A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL.

Slides:



Advertisements
Similar presentations
Predicting Future Gas Lift Performance in a Mature Water Flooded Field
Advertisements

DESIGNING A WATERFLOOD Designing a water flood involves both technical and economic consideration. Economic analysis are based on estimates of water.
Marco R. Thiele and Rod P. Batycky
DL PETROLEUM ENGINEERING AND CONSULTING LIMITED
DOE HORIZONTAL PROJECT
Field Demonstration of CO 2 Miscible Flooding in the Lansing-Kansas City Formation, Central Kansas Alan P. Byrnes (KGS, PM-BP1) Class II Revisited DE-AC26-00BC15124.
Westport Oil and Gas Co., L.P.
FORM 1027 – BOTTOM HOLE PRESSURE TEST. This presentation will assist you in the completion of the Form The bottom hole pressure test. Date of Last.
FORM 1021A – HARDSHIP WELL APPLICATION (Limited Deviation Rule)
Kuwait Gulf Oil Company (K.S.C.) A Subsidiary of Kuwait Petroleum Corporation Enhancing Reservoir Performance and Production Capability of Divided Zone.
Application of Advanced Exploration Technologies for the Development of Mancos Formation Oil Reservoirs, Jicarilla Apache Indian Nation, San Juan Basin,
SPE PP A Method for Probabilistic Forecasting of Oil Rates in Naturally Fractured Reservoirs Julio César Muñoz Blanco y Rafael Paz Palenzuela, CBM.
Forensic Analysis Why Did This Field Die? Presented at Western Australia Section of SPE June 19, 2012 Perth, Australia Dr. Bill Cobb William M. Cobb &
DESIGN AND IMPLEMENTATION OF A CO2 FLOOD UTILIZING ADVANCED RESERVOIR CHARACTERIZATION AND HORIZONTAL INJECTION WELLS IN A SHALLOW SHELF CARBONATE APPROACHING.
Horizontal Wells - Applications in Mature Production Areas & A Kansas Field Demonstration by Saibal Bhattacharya Richard Pancake Paul Gerlach.
E. Putra, Y. Fidra and D.S. Schechter
CIPC Application of X-Ray CT for Investigation of CO 2 and WAG Injection in Fractured Reservoirs D. Chakravarthy, V. Muralidharan, E. Putra and.
Evaluation of Reservoir Performance Using Decline Type Curves Improve Reservoir Description - Area Central Norte (ACN) Region, El Tordillo Field Argentina.
Predictive Pore-Scale Modelling
Vivek Muralidharan Simulation and imaging experiments of fluid flow through a fracture surface: a new perspective.
Sample Heavy Oil Screening Study Prepared For Epsilon Energy LTD Gemini Solutions Inc. James L Buchwalter, P.E./PhD.
Classification: Internal Status: Draft Using the EnKF for combined state and parameter estimation Geir Evensen.
Significant New “Learings” From An Integrated Study Of An Old Field, Foster/South Cowden Field (Grayburg & San Andres), Ector County, Texas DE-FC22-93BC14982.
Chapter 1 RESERVOIR.
EOR: Promesa Incumplida o un Gran Futuro?
Reservoir Characterization Capstone Project Semester 1 PNG 490 – Team 26 April 29 th 2014.
Significant New “Learnings” From An Integrated Study Of An Old Field, Foster/South Cowden Field (Grayburg & San Andres), Ector County, Texas. Robert C.
Classification: Internal Status: Draft Low Salinity Waterflooding: Opportunities and Challenges for Field Pilot Tests Dagmar Spangenberg, Peimao Zhang.
1 Enhanced Oil Recovery Studies in the Tirrawarra Oil Field, Cooper Basin, South Australia Ian Pedler 23 September 2009.
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
Reserve Evaluation for Enhance Oil Recovery Purposes Using Dynamic Reserve Evaluation Model Woodside Research Facility GPO Box U 1987 Perth West Australia.
Improved Recovery Demonstration for Williston Basin Carbonates DE-FC22-93BC14984 Luff Exploration Company Mark Sippel, Consulting Engineer.
Perspectives for the Brazilian Petroleum Sector After the Transition from Petrobras Monopoly to a Competitive Environment Ivan Simões Filho
December 12, 2002 Improved Oil Recovery in Mississippian Carbonate Reservoirs of Kansas DE-FC22-93BC14987 Timothy R. Carr, Dana Adkins-Heljeson,
Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly.
CPGE Surfactant-Based Enhanced Oil recovery Processes and Foam Mobility Control Task 4: Simulation of Field-Scale Processes Center for Petroleum and Geosystems.
Estimating Reserves and Resources in Russia New York Energy Forum May 15, 2008 Presented by Miller and Lents, Ltd. International Oil and Gas Consultants.
Luff Exploration Company Mark Sippel, Consulting Engineer
Reservoir Simulation Study
Field Demonstration of CO 2 Miscible Flooding in the Lansing-Kansas City Formation, Central Kansas Alan P. Byrnes Kansas Geological Survey Alan P. Byrnes.
 Completed slim-tube tests for MMP measurement.  Completed swelling tests.  Completed phase behavior model.  Completed preliminary geological model.
Chapter 3 Material Balance Applied to Oil Reservoirs
Base Case Simulation Model
Wytch Farm Field Development Project
Tom Beebe Project Manager
Res A Performed By Gemini Solutions, Inc. May 2001.
Algunas Reflexiones sobre EOR
Waterflood Management Case Study - Goal  Change waterflood strategy early in waterflood to maximize recovery: 12 months of waterflood performance Predicted.
History Matching Flowmeter Data in the Ghawar Field
“Perspectives on Montana’s Petroleum Industry” MREA-MPA-MONTAX “Bridges to the Future” Conference October 15, 2009 Dave Ballard President Ballard Petroleum.
PAWNEE RESERVOIR SIMULATION STUDY Pioneer Natural Resources Co. Performed By Gemini Solutions, Inc. January 2001.
0 International Joint Study on CO2-EOR - Study on Applicability of CO2-EOR to Rang Dong Field, offshore Vietnam - Sunao Takagi, Komei Okatsu IEA Collaborative.
CO 2 Enhanced Oil Recovery Presented by (Team N): Lihui Ye Madison Tenneson Shatha Alnaji Wei Zhang PETE 4735 Spring,
Study of the Niobrara Formation in the Borie Field Abdulaziz Muhanna Alhubil, Gabrijel Grubac, Joe Lawson, Rachael Molyneux & David Scadden.
E-Week Chevron Competition Team G E-Week Chevron Competition 2016 Team G 1.Ahmed Bubshait 2.Mahshad Samnejad 3.Rayan Dabloul 4.Marjan Sherafati 5.Abdulrahman.
IOR in the North Sea Average recovery around 45% Remaining 55% Half due to non swept volumesHalf due to residual oil saturation 1 % increase in oil recovery.
Measurement and Control of Reservoir Flow
A review of In-Situ Combustion Operations in India, its Assessment and the Way ahead 1 1.
Date of download: 10/22/2017 Copyright © ASME. All rights reserved.
Unconventional Reservoirs
Houston, 4th & 5th February 2003
ArcEOR A posteriori error estimate tools to enhance the performance of
Introduction to Effective Permeability and Relative Permeability
How do we use this information?
Reservoir Simulation FEEDBACK INPUT Geologic Model Time
Example 1 of SPE : Simultaneous versus Well-by-Well Optimization
PPT Design on 3D models Landysh Minligalieva Reservoir Engineer
Gas Condensate Blockage
Gas Condensate Blockage
A. Dollari*, Ch. Chatzichristos and A. G. Yiotis
Presentation transcript:

