Chad-Cameroon Pipeline: Summary Did the project finance create value for the sponsors? –Value creation is expected, or it would have used other types of.

Slides:



Advertisements
Similar presentations
TRADABLE PERMITS IN WATERWAY TRANSPORT JIM FAWCETT ECONOMIST GALVESTON DISTRICT.
Advertisements

Indian Institute of Management, Ahmedabad
Yale School of Management 1 Emerging Market Finance: Lecture 9: Valuation by Adjusting Cash Flow in Emerging Markets (based on article by Mimi James and.
1 Complete Markets. 2 Definitions Event State of the world State Contingent Claim (State Claim)  Payoff Vector  Market is a payoff vector Exchange dollars.
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
©2009 The McGraw-Hill Companies, All Rights Reserved ©2009 The McGraw-Hill Companies, All Rights Reserved Chapter 6 International Business McGraw-Hill/Irwin.
Simon Par Keeling, Société Générale Paris
MACROECONOMICS MACROECONOMICS and the FINANCIAL SYSTEM © 2011 Worth Publishers, all rights reservedPowerPoint® slides by Ron Cronovich N. Gregory Mankiw.
Fundamentals of Corporate Finance, 2/e
Chad-Cameroon Pipeline: Summary Did the project finance create value for the sponsors? –Gross Value: at least $15 million + value of time structuring the.
Introduction to Derivatives and Risk Management Corporate Finance Dr. A. DeMaskey.
Finance Lecture # 4 Jan H. Jansen
LIMITED/NON RECOURSE PROJECT FINANCE INTRODUCTION Introduction to Project Finance Presenter:
Relationships of Trade and Foreign Direct Investment Among China, Taiwan and the U.S. Hung-Gay Fung, Ph.D University of Missouri-St. Louis U.S.A.
1 (of 26) IBUS 302: International Finance Topic 12–Transaction Exposure I Lawrence Schrenk, Instructor.
Asymmetric Information
Chapter 15 International Business Finance Key sections –Factors affecting exchange rates –Nature of exchange risk and types –How control exchange risk?
An Overview of Financial Markets and Institutions
The Nature of Risk Management Alicia Garcia. What is it? A potential gain or loss that occurs as a result of an exchange rate change. A potential gain.
Finance 476 Instructor: Greg MacKinnon Introduction.
VII-Financing of Constructed Facilities The Financing Problem Institutional Arrangement for Facility Financing Avaluation of Alternative Financing Plans.
Foreign Exchange Risks International Investment. Exchange Risk Exposure Accounting exposure = (foreign-currency denominated assets) – (foreign-currency.
The standard view of CG (“The Shareholder Value Model”): Deals with the ways in which suppliers of finance to corporations assure themselves of getting.
Large-scale land development in Finland and in the Netherlands – comparative case study M. Sc. (Tech.) Eero Valtonen, Aalto University Prof. Erwin van.
Emerging Markets Finance Spring 2002 Wei Li Darden School of Business Acknowledgement: Some of the materials are drawn from IMF reports and from Professor.
INTERNATIONAL BUSINESS Chapter 7 Currency and Risk Management.
Chapter Twenty Financial Management in the International Business.
INVESTMENT AND FINANCING OF RENEWABLE ENERGY PROJECTS
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
Petroleum Development and Pipeline Project Team 2: Yusuf Akkoca Tom Bloom Karen Delton Shweta Hire Eric Johnson David Mahzonni.
1 Chapter 1: What is Finance? Copyright © Prentice Hall Inc Author: Nick Bagley, bdellaSoft, Inc. Objective To Define Finance The Value of Finance.
Principles of foreign exchange Chapter 4. Overview Trading one currency for another arises from the elements that make up a nation’s balance of payments:
SECOND BUSINESS ROUNDTABLE WITH THE GOVERNMENTS OF BOSNIA AND HERZEGOVINA Sarajevo, September PETER NICHOLL GOVERNOR CENTRAL BANK OF BOSNIA AND HERZEGOVINA.
