Dynamic Floodways: Accounting for Both Storage and Conveyance José María Guzmán, P.E. Gaston Cabanilla, P.E., CFM May 2010, National ASFPM Conference,

Slides:



Advertisements
Similar presentations
Flood Profile Modeling with Split Flows and Weirs
Advertisements

Regulations and Processes for Floodway/Non-Encroachment Area Encroachments. What to look for and what to require. Robert Billings, PE, PH, CFM Mecklenburg.
Wallingford Software What’s New in InfoWorks CS v8.5 Andrew Walker.
L-1621/Klipsch98 1 Importing HEC-2 Data Into HEC- RAS What you need to know…
Spatial Analysis with ArcView: 2-D. –Calculating viewshed –Calculating line of sight –Add x and y coordinates –Deriving slope from surface data –Deriving.
Use of a hydrodynamic model to
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
Duval County: Using the power of SWMM unsteady modeling for CLOMR applications May , Louisville KY José Maria Guzmán, P.E. D.WRE Gaston Cabanilla,
A Simplified Method of Implementing No Rise Analysis in Unnumbered A-Zones Based Upon No Loss of Conveyance Dwayne E. Culp, Ph. D., P.E., CFM Second National.
Examples for Mitigation Category 1 and 2 Streams.
Floodplain Delineation of Indiana Streams Allison Craddock Tom Gormley Jessica Tempest Erin Wenger.
Floodplain Mapping using HEC-RAS and ArcView GIS Eric Tate Francisco Olivera David Maidment
Application of HEC- HMS for Hydrologic Studies Texas A&M University Department of Civil Engineering CVEN689 – Applications of GIS in CE Instructor: Dr.
Processing Geospatial Data with HEC-GeoRAS 3.1
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
HEC-RAS.
Modeling River Ice and River Ice Jams with HEC-RAS
Hydraulic Screening and Analysis Needed for USACE Review
Texas A&M University, Department of Civil Engineering CVEN 689 Applications of GIS in Civil Engineering Professor: Dr. Francisco Olivera Student: Brad.
Creating Depth Grid from a DFIRM FEMA Region VIII Mitigation GIS Team Wednesday, February 13, 2013.
David Knipe Engineering Section Manager Automated Zone A Floodplain Mapping.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
3-in-1 Stream Restoration Using AutoCAD® Civil 3D®, Map 3D, and Autodesk® Storm and Sanitary Analysis Heather Nagel Application Engineer.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
CH 7 - Open Channel Flow Brays Bayou Concrete Channel Uniform & Steady
Hydrologic Cycle. Hydrologic Cycle Processes Surface Water Soil water Atmospheric water Groundwater Processes Precipitation Evaporation Surface Runoff.
Feb 2003HEC-RAS Version 3.11 Slides adapted from HEC Unsteady Flow Course Unsteady Flow Course.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
ArcHydro – Two Components Hydrologic  Data Model  Toolset Credit – David R. Maidment University of Texas at Austin.
by David M. Beekman and Vito A. Cimino
National Research Council Mapping Science Committee Floodplain Mapping – Sensitivity and Errors Scott K. Edelman, PE Watershed Concepts and Karen Schuckman,
HEC-RAS Version 3.1 Basic Input Lecture 3 Presented by:
CRWR-FloodMap ArcView Digital Elevation Model HEC-HMS Flood discharge HEC-RAS Water surface profiles ArcView Flood plain maps CRWR-PreProAvRAS Digital.
1 Overview of Unsteady Flow Modeling With HEC-RAS Gary W. Brunner, P.E.
March 2003HEC-RAS Version 3.1 Other Features of HEC-RAS- part 2 Cross Section Interpolation Multiple Plans Supporting Pictures.
19th Engineers International Conference:
Channel Routing Simulate the movement of water through a channel
Channel Routing Simulate the movement of water through a channel
Floodplain Delineation of Unsteady Flow Using HEC-RAS Final Presentation Presented By: Kevin Donnelly.
1 VIRGINIAWORKSHOP Feb. 28 – Mar. 3, 2006 INTRODUCTION to SITES for WATER RESOURCE SITE ANALYSIS.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
1 Integrating Water Resources Engineering and Geographic Information Systems (GIS) National Weather Service NWSRFS International Workshop October 21-23,
Map-Based Flood Hydrology and Hydraulics David R. Maidment Jan 10, 1998.
1-Day of 2-D How Are The Results Of Hydraulic Models Used To Manage Floodplain Development Under The NFIP? Eric Simmons, FEMA Region IX.
Basic Hydraulics: Channels Analysis and design – I
HEC-RAS Version 3.1 Overview
Basic Hydraulics: Open Channel Flow – I
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
4.0 Unit 4: BFE Considerations. 4.1 Objectives At the end of this unit, you should be able to:  List potential data sources for determining BFEs in A.
April 2002HEC-RAS Version 3.0 FY02Slide 1 of 12 HEC-RAS Version 3.1 Troubleshooting.
Viewshed Analysis A viewshed refers to the portion of the land surface that is visible from one or more viewpoints. The process for deriving viewsheds.
Regional to Engineering Scale HUC8 HUC12 Catchment Engineering Hydrology Engineering Hydraulics Personal – a flooded home.
What is the Bradshaw model?
Map-Based Flood Hydrology and Hydraulics
Channel Routing Simulate the movement of water through a channel
Channel Routing Simulate the movement of water through a channel
Map-Based Hydrology and Hydraulics
A SURFACE WATER MODEL OF THE MIAMI RIVER
Hydraulic Routing in Rivers
May, 1999 Bridges This module will cover bridges and how they are input into HEC-RAS. 9/21/2018.
Regional Hydraulic Model for the City of Austin
UH-Downtown White Oak Buffalo.
Quantifying Flow Reduction Benefit of the Miners Ravine Off-Channel Detention Basin Using HEC-HMS
Hydraulic Routing in Rivers
Flood Frequency Analysis
Love Field Modernization Program
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Automated Techniques for Hydraulic Modeling Applications
Automated Zone A Floodplain Mapping
Presentation transcript:

Dynamic Floodways: Accounting for Both Storage and Conveyance José María Guzmán, P.E. Gaston Cabanilla, P.E., CFM May 2010, National ASFPM Conference, Oklahoma City

Outline u Standard FEMA methods to develop a floodway u Accounting for storage using SWMM u Application to Jacksonville, FL (Duval County) u DFU: A computational tool u Discussion of floodway results Acknowledgments: Tom Nye, Sandeep Gulati, Seungho Song, Michael F. Schmidt, Zhida Song-James

Floodway Definition Based on FEMA Regulations u FEMA’s regulations (Section 59.1) state: “A floodway is defined as the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water-surface elevation by more than a designated height. ”

Floodway Definition Based on FEMA Regulations (cont.) u In the State of Florida the “regulatory” floodway is based on a maximum allowable one foot rise in the BFE when the floodplain is encroached through the flood fringe

The USACE Developed Several Methods to Establish a Floodway u Methods were developed with the use of HEC-2 u In general there are five methods available User enters right and left encroachment stations 1 User enters fixed top width 2 User specifies the percent reduction in conveyance 3 User specifies a target water surface increase 4 User specifies a target water surface increase and maximum change in energy 5

HEC-RAS Includes Tools to Run the Floodway Development u User can select from among the five methods developed by the USACE u The model generates the floodway encroachments

When Not Using HEC-RAS, the Options are Limited u In the particular case of SWMM, FEMA guidelines suggest using the HEC-RAS tools: 1. Convert the model to a steady flow model such as HEC-2 (or HEC-RAS) to compute encroachment stations using the equal conveyance method

When Not Using HEC-RAS, the Options are Limited (cont.) u In the particular case of SWMM, FEMA guidelines suggest using the HEC-RAS tools: 1. Convert the model to a steady flow model such as HEC-2 (or HEC-RAS) to compute encroachment stations using the equal conveyance method 2. Apply the encroached transects to the SWMM model to compute the water surface elevations to account for the loss of floodplain storage