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 1 Cuando un simple modelo estocástico conviene más que un simulador numérico. Cuando un simple modelo estocástico conviene más que un simulador numérico. Victor Sancho Vincente Berrios Oman Oquendo Victor Sancho Vincente Berrios Oman OquendoSTOIIPSCGIIP(MSm3)(MSm3) Mean Reward 3,7775,46 Standard Deviation 1,8737,31 90 Percent Probability 1,5029,90 50 Percent Probability 3,6272,39 10 Percent Probability 6,22124,30 Victor Sancho Vicente Berrios Oman Oquendo Victor Sancho Vicente Berrios Oman Oquendo Desarrollo Estratégico de un Campo :

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 2 CONTENT:CONTENT: Field Description Field Description Generalities Generalities Geology Geology Production History Production History Numerical Simulation Numerical Simulation Reservoir Development Strategy Reservoir Development Strategy Stochastic Model Stochastic Model Reserves Estimations Reserves Estimations Water Management Water Management Infill Drilling Infill Drilling Conclusions Conclusions Field Description Field Description Generalities Generalities Geology Geology Production History Production History Numerical Simulation Numerical Simulation Reservoir Development Strategy Reservoir Development Strategy Stochastic Model Stochastic Model Reserves Estimations Reserves Estimations Water Management Water Management Infill Drilling Infill Drilling Conclusions Conclusions

