MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.

Slides:



Advertisements
Similar presentations
M. J. Haigh Well Design Differentiators CO 2 Sequestration in Depleted Reservoirs SPE Presented at Offshore Europe 2009 Conference.
Advertisements

Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Coal Bed Methane (CBM) Permeability Testing WTN Network Meeting April , 2011 ExxonMobil Exploration / Well Testing Team.
Well Design PE 413 Introduction and API Standards of Casing
PETE 411 Well Drilling Lesson 17 Casing Design.
PETE 203 DRILLING ENGINEERING
9-Point Drilling Plan 9-Point Drilling Plan. Presentation Goals To Describe a Drilling Plan That… Is in compliance with Order #1. Is in compliance with.
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
Part 2.2 Well Control. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand well control.
Petroleum Engineering 406
Drilling Engineering – PE311 Circulating System
Innovations in drilling DAP 2015
ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 17 Flow Drilling Mudcap Drilling Snub Drilling Closed Systems Read: UDM Chapter pages
DRILLING ENGINEERING Well Control.
MPD Managed Pressure Drilling GF Landsbyen Outline What is MPD Why MPD Conventional drilling vs MPD.
Lesson 14 Jet Bit Nozzle Size Selection
Presented by: Alex Hageman ( Accelerated Production Services, Inc.) May 15 th, 2013 Multiple Stage Hydraulic Jet Pump Presented to ALRDC.
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
ATMATM PETE 406 UBD ATMATM ATMATMATMATM PETE Underbalanced Drilling, UBD Lesson 9 Benefits of Underbalanced Drilling UDM - Chapter 3.
PETE 203 DRILLING ENGINEERING
Petroleum Engineering 406
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
Petroleum Engineering 411 Well Drilling
Integrated Drilling and Logging Program Approach in HPHT Environment: Successful Drilling of Deepwater Oberan Field, Nigeria, ENI Deepest Well in Deep.
RIG PROCESSES  Drilling, Coring, Directional Drilling & Survey.  Tripping, Wash & Ream, Fishing.  E- Logging.  Casing & Cementing.  Perforating &Testing.
INNOVATIONS IN DRILLING DAP 2015 MAARTEN MIDDELBURG FEBRUARY 25, 2015 DELFT.
PETE 411 Well Drilling Lesson 23 Gas Cut Mud.
Introduction to Underbalanced Drilling Technology(M2)
Confidential to SMD JIP
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
Lesson 25 Well Control, cont’d
Lesson 30 Cementing - cont’d
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
Drilling operation to get subsurface data. Why subsurface drilling is needed? As we cant look into subsurface directly, drilling is done to bring the.
Downhole Pressure Monitors Halliburton Pressure Transmission Systems (PTS) have been in use at SYU since 1984 (Hondo) & 1993 (Harmony & Heritage) Have.
Dual Gradient Drilling Basic Technology Confidential to DGD JIP
25-26 August 1999Well Control Conference of the Americas Greater Kick Tolerance and Fewer Casing Strings Make Dual Gradient Drilling a Winner Schubert,
DRILLING.
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
Well Design PE 413.
1 Petroleum Engineering 406 Lesson 13 Shallow Water Flows.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Lesson 26 * Well Control * * Variable Geometry *
Dual Gradient Drilling Basic Technology
Petroleum Engineering 406 Lesson 4 Well Control. Read Well Control Manual –Chapter 9 Homework 2 Due Feb. 3, 1999.
Casing Design.
Operational Comparison Between the Gardes Energy Services Up- Stock And the Standard Whipstock Gardes Energy UP-STOCK.
Petroleum Engineering 406 Floating Drilling
IADC Application Category Category A – Managed Pressure Drilling (MPD) Drilling with returns to surface using equivalent mud weight that is maintained.
Underbalanced Perforating. èEarly tests by Exxon showed that flow patterns and perforation geometry prevent the cleaning out of an appreciable percentage.
6. Gas Kick Behavior Confidential to DGD JIP Slide 1 of 48 by Hans C. Juvkam-Wold Lesson 6 Gas Kick Behavior Dual Gradient Drilling Basic Technology.
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
ARTIFICIAL LIFT METHODS
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Petroleum Engineering 411 Well Drilling
Lecture 10 Production Engineering
Mud weight High enough to prevent influx from reservoir fluids High enough to ensure wellbore stability Too high mud weight can cause fracturing of the.
CASING.
Under Balance Drilling in Heera Field.
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Chapter 2: Casing Design Casing Selection
The SPE Foundation through member donations
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Scope / History Well 25/11-G-18 was drilled nov The well has 7” Bakerweld 140 Screens and swell packers. The well is producing gas from the “heal”
Design Factors Collapse Corrected
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Casing Design Workshop
Design Calculations Combination Strings
Presentation transcript:

MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing System for Friction Controlled Drilling

The Gardes Energy Services MPD System Provides: The down hole control of critical high-pressure, high-temperature wells while drilling using a combination of both standpipe and concentric annulus fluid injection to create frictional pressures on the return annulus and establish a desired equivalent circulating density (ECD) at depth to drill near balance, at balance or under balance in the formation. During connections, the established standpipe injection volume used while drilling is added to the normal annulus injection volume on the back side, so the ECD remains constant, thus eliminating the bottom hole pressure surges associated with connections and minimizing connection gas influx. This system overcomes the problems associated with shallow geotechnical hazards, well bore instability, lost circulation and narrow margins between formation pore pressure and fracture gradient.

