miles of collector in the Municipality of Murrysville. The Authority is also responsible for the maintenance of 23.1 miles of collector sewer in Delmont, 3.4 miles of collector sewer in Monroeville, 23.5 miles of collector sewer and 3 pump stations in Penn Twp., 19.0 miles of collector sewer and 3 pump stations in Salem Twp., and 5 miles of collector sewers in Export Borough.

FTMSA Main ……………..…17,300,000 gallons per day Lyons Run …….….….1,440,000 gallons per day Bel-Aire ……….………468,000 gallons per day Sloan ………….……….454,000 gallons per day Meadowbrook …………115,000 gallons per day Murrysville Hgts ………115,000 gallons per day Oak Ridge ………………72,000 gallons per day Pumping Stations Municipality of Murrysville

FTMSA Cloverleaf …….482,000 gallons per day Cramer ……..…259,000 gallons per day Oakford ……….101,000 gallons per day Pumping Stations Salem Township

FTMSA Walton Estates……….288,000 gallons per day Blackthorne Estates …252,000 gallons per day Brookside Acres ………21,600 gallons per day Pumping Stations Penn Township

FTMSA Collection of sewage material accounts for $3.32 of monthly service fee

FTMSA The Authority’s treatment facility on Meadowbrook Road is an aerobic biological treatment facility with grit removal, primary clarification, trickling filters, secondary clarification, nitrification towers, shallow bed sand filtration units, ultraviolet disinfection, sludge thickening, anaerobic biological sludge stabilization, sludge dewatering, and methane gas utilization facilities. The permitted hydraulic capacity of the facility is 4.90 million gallons per day and daily operations average approximately 3.41 million gallons.

FTMSA Municipality of Murrysville $ $ Delmont Borough $ $ Salem Township $ $ Export Borough $ $ Penn Township $ $ Municipality of Murrysville $ 4.73 $ 4.19 (served by Plum Borough) Customers with garbage disposers incur an additional charge of $1.83 per month Monthly Fees for Residential Customers

FTMSA During its most recent operational year, approximately 13,278 feet of additional sewer lines were constructed in the following areas: Municipality of Murrysville ----Shag Bark Grove, Murrysville Community Park and Bianca Rose Plan.

FTMSA Cost of Services Transportation & Treatment 88% Collection 12%

FTMSA Initial Operation - May 1970 Expanded capacity and upgrade to advanced secondary treatment – 1992 Capacity - 4,900,000 gallons per day

FTMSA Transportation and Treatment account for $24.95 of the monthly service fee

FTMSA Where the money comes from

FTMSA Refinanced Series of 2004 and 2005 Bond Issues. Completed replacement VFD’s and other work at Main pump station Started a new program of inspecting sewer laterals prior to the sale of real estate in Murrysville. Added two new employees for above sewer lateral inspections. Major Action Items in 2010

FTMSA Providing innovative and cost effective waste treatment solutions for our residential, municipal, and commercial customers.