When Not Using HEC-RAS, the Options are Limited (cont.) u In the particular case of SWMM, FEMA guidelines suggest using the HEC-RAS tools: 1. Convert the model to a steady flow model such as HEC-2 (or HEC-RAS) to compute encroachment stations using the equal conveyance method 2. Apply the encroached transects to the SWMM model to compute the water surface elevations to account for the loss of floodplain storage 3. If there is greater than the allowable increase (one foot) in any of the cross sections, go back to the HEC model and get new encroachment stations

CDM was contracted to update the 1989 FIS in Duval County, FL using SWMM Extensive previous models Successful model field verifications Flat terrain and tidal influence Integrated model that solves the entire system as once and not as individual branches Upcoming water quality applications related to concurrent TMDL studies Extensive previous models Successful model field verifications Flat terrain and tidal influence Integrated model that solves the entire system as once and not as individual branches Upcoming water quality applications related to concurrent TMDL studies The project was developed in SWMM for several reasons:

Instead of iterating between HEC-RAS and SWMM, we developed criteria to develop floodway in SWMM Method 4 was selected (Specified Floodway Surcharge) The original concept consisted of comparing two stream geometries and determining the differences in water surface elevation Main differences with HEC-RAS Both geometries are evaluated as part of the entire model (networked model) Both models are run for the 100-year/24-hour storm (dynamic model) Applying the criteria set by the FEMA standard, CDM used SWMM as follows:

The Channel Geometry is Modified by the Engineer by Introducing Channel Encroachments

The Engineer Computes the Conveyance Reduction on Both Sides, and Makes Sure That They are Equal K is a Function of the Wet Perimeter, Cross-sectional Area, and Channel Roughness

Cross-Section Example Existing Proposed

Run Model Observe Qn, WSEn Existing Condition Run Model Observe Qe, WSEe Encroached Condition Conveyance Surcharge Verification of Basic Criteria The Process Becomes a Series of Tests Where Comparing Two Conditions

The Model Accounts for the Loss of Storage Associated with the Encroachments because it evaluates all the model cross sections at once

Increased Complexity Took the Team From the Basic Concept to the Development of a Dynamic Floodway Utility (DFU) RUN SWMM DOS Version EPA SWMM 5.12 DFU screens model output Read SWMM INP file Read SWMM RPT file Compares peak stages to BFE Sets encroachment percentages for next run Edits transect data to encroach cross-section Re-writes SWMM INP file with new encroachment Iteratively in DOS batch file

1. Run the 1% annual chance flow with natural channel geometry 2. Observe the following results from the simulation period: - Peak flow Qn (natural channel) WSEn (natural channel) 2. Observe the following results from the simulation period: - Peak flow Qn (natural channel) WSEn (natural channel) 5. Iteration - N - modify model geometry based on a percentage encroachment for each side 3. For each reach, move transect stations inward to the intersection with WSEn, set the encroachment percentage to 10% 7. Determine conveyance reduction for the left and right side of the transect: K L, K R 8. Select the minimum value between KL and KR. Adjust the other station to ensure that K L = K R. 9. Run model again for the 1% annual chance storm with adjusted transects 11. Calculate the difference in peak WSE (surcharge) at every node 12. Compare each reach's surcharge (at us and ds nodes) to maximum surcharge - increase or decrease percentage encroachment as necessary (negative possible) 14. Prepare floodway table YES NO 4. Set N = 0 13a. N = N Observe the following values for the simulation period: - Peak flow Q F (floodway) - Peak WSE at each node WSE F (floodway) 10. Observe the following values for the simulation period: - Peak flow Q F (floodway) - Peak WSE at each node WSE F (floodway) 6. If any of the new proposed stations encroaches beyond the existing channel banks, set the encroachment station to the existing bank 13. Is the average surcharge for all reaches > threshold*, < =1 ft, or are both sides encroached to main channel, or is the encroachment fixed by a ds node? N = Iteration index K L = Left conveyance K R = Right conveyance WSE = Water surface elevation * Threshold may be defined by user: in this project we used 0.6 N = Iteration index K L = Left conveyance K R = Right conveyance WSE = Water surface elevation * Threshold may be defined by user: in this project we used 0.6

