Chapter 13 Blasting Rock Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.

Slides:



Advertisements
Similar presentations
Chapter 13 Control Structures. Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display Control Structures Conditional.
Advertisements

Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter Four Trusses.
Better together... we deliver SASOL CHEMICALS BASE CHEMICALS (EXPLOSIVES) MOSH - "Day of Learning" 2014.
VOLUME BY COUNTING CUBES Objective To understand the concept of volume in terms of counting cubes.
Rock Excavation.
Wall Form Design Example (Continued)
Blasting safely with proper techniques
2-10 Change Expressed as a Percent
Magnetically Coupled Circuits
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 12 Drilling Rock and Earth.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 2 Image Slides.
Chapter 8 Traffic-Analysis Techniques. Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. 8-1.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 20 Air Compressors and Pumps.
Stiffness Ratio Stiffness Ratio = B H / B where B H is Bench Height B is the Burden Target Stiffness Ratios 3 to 4 is normal range > 4 does not improve.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 6 Machine Equipment Power Requirements.
Find the two square roots of each number.
Warm Up Problem of the Day Lesson Presentation Lesson Quizzes.
Shot Design Example ©Dr. B. C. Paul 2000 Note – The example portrayed in these slides is an illustration prepared by the author using knowledge that the.
Compaction and Stabilization Equipment
Planning for Earthwork Construction
First Step is Selection of Burden B = 0.67 * D e * (E/S gr ) 0.33 –D e is hole diameter in inches –S gr is the specific gravity of rock where water =
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 14 Aggregate Production.
Using Konya’s Method to Identify Blast Design Problems An overview of the Havablast 4 Spreadsheet.
Designing Basic Blasting Shots Part I ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Control of FINES DUST and. Introduction Dust is a general term : fine particles that are suspended in the atmosphere. Dust is formed when fine particles.
Designing Basic Blasting Shots Part II ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
BLASTING FOR REDUCED ROCK DAMAGE AND CONTROLLING STABILITY
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
Basic Blasting Patterns ©Dr. B. C. Paul 2000 Note – The concepts contained in these slides represent the author’s view of information commonly held among.
FLYROCK Flyrock is the propelling rock from the blast area. Leading cause of fatalities and equipment damage.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 7 Dozers.
Predicting Fragmentation ©Dr. B. C. Paul 2000 Note – This series of slides portrays the author’s summary of knowledge commonly held by people well studied.
4.4 Percent of Change Percent of change is the ratio When a value increases from its original amount, it is the percent of increase. When a value decreases.
Chapter 3: Solving Equations 3.7 Percent of Change.
4-6 Estimating Square Roots Warm Up Warm Up Lesson Presentation Lesson Presentation Problem of the Day Problem of the Day Lesson Quizzes Lesson Quizzes.
DASARI SURESH ASST. MANAGER (MINING)  What is fragmentation ?  Fragmentation is the process of breaking the solid in-situ rock mass into several smaller.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 7.
Chapter 13 Transportation Demand Analysis. Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display
3-6 Estimating Square Roots Warm Up Warm Up Lesson Presentation Lesson Presentation Problem of the Day Problem of the Day Lesson Quizzes Lesson Quizzes.
WEL COME. DRILLING AND BLASTING Index  Introduction of Drilling and its Necessity  Terminology use for drilling  Selection of drilling method  Selection.
Drilling Rock and Earth
Sec. 4-4: Percent of Change
Introduction to Algorithms Second Edition by
Chapter 10 Image Slides Title
PowerPoint Presentations
Copyright © The McGraw-Hill Companies, Inc
Warm Up Problem of the Day Lesson Presentation Lesson Quizzes.
CONSTRUCTION METHODS & TECHNOLOGY
Find the two square roots of each number.
Chapter 3 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Blasting safely with proper techniques
Chapter 3 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Chapter 8 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Chapter 2 Excel Fundamentals
Chapter R A Review of Basic Concepts and Skills
Introduction to Algorithms Second Edition by
Chapter 7 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Warm Up Problem of the Day Lesson Presentation Lesson Quizzes.
Assignment Pages: 10 – 12 (Day 1) Questions over Assignment? # 1 – 4
Introduction to Algorithms Second Edition by
Copyright © The McGraw-Hill Companies, Inc
Introduction to Algorithms Second Edition by
CHAPTER 6 SKELETAL SYSTEM
Introduction to Algorithms Second Edition by
SPECIALISED BLASTING By Mutale Chipoma- Explosives Engineer
Journey to the Cosmic Frontier
Journey to the Cosmic Frontier
Chapter 24 Image Slides* *See PowerPoint Lecture Outline for a complete ready-made presentation integrating art and lecture notes Copyright © The.
Chapter 3 Introduction to Physical Design of Transportation Facilities.
Presentation transcript:

Chapter 13 Blasting Rock Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.

BLASTING ROCK Practical Exercise Blast Design

PRACTICAL EXERCISE Design a delayed initiation blast (would like to shoot a minimum of 10 holes per delay). Base the plan on the following: Rock - limestone, in thin layers w/tight joints Bench height - 24 ft

PRACTICAL EXERCISE Explosive - bulk ANFO, SGe 0.8 dry holes, no liner required. Explosive - dynamite, SGe 1.4 Cartridge size: 2 to 3.5 inch diameter in ¼ in. increments, by 16 in. long.

PRACTICAL EXERCISE Drills can use 6 in. bits. Regulatory scale distance factor 55 Nearest structure is 1,400 ft away

STEP 1: BURDEN DISTANCE ?

Explosive density empirical formula for burden distance: STEP 1: BURDEN DISTANCE Explosive density empirical formula for burden distance: Equ. 13.1

STEP 1: BURDEN DISTANCE SGe ANFO = 0.8 SGr Limestone (Table 13.2)? De = ? try 6 in. the maximum

STEP 1: BURDEN DISTANCE SGr Limestone (2.4 - 2.9) Lets use an average number of 2.7

STEP 1: BURDEN DISTANCE B = 12.6 ft

STEP 2: BURDENcorrected Burden distance corrected for geological conditions (Table 13.3). Kd = 1.00, no information assume “other cases.” Ks = 1.10, thin layers w/tight joints

STEP 2: BURDENcorrected Burden distance corrected for geological conditions. Bcorrected = 13.8 ft

STEP 3: STIFFNESS RATIO Need a Stiffness Ratio of 3 or greater. Bench height = 24 ft Burden corrected = 13.8 ft

STEP 4: BURDEN ADJUSTED Want a Stiffness Ratio of 3 therefore:

STEP 4: BURDEN ADJUSTED Do not complicate the field work, try to use one foot or half foot increments.

STEP 4: BURDEN ADJUSTED Burden distance corrected for geological conditions.

STEP 5: EXPLOSIVE DIAMETER

STEP 5: EXPLOSIVE DIAMETER 3 1/2 in.

STEP 6: BLASTHOLE SIZE Use a 3 1/2 in. size bit, Bulk ANFO dry holes, no blasthole liner, explosive diameter and blasthole size are the same. Use a 3 1/2 in. size bit, therefore 3 1/2 in. borehole.

STEP 6: BLASTHOLE SIZE Bulk ANFO, explosive diameter and blasthole size are the same, i.e. there is no liner. EXPLOSIVE BORE HOLE

Explosive diameter and blasthole size are the same. ANFO

Worked with a wooden pole to prevent bridging. ANFO

STEP 7: STEMMING Stemming depth (T) = 5.6 use 6 ft

STEP 8: SUBDRILLING Subdrilling depth (J) = 2.4 use 2 ft

STEP 9: SPACING Spacing controlled by initiation timing and stiffness ratio. Delayed initiation: SR greater than 1 but less than 4 (Equ. 13.8)

STEP 9: SPACING L (bench height) = 24 ft. B (burden distance) = 8 ft. Spacing = 10 ft

STEP 9: SPACING 8.5 ft 11.5 ft Calculated spacing -15% +15% Spacing in the field should be within plus or minus 15% of the calculated value. Calculated spacing -15% +15% 8.5 ft 11.5 ft

STEP 9: SPACING Spacing = 9, 10, 11 ft? If this is an estimate for a bid it might be better to be conservative and use an 9 ft spacing. That would mean more holes and a higher drilling cost.