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 3 Where it is… Señal Picad a

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 4 Basic Information… Discovered in 1963 Discovered in 1963 Area: acres (62 Km 2 ) Area: acres (62 Km 2 ) Lease Ending: Nov Lease Ending: Nov Reservoir Depth: 2750’ (850 mts) Reservoir Depth: 2750’ (850 mts) Reservoir Temperature: 110º F (43.3ºC) Reservoir Temperature: 110º F (43.3ºC) API: 25 API: 25 GOR: 120 ft 3 /Bl (22 m3/m3) GOR: 120 ft 3 /Bl (22 m3/m3) Drilled Wells: 306 Drilled Wells: 306 Active Wells: 174 Active Wells: 174 Injector Wells: 71 Injector Wells: 71 Well Spacing: 500 mts Well Spacing: 500 mts Actual Gross Production: BOPD, ( m3/d) Actual Gross Production: BOPD, ( m3/d) Actual Oil production Rate: BOPD, (900 m3/d) Actual Oil production Rate: BOPD, (900 m3/d) Actual Water Injection Rate: bbl/d ( m3/d) Actual Water Injection Rate: bbl/d ( m3/d) Water Cut: 94 % Water Cut: 94 % Cummulative Oil Production: MMBls (19.4 MMm 3 ) Cummulative Oil Production: MMBls (19.4 MMm 3 ) Discovered in 1963 Discovered in 1963 Area: acres (62 Km 2 ) Area: acres (62 Km 2 ) Lease Ending: Nov Lease Ending: Nov Reservoir Depth: 2750’ (850 mts) Reservoir Depth: 2750’ (850 mts) Reservoir Temperature: 110º F (43.3ºC) Reservoir Temperature: 110º F (43.3ºC) API: 25 API: 25 GOR: 120 ft 3 /Bl (22 m3/m3) GOR: 120 ft 3 /Bl (22 m3/m3) Drilled Wells: 306 Drilled Wells: 306 Active Wells: 174 Active Wells: 174 Injector Wells: 71 Injector Wells: 71 Well Spacing: 500 mts Well Spacing: 500 mts Actual Gross Production: BOPD, ( m3/d) Actual Gross Production: BOPD, ( m3/d) Actual Oil production Rate: BOPD, (900 m3/d) Actual Oil production Rate: BOPD, (900 m3/d) Actual Water Injection Rate: bbl/d ( m3/d) Actual Water Injection Rate: bbl/d ( m3/d) Water Cut: 94 % Water Cut: 94 % Cummulative Oil Production: MMBls (19.4 MMm 3 ) Cummulative Oil Production: MMBls (19.4 MMm 3 )

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 5 Geology…Geology…

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 6 How it was… …Discovered in 1963 …Primary Drainage 1963 – 1976: 130 wells drilled, 8500 B/D (1350 m3/d) 25 % water cut, 2% annual decline rate, 25 % water cut, 2% annual decline rate, Np: 26.4 MMBls (4.2 MMm3), RF: 7% Np: 26.4 MMBls (4.2 MMm3), RF: 7% …1976 Water Flooding Started: Pilot Project 6300 BWPD, 6 inyectors. …1978 – 1979 Pattern Expansion: 61 new wells drilled, reached max. Oil rate BOPD (2450 m3/d) BOPD (2450 m3/d). …80’s – 90’s Full scaled project: 71 injector wells, BWPD, BOPD (1850 m3/d), 4% decline rate. (1850 m3/d), 4% decline rate. …2000 – today Project Maturity: BWPD, 5600 BOPD (900 m3/d), 95% water cut, Np: MMBls (19.2 MMm3), RF:32% water cut, Np: MMBls (19.2 MMm3), RF:32% 180 active wells, 72 injectors 180 active wells, 72 injectors …Discovered in 1963 …Primary Drainage 1963 – 1976: 130 wells drilled, 8500 B/D (1350 m3/d) 25 % water cut, 2% annual decline rate, 25 % water cut, 2% annual decline rate, Np: 26.4 MMBls (4.2 MMm3), RF: 7% Np: 26.4 MMBls (4.2 MMm3), RF: 7% …1976 Water Flooding Started: Pilot Project 6300 BWPD, 6 inyectors. …1978 – 1979 Pattern Expansion: 61 new wells drilled, reached max. Oil rate BOPD (2450 m3/d) BOPD (2450 m3/d). …80’s – 90’s Full scaled project: 71 injector wells, BWPD, BOPD (1850 m3/d), 4% decline rate. (1850 m3/d), 4% decline rate. …2000 – today Project Maturity: BWPD, 5600 BOPD (900 m3/d), 95% water cut, Np: MMBls (19.2 MMm3), RF:32% water cut, Np: MMBls (19.2 MMm3), RF:32% 180 active wells, 72 injectors 180 active wells, 72 injectors

