Telescope Optical Units (TOUs)

Slides:



Advertisements
Similar presentations
Welcome & Introduction
Advertisements

Isabella Pagano PLATO TOUs PM Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Isabella Pagano & Roberto Ragazzoni -
Catania 28 Feb – 01 Mar 2011 V.Viotto (INAF - Osservatorio Astronomico di Padova) TOU Breadboard Status and Test.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Isabella Pagano Milano, 14 Dec 20101PLATO TOUs An update on PLATO TOUs PLATO System & TOU Teams meeting Milano, Dec.
ATHENA WFI Meeting Garching, January 28, 2014 Markus Plattner.
PLATO PLATO TOU KO MEETING ‎ H. Rauer (DLR PF) H. Kinter/A. Salado (Kayser-Threde)
Plato at ASI Tues 05/May/09Dave Walton Plato meeting Rome Tues 5/May/09 Focal Plane Dave Walton UCL/MSSL, + Leicester University Miguel Mas INTA/CAB +
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Plans for rover operations training at ROCC M. Cinato.
Daniele Piazza PLATO TOU Meeting, Catania, PLATO - TOU Mechanical Design & Future Activities Osservatorio Astronomico – Catania June 11 th,
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
Roberto Ragazzoni INAF – Astronomical Observatory of Padova Feasibility of the aspheric lens Catania, June On behalf.
PLATO Telescope Optical Units Meeting in Bern March 12 th 2010.
PLATO : TOU PROGRESS MEETING 14-15/12/2010 S. Mellé (CNES, PLATO Instrument PA Manager) Outline 1- PLATO and TOU PA organization 2- CNES PA organization.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
PLAnetary Transits and Oscillations of stars PLATO Consortium kick-off meeting.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
IMPRS June Organigram of ESA, in the late 1980s
Data processing group. General study of data processing architecture: - overall definition of the data processing functions - share of tasks between on-board.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PLATO Main Electronics Units (MEU) based on inputs from P. Plasson and the system team J. Miguel Mas-Hesse Centro de Astrobiología (CSIC-INTA)
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Plato meeting MSSL Wed+Thur 15+16/Oct/08 UK interests/activities Alan Smith and Dave Walton UCL/MSSL.
AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
MMO-SWG #3[Mar ] BepiColombo Project & MMO Science Schedule H. Hayakawa, Y. Kasaba, M. Kato, T Mukai, and JAXA BepiColombo Project.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
Constellation Space Transportation Planning Office July 30, 2009.
Roberto Ragazzoni INAF – Astronomical Observatory of Padova PLATO: the TOUs (Telescope Optical Units) Kick Off Meeting KOM-Paris,
Telescope Optical Units (TOUs) Isabella Pagano (TOU PM) TOU Team Meeting Catania 11 June 2014.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Development Report Engineering Node August 2006
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
Athena Italian and CNES/IRAP Meeting
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
SPF MAG Quarterly Report – Feb 2015
TOU Team PLATO Consortium Campi Bisenzio, 12 Dec 2016.
Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.
PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues
Double Star Progress Meeting #3 Beijing 2 July, 2002.
Implementation Plan Ronald Drimmel (Project Manager)
Peer Review Agenda (Suggested).
EXECUTIVE forum DATE: 27 MARCH 2017 TIME: 2.00 PM – 3.30 PM (AEDT)
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Lockheed Martin Canada’s SMB Mentoring Program
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
PSS verification and validation
Instrument Overview Larry Springer HMI Program Manager
The ASTRI Camera for the Pathfinder
MAORY Status of the project
Presentation transcript:

Telescope Optical Units (TOUs) Overview of the TOU Team organization during PLATO 1.0 & TOU timeline and plans during phase B1/B2 TOU Team Meeting Catania 11 June 2014 Isabella Pagano (TOU PM)

TOUs during PLATO 1.0 organization Payload Instrument System Coordinator P. Levacher PLATO Payload Management PIPM: P. Bodin Camera Management D. Laubier DPS Management B. Pontet TOU R. Ragazzoni ICU R. Cosentino Normal TOU R. Ragazzoni Normal DPU Ph. Plasson Fast TOU W. Benz Hardware & boot software M. Mas FPA/FEE D. Walton/M. Mas Application software Ph. Plasson Prototype & FM AIV P. Levacher Fast DPU G. Peter AEU S. Fredon Algorithms R. Samadi Catania, 11 June 2014 TOU Meeting