Chapter 1 The Nature of Real Estate and Real Estate Markets Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Africa Rail 2009 Workshop 23 June 2009 Different Types of Financing for Mobile Equipment Greg McKenzie Head of Asset Finance, Investment Banking Division,
The Chad-Cameroon Petroleum Development and Pipeline Project
Introduction to the Financial System. In this section, you will learn:  about securities, such as stocks and bonds  the economic functions of financial.
OPIM 5894 Advanced Project management The Chad Cameroon Petroleum Development and Pipeline Project Team 3 Richard Buskey Jonathan Weiss Daniel Mahzonni.
General Electric – Risk & Cost of Capital Aspects of a deal Risk & Cost of capital Negotiation Strategy Deal Structure Approach Target Identifi- cation.
Country risk. Scope of the firm in emerging markets Benefits of conglomeration Focus is the mantra in New York/London. Good advice in emerging markets?
15-1 CHAPTER 15 INTERNATIONAL BANKING American International Banking l International banking dates back to the rise of international trade. l Great.
Managing Risk and Uncertainty in Carbon Finance Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30.
Financing of Infrastructure Projects:
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
Unit 7a Economics.
PPP International Best Practice and Regional Application Overview of Public Private Partnerships (PPPs) April, 2008 Tegucigalpa, Honduras Filip Drapak.
Dr Marek Porzycki Chair for Economic Policy.  Markets in which funds are chanelled from savers/investors (people who have available funds but no productive.
Leverage Buyouts Arzac, Chapter 13.
Public Private Partnerships (PPPs) and The World Bank
1 Chapter 12 Budget Balance and Government Debt. 2 Budget Terms A Budget Surplus exists when Tax Revenues are greater than expenditures and is the difference.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 16: Money, Prices, and the Financial System 1.Describe.
Management & Leveraged Buyouts
INTRODUCTION TO DERIVATIVES Introduction Definition of Derivative Types of Derivatives Derivatives Markets Uses of Derivatives Advantages and Disadvantages.
How Corporations Issue Securities Financial Institutions Student Presentations Venture Capital Initial Public Offering Other New Issue Procedures Subsequent.
Circular Flow Model and Economic Activity
An Economic Analysis of Financial Structure
Chapter 3: The American Free Enterprise System. Section 1: Basic Definition Free Enterprise System is another name for capitalism, and economic system.
©2009 McGraw-Hill Ryerson Limited 1 of International Financial Management Prepared by: Michel Paquet SAIT Polytechnic ©2009 McGraw-Hill Ryerson Limited.
Raising finance for a ULB Strengthening Urban Management ASCI / WBI Workshop, January 21, 2003.
The Scope Of Corporate Finance Professor XXXXX Course Name / Number.
Ch.5 Capital Markets This chapter looks at how capital market work by drawing on the models of the market. Imperfect information and uncertainty play an.
1. What would you do with $5,000? Be specific. 2. What percentage of taxes should the government take? 3. Where is the safest place to keep your money?
Agent Advantages to Seller Low Cost Quicker Entry Lower Time Commitment Can be a domestic sale US Laws pertain Disadvantages to Seller Low return Reduced.
“Ingredients” in good PPPs
Overview of Market Participants and Financial Innovation
An Overview of Financial Markets and Institutions
Dr Marek Porzycki Chair for Economic Policy
Preparing for Negotiation & Drafting Business Contracts
OECD/IOPS Global Forum on Private Pensions
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Presentation transcript:

Chad-Cameroon Pipeline: Summary Did the project finance create value for the sponsors? –Value creation is expected, or it would have used other types of finance. –Gross Value: at least $15 million + value of time structuring the deal. (It must have been worth it to spend the time and pay the $15 million in fees.) –Value net of PF transaction costs should be positive. –The fact that the sponsors used corporate finance for the field system suggests that transaction costs of PF are high. The incremental benefit of arranging a PF for the field system is exceeded by the incremental transaction cost. Important sources of the value –World Bank/ECAs participation mitigated political risk. The RMP constrains the party (Chad gov’t) who controls the risks. –Non-recourse debt shielded sponsors credit exposure. –PF structure allowed the use of higher leverage (higher value of tax shields, and reduced equity exposure). Compared to the Busang/Bre-X deal in Indonesia, Chad and Cameroon all got a pretty good deal. But the cash flows that Chad receives is “back-loaded”—it gets more of the cash flows later, rather than earlier. In other words, it ends up bearing more of the reserve risk than the sponsors.

Murphy’s Law Applied to Project Finance Project risks end up on those least able to resist them.

Poland’s A2 Motorway Infrastructure projects Sponsors announced 279 toll road projects in 26 countries worth US$61 billion from 1990 and 1999 (World Bank Private Participation in Infrastructure (PPI) database). Moody’s now rates $29 billion of toll road debt from 32 issuers. A2 is one of the larger road projects, certainly a milestone in the development of Eastern and Central European infrastructure.

(No Market Exists) Demand = f(GDP) Inflation Exchange Rates Interest Rates (Market Exists) Force Majeure (political Expropriation (taxes, regulation, enforcement) Currency Convertibility Currency Devaluation Force Majeure (Acts of God) Operator Performance Land Acquisition/Permits Cost Over-run/Delay Competing Roads/Railroads Support Roads (Infrastructure) Expropriation Environmental Risks Market Risks (e.g., country) Project Specific Risks Ability to Control LowHigh Macroeconomic and some Sovereign Risks Construction, Operating, and some Sovereign Risks Classification of Project Risks

(No Market Exists) BEAR INSURE (with political risk insurance) ALLOCATE (with contract and profit sharing) or DETER with MLA/BLA participation INSURE OR DIVERSIFY ALLOCATE (with contracts) Market Risks (e.g., country) Project Specific Risks Ability to Control LowHigh Generic Risk Management Strategies HEDGE (Market Exists) Influence

Principles of Risk Management  Allocate risk to the party that controls the risk or had the greatest impact on its outcome (effectiveness).  When possible and cost effective to do so, write a detailed contract specifying actions, quality, and performance. Contracts work best when the risks are identifiable, outcomes are verifiable, and contracts are enforceable. Predictable: note the difference between risk (known distributions) and uncertainty (unknown distributions) Verifiable: note the role of asymmetric information. Enforceable: note the importance of legal systems, property rights, and enforcement mechanisms.  Allocate risks to the party that can bear them at least cost (efficiency).  When negotiation, contracting, and other transaction costs make complete contracting unfeasible, allocate residual risk and return to align incentives and induce optimal behavior.  If possible, allocate asymmetric, downside risks to debt holders; allocate symmetric and upside risks to equity holders.

Murphy’s Law Applied to Project Finance Nature always sides with the hidden flaw. Anything you try to construct will take longer and cost more than you thought. If everything seems to be going well, you don’t know what is going on. The unexpected will always happen. Source: Fortin, R. Jay, Defining force majeure, Project and Trade Finance, Jan

Infrastructure Deal of the Year (Project Finance International). “A number of significant legal and financial structuring issues needed to be overcome to bring the project to financial close and we are delighted this has been achieved. The Polish Prime Minister, Jerzy Buzek, described the project as the most complicated financing ever carried out in Poland, and everyone involved should take that as a compliment.” (Mike Webster, Baker & McKenzie) “The deal marks the first public/private partnership in Poland and is a considerable turning point for project finance transactions for Central and Eastern Europe, given the absence of any such road infrastructure project in the region since Hungary’s 1996 M5 project.” “The deal is notable for being the first time the EIB has provided subordinated debt…(and) the first time the EIB has directly extended a 17-year facility to a project.” “(Many)…factors apparently contributed to a pricing [and structure] with no premium attached for being the first such project in Poland or for being dependent on uncovered revenues.”