High Temp., High Pressure MPD System with the patented dual fluid friction circulation. Increased Concentric Casing circulating rate creates instantaneous control of reservoir inflow without the need for surface pressures or modification of drilling fluid densities.

Managed pressure drilling can overcome a variety of problems including shallow geotechnical hazards, well bore instability, lost circulation, and narrow margins between formation pore pressure and fracture gradient.

ECD management by planning and monitoring a Managed Pressure window. Narrow ECD window between pore pressure and bore hole collapse that can be maintained with Managed Pressure Drilling and the Gardes Continuous Circulation dual string technology

ADVANTAGES OF GARDES ENERGY SERVICES MPD CONCENTRIC CASING CONTINOUS CIRCULATION SYSTEM Expands operating window between ECD and Frac Gradient. Reduces excessive cost of circulating out connection gas. Creates near constant and controllable ECD pressures. Added well control during trips. Continuous circulation during connections. Can be run with all down hole deployment casing valves. Contains all working pressures below rotary table not on rig floor. System has an attached whip stock (up stock) for multi lateral deviation or re entry. System can be run in open or cased holes System can be stripped out of hole to keep UB environment at TD. System can be run in straight, deviated or horizontal configured well bores. System is designed for all MPD situations, Under balanced or tight ECD environments.

The purpose of MPD is to both ascertain the down hole pressure environment limits and manage the annular hydraulic pressure profile to fit within that window.

9500 9000 8500 Frac Gradient 8000 7500 7000 Pore Pressure 6500 Bore Hole Collapse 6000 5500

The Gardes Energy Services MPD System Includes Neo Tech 7 Flow Modeling: Through Pre planned flow modeling, Down Hole Pressure while drilling tools (PWD) and Real Time on location Flow Modeling we are able to manage the Annular Hydraulic pressure profile to fit within any window.

Bottom Hole Circulating Pressure (BHCP) vs. Liquid Injection Rates Bottom Hole Circulating Pressure (BHCP) vs. Liquid Injection Rates. Actual Case History Showing BHCP Control with Minimal Pressure Oscillations 4750 4625 4500 4375 4250 4125 4000 3875 3750 3625 3500 3375 3250 Vs Inj 0 25 50 75 100 125 150 175 200 2250 250

The Gardes Energy Services MPD 4 Phase Surface System Real Time: _______________________________________________

MPD may be accomplished by many means including combinations of backpressure, variable fluid density, fluid rheology, circulating friction, and hole geometry

Wellhead for Continuous Circulation BOP Secondary Seal Test Port VR Threads Surface Casing Intermediate Casing

Wellhead for Continuous Circulation Run in Lockscrews BOP Running Tool with Acme Thread Carrier String Hanger Micro-Annulus Carrier String Test to Working Pressure Surface Casing Intermediate Casing Production Casing

Wellhead for Continuous Circulation Injection Down Drill Pipe Drill Pipe Fluid Returns Co-mingle Injection Into Micro Annulus

Wellhead for Continuous Circulation Injection Down Drill Pipe Drill Pipe Fluid Returns Co-mingle Injection Into Micro Annulus

Click for each Operation Drilling Operation 1. Drill Surface Hole 2. Set Surface Casing Protective and Tieback casing designed for production 3. Drill Protective Hole 4. Set Protective Casing 5. Drill Liner Hole 6. Set liner 7. Run Tieback with Down Hole Deployment Valve with Ports above the DHDV Ports 8. Rig up RBOP, Programmable Choke, Surface Equipment, and test. DHDV 9. Drill to Zone of Interest 10. Run Carrier String with DHDV with or without Upstock Not necessary to drill out from the liner or the carrier string to go underbalanced. 11. Drill out 12. Run Drill String with BHP Tools and Float Subs 13. Go underbalance with mud weight light enough to be 600 to 800 psi below BHP but with annular friction to maintain surface pressure less than 2,000 psi. Inject down the backside and inside of the tieback string taking returns inside of the carrier string. DHDV Carrier String

Robert Gardes phone # 337/234-6544 email: rgardes@gardesenergy.com