TOUs during PLATO 1.0 organization N-TOU and F-TOU delivered by IT in the PLATO 2.0 plan

TOUs during PLATO 1.0 Our mandate Provide optical – mechanical design performing as required by Science Compliant with the assigned budget Feasible in the due time Reliable in the given environments Catania, 11 June 2014 TOU Meeting

TOUs during PLATO 1.0 How we managed A large team: INAF Padova Catania Milano Univ. Bern Stockolms Obs. Univ. Firenze Industrial Partners Selex Medialario-Sagem Seso RUAG APCO Technologies Catania, 11 June 2014 TOU Meeting

TOUs during PLATO 1.0 How we managed A large team: INAF Padova Catania Milano Univ. Bern Stockolms Obs. Univ. Firenze Industrial Partners Selex Medialario-Sagem Seso RUAG APCO Technologies A huge number of meetings/telecons: TOU Team Bilateral TOU-System Teams TOU-FPA System Teams Catania, 11 June 2014 TOU Meeting

TOUs during PLATO 1.0 How we managed Design (Optics, Mechanics, Thermal, ..) Demonstration Activities TOU AIV procedure TOU Optical and Thermal Performances TOU Optical Lenses Procurement Feasibility Studies TOU MAIT and Management Plan TOU optical coating plan TOU aspherical lens manufacturability & procurement plan TOU AlBeMet® Structure Procurement Plan Breadboard/Prototype Catania, 11 June 2014 TOU Meeting

BreadBoard/Prototype “pre-breadboard” the structure built with off-the-shelf lenses used to test GSE and procedures to be used with the breadboard. “breadboard” the structure built to test alignment in warm and cold environment before the I-PRR “prototype” the structure built after the I-PRR, during the Phase B1 (in the PLATO 1.0 context) , obtained from the breadboard, replacing the L1 and L2 lenses. Catania, 11 June 2014 TOU Meeting

TOUs during PLATO 1.0 What we delivered - Officially At I-PRR (deadline April 2011) PMC TOU plans Source: TOU Team - Date: 4 May 2011 PLATO TOU Project Management Plan: Source: Selex, 20 April 2011 PLATO TOU MAIT Plan: Source: Selex, 20 April 2011 PLATO aspherical lens (ref.11-6219 ed03): preliminary technical, management proposal – Source: Medialario/Sagem-Reosc, 3 May 2011 PLATO Coating - Source: Selex, 22 April 2011 PLATO TOU Design Report: Source: TOU Team, Date 18 April 2011 - included in the 02_Payload-design-report_draft11.pdf Catania, 11 June 2014 TOU Meeting

TOUs during PLATO 1.0 What we delivered – Unofficially 1/2 Not included in any package to ESA but delivered to CNES and O. Piersanti (former ESA PM) between March and July 2011: CaF2 lens blank: Thermal Vacuum Test Report - Filename: PLATO-CAMTOLE-RP-154-CNES, Issue 1, Rev. 0, Date: Jul 21st 2011, Prepared by: H. Pasquier - delivered to Piersanti Vibration Test Report: L3 CaF2 Vibration Test Dummy - Filename: Test_509_PLATO_dummy_lens_mount__report.pdf - Authors: M. Greber, D. Piazza, K. Seiferlin, P. Christiansen, 20th Jun 2011 - delivered to CNES and Piersanti PLATO TOU Breadboard/Prototype: Design and AIT Report filename: PLATO-INAF-TOU-RP-0013-issue02-rev0-2.pdf- Authors: J. Farinato, V. Viotto, D. Piazza et al., Issue 2, Rev. 0, Date: 13 Jul 2011 - delivered to CNES and Piersanti Catania, 11 June 2014 TOU Meeting

TOUs during PLATO 1.0 What we delivered – Unofficially 2/2 AlBeMet® Structure Procurement Report - author "APCO Technologies” – delivered to CNES on May 12 2011 Study on the aspherical lens performed by RUAG - delivered to CNES oo 18 Jul 2011 Less relevant… PLATO TOU - Letter of Interest - author: SAGEM/REOSC - delivered to Osvaldo Piersanti (ESA) (March 2011) PLATO TOU - Letter of Interest - author: SESO - delivered to Osvaldo Piersanti (ESA) (March 2011) Catania, 11 June 2014 TOU Meeting