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 7 Production History…Primary Apr 68: 8500 B/D, 1% WOR Apr 76: 2% Decline rate, 25% WOR. A waterflooding Pilot Project was initiated Apr 76: 2% Decline rate, 25% WOR. A waterflooding Pilot Project was initiated Production rate proportional to Active wells. Decline rates almost constant Production rate proportional to Active wells. Decline rates almost constant

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 8 Production History…Primary Apr 68: 8500 B/D, 1% WOR Apr 76: 2% Decline rate, 25% WOR. A waterflooding Pilot Project was initiated Apr 76: 2% Decline rate, 25% WOR. A waterflooding Pilot Project was initiated Production rate proportional to Active wells. Decline rates almost constant Production rate proportional to Active wells. Decline rates almost constant Production History…Secondary Pilot Project, 6300 BWPD, 6 Injectors Production increased proportionally to new wells entry Production decreased proportionally to inactive wells. WOR increased rapidly to 90% Decline rate constant in 4% annually. Inyection rate BWPD

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 9 Production History…Secondary Pilot Project, 6300 BWPD, 6 Injectors Production increased proportionally to new wells entry Production decreased proportionally to inactive wells. WOR increased rapidly to 90% Decline rate constant in 4% annually. Inyection rate BWPD Production History…Maturity Injection rates reached 126 MBWPD, increasing as water production increases. WOR 95% Oil Production stabilized in 5400 B/D.

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 10 Reservoir Numerical Simulation

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 11 Date: 2003 Reservoir Pressure = 54 Kg/cm²- 768psi Reservoir Bubble Point: 72 Kg/cm² psi Cells: 96 x 85 x 16 = active cells active cells. Swi: 32% from cores Date: 2003 Reservoir Pressure = 54 Kg/cm²- 768psi Reservoir Bubble Point: 72 Kg/cm² psi Cells: 96 x 85 x 16 = active cells active cells. Swi: 32% from cores Reservoir Simulation

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 12 History Matching and Prediction

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 13 As seen so far, this field presents recovery optimization challenges: The strategy contemplates: Recalculate OOIP using an Stochastic Model. Recalculate OOIP using an Stochastic Model. Determining fluids distribution under current producing and injecting Determining fluids distribution under current producing and injecting conditions. Infill drilling Program conditions. Infill drilling Program Implementing a Water Conformance Approach. Implementing a Water Conformance Approach. Construction of an expanded numerical simulator will be considered further. As seen so far, this field presents recovery optimization challenges: The strategy contemplates: Recalculate OOIP using an Stochastic Model. Recalculate OOIP using an Stochastic Model. Determining fluids distribution under current producing and injecting Determining fluids distribution under current producing and injecting conditions. Infill drilling Program conditions. Infill drilling Program Implementing a Water Conformance Approach. Implementing a Water Conformance Approach. Construction of an expanded numerical simulator will be considered further. Reservoir Development Strategy

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION POROSITY Hu FVF AREA

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 15

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 16 MODELO ESTRATIGRAFICO Informacion SP Informacion Porosidad Información Litológica

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 17 Determining fluids distribution under current producing and injecting conditions Analysis through segregated flux model software. Analitic Simulation Constant inyection of 150 m³/d. Analysis through segregated flux model software. Analitic Simulation Constant inyection of 150 m³/d.

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION VALUE GENERATION CURVE $/d $ IMPLEMENT A WATER CONFORMANCE APPROACH.

