Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association 17-18 April 2002.

Slides:



Advertisements
Similar presentations
Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
Advertisements

Transmission Charging Developments DCMF3 rd June 2010
BI Marketing Analyst input into report marketing Report TitleElectricity in Botswana Report SubtitleCountry profile of power market trends and investment.
GB Queue The GB Queue – Problems and possible solutions Mark Copley.
East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
Energy Policy and Scotland’s Constitutional Future Setting the Scene John Paterson University of Aberdeen.
Grid Connections: Now and the Future Patrick Smart Head of Commercial and Regulatory 10 th November 2010.
Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
Renewable Targets and Policy Linda Pooley Head of Renewable Energy Technology and Investment Scottish Governmnet.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Bringing about beneficial change... POLICY DIALOGUE ON CORPORATE GOVERNANCE IN CHINA Presentation by Patricia Leahy, Director, UK National Audit Office.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
“Investment in Transmission” Economics of Electricity Markets – IDEI Toulouse, 2-3 June 2005 Jon Carlton – Director of Network Strategy.
©2010 Energy Technologies Institute LLP The information in this document is the property of Energy Technologies Institute LLP and may not be copied or.
1 VIABILITY OF SOLAR ENERGY BASED ELECTRICITY GRID- REGULATORY CHALLENGES AND OPPORTUNITIES Nigerian Electricity Regulatory Commission, Abuja Presentation.
The Role of regulators in Energy security Sergey G.Novikov Head of Federal Tariff Service of Russian Federation Istanbul
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 11 Renewable Energy Module 11: DISTRIBUTED GENERATION: OPTIONS AND APPROACHES.
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Deploying marine renewable energy in the EU A Celtic perspective on interconnection Adam Bruce Global Head of Corporate Affairs, Mainstream Renewable Power.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
By Eng. Joseph K. Njoroge, MBS, Managing Director & CEO Kenya Power & Lighting Co. Ltd. By Eng. Joseph K. Njoroge, MBS, Managing Director & CEO Kenya Power.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Stephen Boyd, Assistant Secretary, Scottish Trades Union Congress.
Future Energy Scenarios 2015 Supply Marcus Stewart Demand and Supply Manager.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
World Forum on Energy Regulation IV Athens, Greece October , 2009 "Reducing Regulatory and Technological Barriers to Demand Side Participation“
Russia as a key player on the world energy market Elena Telegina Director of the Institute of Geopolitics and Energy Security of Russia Member of the Board,
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 16 Energy Efficiency Module 16: REGULATION AND POLICY OPTIONS TO ENCOURAGE ENERGY EFFICIENCY.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
Future of Africa’s iGDP Protect. Connect. Grow.. Is Africa still a significant market? Africa is the 2nd largest continent, in both size and population.
2 July 2002UK MAN Managers' Group1 Schools networks England RBC interconnection Scotland LA interconnection (?) and transit Wales LLNW interconnection.
Cost trends for Offshore Wind - and a look at the resources David Milborrow
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
EUROPE’S ENERGY EXPORTER Neart na Mara. source EWEA.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
Ensuring the delivery of secure low carbon energy David Green Chief Executive, UKBCSE.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Generation and transmission interconnections 4 July, 2013 Virgilijus Poderys CEO of LITGRID AB.
Energy Networks Association The Road to a Smarter Grid Alan Claxton Director of Energy Futures Towards The Smarter Utility Wednesday 18 th May 2011.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
A National Grid Fit For The Future Chris J Murray. Newton Institute - 26 th May 2010.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Insert presentation title on the slide master WELCOME Councillor Nick Forbes Leader of Newcastle City Council CARBON ACTION NETWORK DURHAM, 21 MAY 2013.
ACCESS TO THE GRID Vaida Tamašauskaitė Power System Planning Division Power System Development Department Lietuvos energija AB Ryga, 3 July, 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Information in this presentation is subject to change Next generation services - Broadband & voice progress - March % UK coverage 549 Next generation.
Local asset charging arrangements DCMF April 2008.
GCSE Science A Physics 1 Transmission of Electricity Learning Outcomes Understand the need for an electrical distribution system Describe the national.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
The role of renewables in electrifying road transport Jenny Hogan Director of Policy.
1 Capacity and Congestion Management Duties of TSOs - Availability of infrastructure and capacities for shippers to fulfil their supply obligations - Guarantee.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
Presentation at REEEP Regulatory Forum, 28 September 2004
The National Grid Mains electricity is produced by ______________.
Overview on Renewable energy in Bulgaria
March 2, 2014 One sector, one target, one message The pathway towards 100 EUR / MWh in 2023.
The ISLES Project Bob Hanna
Incentives for electricity infrastructure – ERGEG view
Use of Real-Time Simulation in the Caithness-Moray HVDC Transmission Project Dr. Oluwole Daniel Adeuyi 10th April 2019 Keynote Presentation at the 4th.
IWEA Offshore Wind Conference 2019 – Developer Led ‘v’ Centralised Grid Connections 12th September 2019.
Presentation transcript:

Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002

Outline  Overview  National Grid obligations  Reinforcements  Commercial/regulatory/charging issues

N ational Grid Obligations  owner & operator of high voltage transmission system in England & Wales  offer connection to anyone who applies (within 3 months)  offer use of system to anyone who applies (within 28 days)  charge on the basis of approved charging principles  wind generators treated like any other generator - but is tailoring needed?

Generic Transmission Connection Generation Circuit Grid Substation Generation Spur Deeper Infrastructure Generation OwnedShallow Connection Charge TNUoS Tariff

National Grid Obligations - Issues  If connection interface is onshore, then existing procedures address:  direct transmission connection; or  ‘use of system’ if distribution connected  However, do obligations extend offshore? If so  are connections regulated or not?  are charging principles same as onshore?

ACS Power Flow Pattern for 2003/04 generation demand SCOTLAND UPPER NORTH NORTH MIDLANDS CENTRAL ESTUARY SOUTH WESTFRANCE B1 B2 B3 B7 B

Reinforcement - Issues  Potentially significant costs (UK studies in progress)  Basis of investment  Contractual?  Strategic?  Market determined? (Tx Access?)  Timing/consents  Reinforce then connect?  Connect then reinforce?

Commercial, Regulatory & Charging  Shallow connection (for transmission):  minimum capital cost scheme  charges based on scheme specific costs  sharing with subsequent users  Deeper infrastructure:  guarantees sought from connectees  but costs shared via TNUoS tariff

Connection - Issues  Individual transmission connections expensive for wind developments  Sharing connections reduces costs to connectees  Is there a role for National Grid in finding partners?  Are changes to connection charging principles needed? – connection tariff – shallower boundary

System Infrastructure Charges  Based on contracted developments  locationally based tariff – reflects incremental network reinforcement costs on both demand and generation who use capacity  capacity-based charges – highest registered capacity of directly connected generator – triad demand contribution (basis of embedded benefit)  Future review likely (eg. Tx Access)

Conclusions  Wind can get access to the transmission network now  Potential benefits in tailoring processes to achieve necessary connection sharing  Need to clarify off-shore ground-rules  Significant challenges from access review  Constructive dialogue underway  “Getting Connected Guide” see

National Grid UK overview Scotland France Key Statistics 2001 Installed Capacity67.9 GW Max Demand 53.2 GW Energy Supplied303 TWh Route km 7650 km No. of Substations 300