OPSM 301 Operations Management

Slides:



Advertisements
Similar presentations
Auto-Moto Financial Services- The Old Process
Advertisements

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Process Analysis Operations.
Process Flow Analysis The Little’s Law The main source for preparing these slides is Managing Business Process Flow Anupindi, Chopra, Deshmoukh, Van.
Three Key Process Measures: Flow Rate
OPSM 301 Operations Management
OPSM 301: Operations Management Session 12: Service processes and flow variability Koç University Graduate School of Business MBA Program Zeynep Aksin.
3. 7 MBPF. Orange Juice Inc. produces and markets fruit juice
Review before Midterm 1. Announcements Bring calculator, pencil, eraser (these cannot be shared) No open cell phones allowed. Last names Akcay-Kelder.
4 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Analysis 4.
MBA 8452 Systems and Operations Management
OPSM 301 Operations Management
Healthcare Operations Management © 2008 Health Administration Press. All rights reserved. 1.
1 4. Flow-Time Analysis Inventory adversely affects all competing edges (P/Q/V/D)  Has cost  Physical carrying costs  Financial costs  Causes obsolescence.
Chapter 4 Process design Shenval. Alamy.
Chapter 22 Simulation with Process Model to accompany Operations Research: Applications and Algorithms 4th edition by Wayne L. Winston Copyright (c) 2004.
OM&PM/Class 3b1 1Operations Strategy 2Process Analysis –Class 2a+2b: Process Flow Analysis –Class 3a: Applications in Manufacturing 3Lean Operations –Class.
1 Process Mapping BA 339 Mellie Pullman. 2 Objectives Service Process Differences Little’s Law Process Analysis & Mapping.
Process Analysis and Applications Module
OPNS 430- Savaskan 1 Lean Operations (JIT) Module House Building Game The transition to Lean Ops The Paradigm of Lean Operations: The ideal Basic philosophy.
Managing Process Flows
1 3. Process Flow Measures Process Flow Analysis-Basics 1 Ardavan Asef-Vaziri June/2011 Five Elements of the Process View Inputs Outputs Goods Services.
Chapter 6, Process-Flow Analysis
Irwin/McGraw-Hill 1 Process Analysis Terms Process: Is any part of an organization that takes inputs and transforms them into outputs. Cycle Time: Is the.
OPSM 501: Operations Management Week 3: Process measurement Little’s Law The House Building Game Koç University Graduate School of Business MBA Program.
Chapter 3 An Introduction to Operations Management
BIS 494: Topics in Information Systems 1 Managing Process Flows Chapter 5 Business Process Modeling, Simulation and Design.
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
Problem 3.4 MBPF A hospital emergency room (ER) is currently organized so that all patients register through an initial check-in process. At his or her.
1 3. Process Flow Measures Assignment, Problem 1 Solution 1. Bank XYZ receives 20 loan requests per hour on average. Each loan request goes through an.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 6 Process Analysis.
1 © The McGraw-Hill Companies, Inc., 2004 Introduction (from Chase) Process Analysis.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
OPSM 301: Operations Management
The Essence of Process Flow Process Measures
Figure 2.1: Example of a procedure in an interventional radiology unit
The Essence of Process Flow Process Measures
OPSM 501: Operations Management Session 3&4: Strategic Fit Process selection Koç University Graduate School of Business MBA Program Zeynep Aksin
Operations Management Module 4 : Process Analysis S.Balachandran 2007 December 2007.
3.5 MBPF. A triage system has been proposed for the ER described in Exercise 3.4. As mentioned earlier, 55 patients per hour arrive at the ER. Under the.
Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted by Gerard.
OPSM 501: Operations Management Week 4: Process analysis Kristen’s Cookie Koç University Graduate School of Business MBA Program Zeynep Aksin
1 Ardavan Asef-Vaziri Oct. 2011Operations Management: Waiting Lines 1 80 patients per hour arrive at a hospital emergency room (ER). All patients first.
OPSM 301 Operations Management Class 2: Business process flows: Measurement Koç University Zeynep Aksin
1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.
Irwin/McGraw-Hill  The McGraw-Hill Companies, Inc Process-Flow Analysis Chapter 7.
OPSM 405 Service Operations Management
Process Analysis CHAPTER 5. Learning Objectives 1. Recognize three basic types of processes: a serial flow process, parallel processes (such as what happens.
Operations Management For Competitive Advantage 1 Process Analysis Operations Management For Competitive Advantage Chapter 4.
1 3. Process Flow Measures A hospital emergency room (ER) is currently organized so that all patients register through an initial check-in process. At.
Process Analysis I Operations -- Prof. Juran.
4. Flow-Time Analysis Flow Time 1-Introduction Based on the book: Managing Business Process Flows.
Operations Fall 2015 Bruce Duggan Providence University College.
Flowcharting George Kesselaar. Agenda What is Flowcharting? How do we do it? –Symbols –Example (steps) –Rules of Thumb Exercise (Amazon / Fedex) Groups.
1 3. Process Flow Measures 1. Coffee Shop You enter a Starbucks coffee shop. You have experienced that in this time of day the entrance door opens two.
Key Learnings: Little’s Law
Your own footer Your Logo.
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
Example: A Hospital Emergency Room
Process-Flow Analysis
Process Design and Analysis
Process Analysis.
Every minutes one customer comes in and one customer leaves.
Chapter 5 Process Analysis.
Manufacturing Planning
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Assignment Capacity The recorded solution to the first problem is available at
Problem
Chapter 5 Process Analysis.
Presentation transcript:

OPSM 301 Operations Management Koç University OPSM 301 Operations Management Class 5: Business process flows House Building Game Zeynep Aksin zaksin@ku.edu.tr

Example: Hospital Emergency Room A hospital emergency room is currently organized so that all patients register through an initial check-in process. At his or her turn, each patient is seen by a doctor and then exits the process, either with a prescription or with admission to the hospital. Currently, 55 people per hour arrive at the ER, 10% of who are admitted to the hospital. On average, 7 people are waiting to be registered and 34 are registered and waiting to see a doctor. The registration process takes, on average, 2 minutes per patient. Among patients who receive prescriptions, average time spent with a doctor is 5 minutes. Among those admitted to the hospital, average time is 30 minutes. On average, how long does a patient spend in the ER? On average, how many patients are being examined by doctors? On average, how many patients are there in the ER? Assume the process to be stable; that is, average inflow rate equals average outflow rate.

Example: Emergency Room Flow units?

Little’s Law = 0.127 hrs = 7.6 min T = I/R = 34/55 hr I = RT = 55*2/60 = 1.83 patients.

On average how long does a patient spend in the ER? Two types of flow units: Potential admits Simple prescriptions Potential admits flow time=7.6 + 2 + 37.1 + 30 = 76.7 minutes Simple prescriptions flow time= 7.6 + 2 + 37.1 + 5 = 51.7 minutes. Average T = 10% * 76.7 + 90%*51.7 = 54.2 minutes.

On average how many patients are being examined by doctors? Potential admits: R = 5.5 patients/hr, T = 30 min = 0.5 hr I = RT = 5.5/hr*0.5 hr = 2.75 patients Simple prescription: R = 49.5 patients/hr, T = 5 min = (5/60) hr I = RT = 49.5*(5/60) = 4.125 patients

On average how many patients are there in the ER? total inventory in ER = inventory in buffer 1 + inventory in registration + inventory in buffer 2 + inventory with doctors = 7 + 1.83 + 34 + 6.865 = 49.695 patients.

Flow rate/Throughput R Relating operational measures (flow time T, throughput R & inventory I) with Little’s Law Flow rate/Throughput R [units/hr] Inventory I [units] ... ... ... ... ... Flow Time T [hrs] Inventory = Throughput x Flow Time I = R x T Inventory Turns = 1/ T

Inventory Turns examples (source Cachon and Terwiesch)

Key learnings: Little’s Law Relates three leading performance measures based on process flows: throughput, inventory, flow time Applies to processes in steady state Important to First determine process boundaries for analysis Then identify appropriate flow unit for your analysis

From measurement to analysis So far we have considered Measuring process flows-R, T, I Relating these measures through Little’s Law: I=RxT Next: understand what drives each measure What drives flow time? What drives throughput rate? What drives inventory?