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 19 Results…Results…

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 20 Señal Picada. Localización Infill Señal Picada. Localización Infill SP-001 OBJETIVO OBJETIVO : Adicionar un punto de drenaje inter-espaciado en el Reservorio Loma Montosa a fin de recuperar 20 mil m 3 de petróleo. DATOS BASICOS: Coordenadas: X: ,00 Y: ,00 Profundidad Total: 1000 mbnm Distancia entre pozos: SP-009 a 441 mts SP-042 a 377 mts SP-243 a 334 mts SP-291 a 472 mts SP-136 a 278 mts Tasa Inicial Esperada: 10 m 3 /dia Reservas Asignadas: m 3 de petróleo Costo de Perforación: US$ POZOS VECINOS: Winy Acum Winy Acum Winy m3/d Winy m3/d W. Acum W. Acum W m3/d W m3/d Oil Acum. Oil Acum. Oil. m3/D Oil. m3/D TIPO TIPO

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 21 Señal Picada. Localización Infill Señal Picada. Localización Infill SP-002 OBJETIVO OBJETIVO : Adicionar un punto de drenaje inter-espaciado en el Reservorio Loma Montosa a fin de recuperar 20 mil m 3 de petróleo. DATOS BASICOS: Coordenadas: X: ,00 Y: ,00 Profundidad Total: 1000 mbnm Distancia entre pozos: SP-009 a 325 mts SP-028 a 390 mts SP-029 a 298 mts SP-291 a 367 mts Tasa Inicial Esperada: 10 m 3 /dia Reservas Asignadas: m 3 de petróleo Costo de Perforación: US$ POZOS VECINOS: TIPO Oil. m3/D Oil Acum. W m3/d W. Acum Winy m3/d Winy Acum

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 22 Señal Picada. Localización Infill Señal Picada. Localización Infill SP-003 OBJETIVO OBJETIVO : Adicionar un punto de drenaje inter-espaciado en el Reservorio Loma Montosa a fin de recuperar 20 mil m 3 de petróleo. DATOS BASICOS: Coordenadas: X: ,00 Y: ,00 Profundidad Total: 1000 mbnm Distancia entre pozos: SP-030 a 295 mts SP-033 a 196 mts SP-278 a 374 mts SP-032 a 221 mts SP-030I a 297 mts Tasa Inicial Esperada: 10 m 3 /dia Reservas Asignadas: m 3 de petróleo Costo de Perforación: US$ POZOS VECINOS: TIPO Oil. m3/D Oil Acum. W m3/d W. Acum Winy m3/d Winy Acum

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 23 Señal Picada. Localización Infill Señal Picada. Localización Infill SP-004 OBJETIVO OBJETIVO : Adicionar un punto de drenaje inter-espaciado en el Reservorio Loma Montosa a fin de recuperar 18 mil m 3 de petróleo. DATOS BASICOS: Coordenadas: X: ,00 Y: ,00 Profundidad Total: 950 mbnm Distancia entre pozos: SP-028 a 310 mts SP-251 a 338 mts SP-006 a 423 mts SP-137 a 306 mts Tasa Inicial Esperada: 8 m 3 /dia Reservas Asignadas: m 3 de petróleo Costo de Perforación: US$ POZOS VECINOS: TIPO Oil. m3/D Oil Acum. W m3/d W. Acum Winy m3/d Winy Acum

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 24 CONCLUSIONSCONCLUSIONS Although Señal Picada has a numerical simulator in a single block which matches with production history and has been used to forecast future development, the geological complexity and critical data availability suggested the use of a stochastically model to accelerate field oil production. Using a probabilistic model oil reserves were re-estimated in MMBls (75.1 MMm3) which represents 12 % higher than initially calculated. A development plan of 24 new wells was considered for the next two years. Considering oil prices, lease time and reservoir characteristics, the selection of a stochastically model can surpass the use of a numerical model in order to optimize a mature field profitability. Although Señal Picada has a numerical simulator in a single block which matches with production history and has been used to forecast future development, the geological complexity and critical data availability suggested the use of a stochastically model to accelerate field oil production. Using a probabilistic model oil reserves were re-estimated in MMBls (75.1 MMm3) which represents 12 % higher than initially calculated. A development plan of 24 new wells was considered for the next two years. Considering oil prices, lease time and reservoir characteristics, the selection of a stochastically model can surpass the use of a numerical model in order to optimize a mature field profitability.

A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION A FIELD DEVELOPMENT STRATEGY: WHEN A SIMPLE STOCHASTIC MODEL SURPASSES NUMERICAL SIMULATION 25 Thanks…Thanks… Muchas Gracias…