TOUs during PLATO 1.0 What we left open Optical Design Consolidation see Magrin presentation for details Breadboard activities see Farinato et al. presentation for details Mechanical Design Finite Element Model of the current mechanical design, including evaluation of the first eigenfrequency. Interfaces Verification of the interfaces of the finite element model with the lenses and their effects. Filter design Engineering consolidation Catania, 11 June 2014 TOU Meeting

PLATO 2.0    TOU 2.0 Catania, 11 June 2014 TOU Meeting

PLATO 2.0 timeline – Phase B2 Jul 2014-Jan 2016 Premises Phase B1 kick-off: Jul 2014 Science Management Plan approval: Nov 2015 Payload Development and Consolidation Review: March 2015 SRR data package: 1 Nov 2015 SRR: completed by Jan 2016 Mission adoption & IPC approval: Feb-Mar 2016 Catania, 11 June 2014 TOU Meeting

PLATO 2.0 timeline – Phase B2C/D/E1 Q1 2016-Q1 2024 Premises Industrial ITT for Phases B2/C/D/E1: Apr-Sep 2016 Industrial Prime contractor kick-off: Oct 2016 System PDR: by 2017 (tbc) System CDR: by mid-2020 (tbc) Payload CDR by 2018 (tbc) Delivery of all Cameras: Q4 2021 PLATO Launch: Q1 2024 Catania, 11 June 2014 TOU Meeting

Phase B1: SRR Objectives 1/2 Premises PLATO Phase B1 objective is the adoption of the PLATO mission by SPC in Feb-March 2016. The PLATO System Requirements Review (SRR) to be completed by January 2016 is a major input to PLATO mission adoption. The SRR is a formal review (category 1 i.e organized by ESA inspector general, D/SRE is the chairman). The primary objective of the SRR is to review in detail: The final payload and spacecraft system specifications, The payload and spacecraft design definition, The payload and spacecraft development and verification program, Mission programmatic and cost. Catania, 11 June 2014 TOU Meeting

Phase B1: SRR Objectives 2/2 Premises The camera development schedule is critical, and is actually defining the schedule critical path for the spacecraft. Hence: The camera detailed design activities (including AIV plans and Ground System Equipment design) shall be completed before the SRR, The critical bread-boarding activities (e.g. electronics Demonstration Models, optics) shall be initiated during phase B1, Consortium input to the SRR shall demonstrate that the camera Engineering Model - which is fully representative of the flight model except for some electronics parts - will be completed by early 2017, A detailed development plan of the payload shall demonstrate by SRR that: serial production phase will start by mid-2017, the first batch of 8 cameras will be delivered in November 2020, the last batch of cameras will be delivered by November 2021. ?? Catania, 11 June 2014 TOU Meeting

TOUs during PLATO 2.0 Phase B1 goal Our proposal: deliver all ready but undelivered documents: Design: Consolidated TOU Design Report (Optical Design, Mechanical Design, Thermal Analysis, Stray-light Analysis, Optical Material Analysis and Coating Design, ..) Breadboard: Consolidated BreadBoard AIV report NEW: including a critical review of results and assessment of some open issues CaF2 tests AIV Design: Consolidated TOU MAIT and Management Plan Consolidated AlBeMet® Mechanical Structure Procurement Assessment Study NEW: F-TOU Filters Design Procurement Assessment Study

TOUs during PLATO 2.0 Phase B2 goal Design: Engineering of TOU Design (Optical Design, Mechanical Design, Thermal Analysis, Stray-light Analysis, Optical Material Analysis and Coating Design, ..) Breadboard  Prototype Lens set like the FM one (change of 2 lenses and replacement of one lens previously accepted with no conformance issue because short in time optical quality test (in term of PSF shape and dimension) on the whole FoV. AIV Design: Finalized TOU MAIT and Management Plan Finalized AlBeMet® Mechanical Structure Procurement Study Consolidated: F-TOU Filters Design Procurement Assessment Study Catania, 11 June 2014 TOU Meeting

When Industrial Prime Contractor? Our proposal: During Phase B1, industry will deliver consult and services. We’ll work to have ASI delivers a ITT for Phase B2/C contract, not later than March 2015. Goal: TOU Prime Contractor at work at beginning of Phase B2, but clearly identified before the SRR. Catania, 11 June 2014 TOU Meeting