DFU Convergence Criteria u One of the following criteria must be met for each cross section in the floodway mapping portion of the model: The cross section’s increase in peak stage (average of upstream and downstream node stages) should be between a threshold (0.6 ft) and 1.0 ft Both sides of the cross section are encroached to the bank of the main channel The cross section encroachment has been set back by an increase in a downstream node

The Following Data are Given in a Text File to the DFU Priority level (main branch and then tributaries) Cross section position within each level, so the tool can read what sections are upstream from a given position – without having to decipher SWMM connectivity Main channel stream bank positions – limits encroachment List of cross sections that are part of the floodway analysis, including:

@echo off set E1=0 set E0=0 :E0 echo Iteration %E1%E0% swmm5 CF_2006_100_%E1%E0%.inp CF_2006_100_%E1%E0%.rpt floodwayv3 CF_2006_100_%E1%E0%.inp CF_2006_100_%E1%E0%.rpt if %E0%==9 goto E1 if %E0%==8 set E0=9 if %E0%==7 set E0=8 if %E0%==6 set E0=7 if %E0%==5 set E0=6 if %E0%==4 set E0=5 if %E0%==3 set E0=4 if %E0%==2 set E0=3 if %E0%==1 set E0=2 if %E0%==0 set E0=1 goto E0 :E1 set E0=0 if %E1%==9 goto Done if %E1%==8 set E1=9 if %E1%==7 set E1=8 if %E1%==6 set E1=7 if %E1%==5 set E1=6 if %E1%==4 set E1=5 if %E1%==3 set E1=4 if %E1%==2 set E1=3 if %E1%==1 set E1=2 if %E1%==0 set E1=1 goto E0 :Done DFU – Batch File Structure

The Engineer Reviews a Summary Table Generated by the DFU Cross Section LevelmaxDiffaveDelta Left encr Rate Right encr Rate >= Banks SW SW40005FP YES SW40006FP YES SW YES SW YES SW YES SW YES SW40014L YES SW40014L YES SW YES SW YES SW NOYES SW NO SW NO SW NO SW NO

Results are Then Presented in the Floodway Data Table

Once the User is Satisfied With the Floodway Outcome, the Team Translates It into a Graphical Delineation Cross-sections need to be accurately identified in the map The encroachment stations are identified along the cross-section In the future, SWMM should improve the depiction of cross-sections to allow easy identification of floodway points in the map

FEMA Has Been Involved in the Process Through a Series of Memoranda u FEMA staff are interested in the results of the dynamic methodology u Main FEMA concerns u Added criteria for floodplain storage u Many engineers have expressed concerns with the current steady application in some states u Having a standard methodology that other engineers can use to replicate results

Manual Corrections to Dynamic Floodway There are instances in which the dynamic floodway is too narrow or too wide due to hydraulic considerations In these cases, the user should overwrite the floodway using engineering judgment The user should understand the interdependence of adjacent cross-sections

Floodway Review at bridges and culverts Narrow FW Wide FW

Floodway Review at Confluence of Multiple Streams

Rasplot Software Was Used to Generate Profiles Specific to SWMM That Display the Nodes Instead of Cross-Sections

FIRM panel format based on link-node models such as SWMM

Conclusions

Dynamic Floodways: Accounting for Both Storage and Conveyance José María Guzmán, P.E. May 2010, National ASFPM Conference, Oklahoma City

Additional Challenges for SWMM Users in Mapping u WSE not reported at cross-sections u Cross-section locations are not included in the model u Meandering channels u Viewing the WSE in the cross-sections