STEP 9: SPACING Spacing = 9, 10, 11 ft? If we are in the field drilling for the first shot we might try a 10 ft spacing. This would lower cost.

STEP 9: SPACING Pull the first shot and evaluate the results: fragmentation etc. If it is ok, use 11 ft, if it is not satisfactory reduce the spacing.

STEP 9: SPACING don’t forget -- SAFETY Throw rock

STEP 10: POWDER COLUMN Powder column length is the blasthole depth minus the stemming depth. Blasthole Depth = 26 ft Bench height (24 ft) + Subdrilling ( 2 ft) Powder column = 26 ft - 6 ft = 20 ft

STEP 10: POWDER COLUMN Powder column = 20 ft or 240 in. Dynamite cartridge size: 2 to 3.5 inch diameter in 1/4 in. increments, by 16 in. long. Dynamite: 16 in or 1.3 ft

STEP 10: POWDER COLUMN Powder column = 240 in. ANFO - 16” dynamite or 18.6 ft

STEP 11: LOAD DENSITY Have to prime the dynamite to fire the shot.

STEP 11: LOAD DENSITY 3 1/2 in. borehole Dynamite: Cartridge size: 2 to 3.5 inches in 1/4 in. increments. Use 3 in. diameter cartridges, will fit easily into the hole. ANFO: 3 1/2 in. diameter

STEP 11: LOAD DENSITY Dynamite Cartridge

STEP 11: LOAD DENSITY Dynamite: 3 in dia. SGe = 1.4 ANFO: 3 1/2 in dia. SGe = 0.8 Explosive Loading Density Table 13.5 Dynamite: 4.29 lb/ft ANFO: 3.34 lb/ft

STEP 12: AMOUNT of EXPLOSIVE

STEP 12: AMOUNT of EXPLOSIVE Amount of explosive (lb) = powder column (ft) X loading density (lb/ft) Dynamite: 1.3 ft X 4.29 lb/ft = 5.6 lb ANFO: 18.6 ft X 3.34 lb/ft = 62.1 lb Explosive per blasthole 67.7 lb

STEP 13: AMOUNT of ROCK Rock per blasthole: Amount of rock (cy) = pattern area (ft2) X depth to grade (ft) X 1/27 (ft3/cy) Rock per blasthole:

STEP 14: POWDER FACTOR Powder Factor (lb/cy) = Powder Factor:

STEP 15: VIBRATION Check vibration formula 13.12 Ds = 55 d = 1,400 Want to shoot 10 holes per delay. W = 10 X 67.7 lb or 677 lb

STEP 15: VIBRATION Ds = 55 A scaled distance value of 55 or greater is required for this location. 53.8  55 Therefore, can not shoot 10 holes at one time.

STEP 15: VIBRATION How many holes at one time.

STEP 15: VIBRATION Ds = 55

STEP 15: VIBRATION Therefore, can only shoot 9 holes at one time.

Shoot 9 holes at one time.

PRESPLITTING ROCK To limit overbreak, develop a presplitting blast plan, for the previous example.

STEP 1: EXPLOSIVE LOAD Equation 13.10 Explosive load = 0.4375 lb/ft

STEP 2: AMOUNT of EXPLOSIVE Explosive load = 0.4375 lb/ft Amount of explosive / hole = (24 ft X 0.4375 lb/ft) + (3 X 0.4375 lb) = 11.8 lb/hole

STEP 3: HOLE SPACING Hole spacing = 10 X 3 ½ in. = 35 inches

FIRE IN THE HOLE

FIRE IN THE HOLE

Time to load and haul.