Episode 3 1 Episode 3 EX-COM D2.5-01 Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.

Slides:



Advertisements
Similar presentations
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Advertisements

1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
European ATFM From current operation towards the future Patrick Ky
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Network Management Operational Performance Enhancements Razvan BUCUROIU.
Episode 3 / CAATS II joint dissemination event Gaming Techniques Episode 3 - CAATS II Final Dissemination Event Patricia López Aena Episode 3 Brussels,
The European Organisation for the Safety of Air Navigation Network Management functions Evolutions in SESAR WP7 and WP13 Moving Towards an Integrated ASM/ATFCM/ATS.
Mission Trajectory Step 1 From planning to deployment.
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
Mediterranean Free Flight ASAS Separation and Spacing Presented by Andy Barff – Project Leader MFF Real-time Simulations ASAS-TN, Malmö
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
In need of a model for complexity assessment of highly automated human machine systems Fredrik Barchéus, Pernilla Ulfvengren, Johan Rignér.
Traffic Management and FUA integration
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Episode 3 Prototyping Sessions En-route and TMA Episode 3 - CAATS II Final Dissemination Event Bill Booth EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Gaming and Modelling Pablo Sánchez-Escalonilla AENA Episode 3 Brussels,
SESAR and ASAS Opportunity
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Fast-Time Simulation and Prototyping Episode 3 - CAATS II Final Dissemination.
Applications from packages I to III
1 DLR/EEC Total Airport Management Christoph Meier & Peter Eriksen European Organisation for the Safety of Air Navigation.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
Study Continuous Climb Operations
The SESAR Target Concept of Operations ASAS Related Aspects
David Bowen Head of ATM Operations and Systems
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 1 Scene setting for Episode 3 Philippe Leplae EUROCONTROL Episode 3.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
1 ATM System Wide Modeling Capabilities in Fast-Time Simulation 1 st Annual Workshop – NAS-Wide Simulation in Support of NextGen Dec. 10th – George Mason.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Presentation of the TITAN project for the stakeholders.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
Episode 3 E3-WP0-MWPM PPT-V th ExCom Slides 1 Episode 3 - Ex-Com Final Report Tools & Validation Dr. Ralph Leemüller R&D Division - DFS.
2 nd Workshop, April 2006 ASAS in Tomorrows Airspace Pierre Gayraud, THALES Bob Graham, EEC Tony Henley, BAe Systems Dr Anthony Smoker, IFATCA ASAS-TN2.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
1 Controller feedback from the CoSpace / NUP II TMA experiment ASAS-TN, April 2004, Toulouse Liz Jordan, NATS, U.K. Gatwick approach controller.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 ASAS-SEP Applications Airborne Implementation Overall Architectural Considerations.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
Collaborative Decision Making (CDM) Saulo Da Silva
Welcome to the SESAR SWIM Master Class 2013
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
The Role of Air Traffic Control in A CDM ENVIRONMENT
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
SIP/2012/ASBU/Nairobi-WP/19
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
Ground System implication for ASAS implementation
Karim Zeghal EUROCONTROL Experimental Centre
Trajectory-Based Operations(TBO) Saulo Da Silva
What is SESAR? SESAR is the European program for air traffic management infrastructure modernisation. SESAR aims at the development of the next generation.
Traffic Management and FUA integration
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
4D Trajectory Management
Presentation transcript:

Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation Division.- AENA 15th December 2009

Episode 3 2 D Operational & Processes Feasibility Approach Collaborative Planning Phase Roles & Responsibilities Key findings on the CDM Planning Processes Supporting Tools Execution Phase Roles & Responsibilities Key findings on Processes and Operational Feasibility Supporting Tools Small-scale prototyping and gaming exercises supported by Expert Group- Based techniques have allowed operational experts to participate in the assessment of the SESAR CONOPS

Episode 3 3 D Operational & Processes Feasibility Planning Phase.- Exercises & Concepts Dynamic DCB when arrival congested situations AMAN DCB when military changes its airspace reservation at short notice Total Airport Management Processes and the definition of the high-level AOP content Collaborative Planning Phases

Episode 3 4 D Operational & Processes Feasibility Planning Phase (1/3) The principle of the business management ownership and its interpretation in the context of DCB processes remains an open issue Airspace Users claimed for trajectories changes decisions from the beginning of the DCB processes Network managers expose considered that business trajectories should first be determined by ATM taking into account network constraints A New function/role could convey the civil users interests integrated within the decision-making entities: The airline Coordinator He should always be aware of this negotiation process, but only intervenes if the problem cannot be solved through direct negotiation This function will ensure the equity of the prioritised users

Episode 3 5 D Operational & Processes Feasibility Planning Phase (2/3) A clear breakdown of the ATM planning processes according to the temporal scope, look-ahead time horizon and actors involved is essential The extension of geographical ranges and temporal scopes will fundamentally shift the nature of the planning processes, and it raises many issues related to the share of responsibilities between regional, sub-regional and local actors E.g. two ATM processes with different look-ahead time were viewed by the experts as constituent elements of the queue management concept mentioned in the CONOPS A continuous AMAN process works mainly on airborne flights by managing accurate arrival sequences. This process is under the responsibility of the APOC/TMA manager An upstream dynamic DCB process pre-sequences flights when a significant imbalance is detected. This process is under the responsibility of the sub- region that has the congested airport

Episode 3 6 D Operational & Processes Feasibility Planning Phase (3/3) Automation is the answer to guarantee the equitable treatment of airspace users, and the consideration of their interests whilst maintaining the performance levels targets The Civil Users should invest in tools to manage their business trajectory planning in reaction to ATM constraints (time and space constraints) The Sub-Regional Manager, as the final responsible to get a DCB Solution at the FAB Level, will need what-if tools to support the processes The APOC, considered as an “agent-based” environment should provide different services such as Performance Planning Service, Monitoring and alerting Service, Decision Support Service and Analysis Service

Episode 3 7 D Operational & Processes Feasibility Execution Phase.- Exercises & Concepts En-Route Environment Reference Business Trajectory (RBT) and the Controlled Time of Arrival (CTA) TMA Environment 4D/time constraints (CTA) and ASAS sequencing and merging with a P-RNAV route structure and Continuous Descent Arrival procedures New separation modes and complexity management in the en-route phase.

Episode 3 8 D Operational & Processes Feasibility Execution Phase (1/3) While pilots are responsible for the 4D trajectory achievement, ATCos are tasked to facilitate the aircraft 4D trajectory (RBT and CTA when applied) The management and adherence to an agreed trajectory is a change for today’s practices

Episode 3 9 D Operational & Processes Feasibility Execution Phase (2/3) In the En-route Phase, ATCos raised the issue of lack of predictability which caused high workload. This is due to: The agreed trajectories can change from day to day The unknown and changing conflict points The difficulty to manage aircraft behavior On the other side, ATCos efficiently facilitated the aircraft 4D trajectory Most of the aircraft followed their 2D planned trajectory and controllers’ intervention had a very limited impact of the time achievement. On the contrary, the efficient management of the lateral and time dimensions was sometimes detrimental to the vertical dimension

Episode 3 10 D Operational & Processes Feasibility Execution Phase (3/3) In the TMA environment, ATCos raised that the CTAs will allow the optimal delivery at the metering point. This will improve punctuality, predictability and stack usage On the contrary, the concept might reduce flexibility and ATCos’ situation awareness ATCos, having delegated spacing tasks to the cockpit, are able to better monitor the traffic evolution on the arrival streams The ASPA S&M infringement tool enables to have a timely warning in case of infringement