Process = network of activities performed by resources Process Architecture is defined and represented by a process flow chart: Process = network of activities performed by resources 1. Process Boundaries: input output 2. Flow unit: the unit of analysis 3. Network of Activities & Storage/Buffers activities with activity times routes: precedence relationships (solid lines) 4. Resources & Allocation 5. Information Structure & flow (dashed lines) ........................................................................................................................................................................................................................................ ........................................................................................................................................................................................................................................ ........................................................................................................................................................................................................................................

Flowchart Symbols Tasks or operations Decision Points Examples: Giving an admission ticket to a customer, installing an engine in a car, etc. Examples: How much change should be given to a customer, which wrench should be used, etc. Decision Points 4

Flowchart Symbols Storage areas or queues Examples: Lines of people or cars waiting for a service, parts waiting for assembly etc. Examples: Customers moving to a seat, mechanic getting a tool, etc. Flows of materials or customers 4

House Building Game-Introduction

Only need a pen or pencil. KEEP DESKS CLEAR! Only need a pen or pencil. Please keep desks and aisles clear of notebooks, PCs, backpacks etc. Please do not disturb materials!

HouseBuilding.com: Manufacturing Operations Production Control (color sheets, log sheets, scissors) Base Punch (scissors) Roof Base Form (scissors) Base Weld (stapler) Final Assembly (tape) Quality Control Customer

Production Control Operating Procedures Prepare a batch of 4 units. Cut each sheet (one at a time) into two: roof and base. Write the batch number on the roof and the base. All items in the same batch have the same number. The numbers have to match in assembly. Repeat 4 times, which yields one batch When 4 units (one batch) are complete, “release” the batch. Put the batch in your out-basket: it’s ready for pickup by the trucker. Record release time for each batch. Release one batch each minute.

Truckers Operating Procedures Truckers are responsible for transporting work in process inventory between production steps. You can carry only one batch of 4 roofs or 4 bases at a time. Not both! Production Control (color sheets, log sheets, scissors) Base Punch (scissors) Roof Base Form (scissors) (scissors) Base Weld (stapler) Final Assembly (tape) Quality Control Customer

Roof Operating Procedures Cut the roof along double lines, one at a time. Fold roof along dotted line at top. Think quality! Work in batches of 4 units. When a batch is ready, call the trucker and send to Final Assembly. Ask trucker for inputs when needed.

Base Cut Operating Procedures Cut the base along double lines, one at a time. Think quality! Work in batches of 4 units When a batch is ready, call the trucker and send to Base Form. Ask trucker for inputs when needed.

Base Form Operating Procedures Fold the lines on the base (4 folds). Work in batches of 4 units When a batch is ready, call the trucker to send them to Base Weld. Ask trucker for inputs when needed

Base Weld Operating Procedures Staple base on top and bottom about 0.5 cm from the edge. Work in batches of 4 units. When a batch is ready, call the trucker to send them to Final Assembly. Ask trucker for inputs when needed.

Final Assembly Operating Procedures Tape the roof to the base (2 tapes). Work in batches of 4 units. When a batch is ready, send them to QA. (No trucker required.) Ask trucker for inputs when needed.

Quality Assurance Operating Procedures Check each batch if they conform to quality standards! If the house conforms to quality standards, put it on the market. Once on the market no more rework! Customers can reject houses Quality Standards Batch numbers must match. Folds and cuts should be along appropriate lines. Folds should be crisp and cuts should be straight. Roof should be centered and door should be visible. Top of base should be flush with roof. Staples and tape should be centered and parallel to the ground. Not too much tape. About 1 cm Staples about 0.5 cm from edge.

House Game Overview Quality Standards Batch numbers must match. Folds and cuts should be along appropriate lines. Folds should be crisp and cuts should be straight. Roof should be centered and door should be visible. Top of base should be flush with roof. Staples and tape should be centered and parallel to the ground. Not too much tape. About 1 cm. Staples about 0.5 cm from edge. Production Control (color sheets, log sheets, scissors) Base Punch (scissors) Roof Base Form (scissors) (scissors) Base Weld (stapler) Final Assembly (tape) Quality Control Customer

HouseBuilding.com: Operational Performance Flow time T Input Ri Output Ro Inventory I Sales R Quality Q = R/ Ro Team (color) House # 1 To - Ti = T House # 16 To - Ti = T