Chapter 5 THE IMPORTANCE OF SCALE AND TIMING IN PROJECT APPRAISAL.

Slides:



Advertisements
Similar presentations
Net Present Value and Other Investment Rules Chapter 5 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Advertisements

Hospitality Financial Management By Robert E. Chatfield and Michael C. Dalbor ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ.
26-1 C APITAL B UDGETING LONG-RANGE PLANNING CHAPTER 26.
Capital Budgeting1 Select investments which increase value of firm Maximize wealth of shareholders Important to firm’s long-term success  Substantial.
Key Concepts and Skills
Hawawini & VialletChapter 7© 2007 Thomson South-Western Chapter 7 ALTERNATIVES TO THE NET PRESENT VALUE RULE.
© Prentice Hall, Chapter 8 Evaluating Investment Projects Shapiro and Balbirer: Modern Corporate Finance: A Multidisciplinary Approach to Value.
FI Corporate Finance leng Ling
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Average.
Managing Finance and Budgets Seminar 7. Follow-up Activities  Read Chapter 14 (including EPNV)  Describe key concepts: Purpose of Investment Appraisal.
Chapter 9 Net Present Value and Other Investment Criteria
Chapter 10 - Capital Budgeting
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Research question To what extent has investment assessment assisted a business to enhance its wealth.
© Harry Campbell & Richard Brown School of Economics The University of Queensland BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets.
GBUS502 Vicentiu Covrig 1 The basics of capital budgeting (chapter 11) Should we build this plant?
1 Chapter 11 The Basics of Capital Budgeting: Evaluating Cash Flows.
Investment Analysis Lecture: 9 Course Code: MBF702.
Internal Rate of Return A brief encounter. Contents Definition Worked Example Example Comparisons Meaning of Results Summary.
Chapter – 5 & 6: NPV & Other Investment Rules, Cash flows
Ch 6 Project Analysis Under Certainty
Economic Analysis Concepts. 2 Is the project justified ?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive.
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Last Study Topics FCF and PV NPV and its competitors The payback Period The book rate of return Internal rate of return.
BUSINESS ECONOMICS Class 6 1 and 2 December, 2009.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
Investment Decisions 04/22/08 Ch Pick Industries and Companies Each Group Picks Industry First and Second Choice Industries unique to a group Groups.
Capital Budgeting Chapter 9 © 2003 South-Western/Thomson Learning.
Chapter 7 Economic Principles Choosing Production Levels
Economic Optimization Chapter 2. Economic Optimization Process Optimal Decisions Best decision produces the result most consistent with managerial objectives.
BUA321 Chapter 10 Capital Budgeting Techniques. Capital Budgeting Terminology What kinds of projects are analyzed with capital budgeting? What is meant.
1 Chapter 7 Production Costs Key Concepts Summary Practice Quiz Internet Exercises Internet Exercises ©2002 South-Western College Publishing.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Average.
Chapter 15 Factor Markets Work is of two kinds: first, altering the position of matter at or near the earth’s surface relative to other matter; second,
Chapter 4 The Time Value of Money
Hawawini & VialletChapter 71 ALTERNATIVES TO THE NPV RULE.
1 ALTERNATIVE INVESTMENT CRITERIA Jenkins G. P, C. Y. K Kuo and A.C. Harberger,“Cost-Benefit Analysis for Investment Decisions” Chapter 4, Discounting.
COST-BENEFIT ANALYSIS
10-1 The Basics of Capital Budgeting Should we build this plant?
Accounting Principles, Ninth Edition
Ch 12: Capital Budgeting Decision Criteria
Unit 4 – Capital Budgeting Decision Methods
Chapter 6 Investment Decision Rules
Some Alternative Investment Rules
Class 3 Investment Decisions and Capital Budgeting.
Chapter 3 Arbitrage and Financial Decision Making
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
BNFN 521 INVESTMENT APPRAISAL Lecture Notes Lecture Three.
Chapter 2: The basic theory of interest
Capital Budgeting Decide how to invest money so that its value is maximized.
Capital Budgeting: Decision Criteria
Basics of Capital Budgeting. An Overview of Capital Budgeting.
The Basics of Capital Budgeting: Investment Criteria and
Introduction to Economics of Water Resources. Public or private Excludability (E): the degree to which users can be excluded Subtractability (S): the.
Capital Budgeting Decision Methods 1. Learning Objectives The capital budgeting process. Calculation of payback, NPV, IRR, and MIRR for proposed projects.
©2012 McGraw-Hill Ryerson Limited 1 of 45 Learning Objectives 4.Appraise the use of the cost of capital as the discount rate in capital budgeting analysis.
13-1 Chapter 13 Capital Budgeting Techniques © 2001 Prentice-Hall, Inc. Fundamentals of Financial Management, 11/e Created by: Gregory A. Kuhlemeyer, Ph.D.
TEL2813/IS2820 Security Management Cost-Benefit Analysis Net Present Value Model, Internal Rate of Return Model Return on Investment (Based on Book by.
Other Criteria for Capital Budgeting Text: Chapter 6.
Capital Budgeting Techniques. Capital budgeting is the process of evaluating capital projects, projects with cash flows over more than one year. The four.
Chapter 13. Objectives of the chapter Understand the payback period (PBP) method of project evaluation and selection, including its: (a) calculation;
DMH1. 2 The most widely accepted objective of the firm is to maximize the value of the firm. The financial management is largely concerned with investment,
Capital Budgeting Decision Rules
Capital Budgeting and Cost Analysis
Economic Concepts Christopher R. Bennett
Introduction to Economics of Water Resources Lecture 5
The Basics of Capital Budgeting: Evaluating Cash Flows
Net Present Value Bobby Strozak Steve Johnson.
The Capital Budgeting Decision
CAPITAL BUDGETING.
Presentation transcript:

Chapter 5 THE IMPORTANCE OF SCALE AND TIMING IN PROJECT APPRAISAL

Why is scale important? Too large or too small can destroy a good project One of the most important decision that a project analyst is to make is the "scale" of the investment. This is mostly thought as a technical issue but it has a financial and economic dimension as well. Right scale should be chosen to maximize NPV. In evaluating a project to determine its best scale, the most important principle is to treat each incremental change in its size as a project in itself

Why is scale important? (Cont’d) By comparing the present value of the incremental benefits with the present value of the incremental costs, scale is increased until NPV of the incremental net benefits is negative. (incremental NPV is called Marginal Net Present Value (MNPV) We must first make sure that the NPV of the overall project is positive. Secondly, the net present value of the last addition must also be greater than or equal to zero.

Choice of Scale Rule: Optimal scale is when NPV = 0 for the last addition to scale and NPV > 0 for the whole project Net benefit profiles for alternative scales of a facility C1 C2 C3 B1 B2 B3 B t - C t Time 0 NPV (B 1 – C 1 ) 0 ? NPV (B2 – C2) 0 ? NPV (B 3 – C 3 ) 0 ?

Determination of Scale of Project Relationship between net present value and scale NPV A Scale of Project 0 BCEDFGHIJLKMN (+) (-) NPV of Project

Internal Rate of Return (IRR) Criterion The optimal scale of a project can also be determined by the use of the IRR. Here it is assumed that each successive increment of investment has a unique IRR. Incremental investment is made as long as the MIRR is above or equal to the discount rate.

Table 5-1 Determination of Optimum Scale of Irrigation Dam (Cont’d) S0 S1 S2 S3 S4 S5 S Costs Benefits Year ScaleNPV 10%IRR Opportunity cost of funds (discount rate) = 10%

Table 5-1 Determination of Optimum Scale of Irrigation Dam S0 S1 S2 S3 S4 S5 S Costs Benefits Year ScaleNPV 10%IRR Opportunity cost of funds (discount rate) = 10%

Note: 1. NPV of last increment to scale 0 at scale S5. i.e. NPV of scale 5 = NPV of project is maximized at scale of 5, i.e. NPV 1-5 = IRR is maximized at scale When the IRR on the last increment to scale (MIRR) is equal to discount rate the NPV of project is maximized.

1. at Scale 3: Maximum point of MIRR (0.40) between Scale 3 and Scale 4: MIRR is greater than IRR; MIRR and IRR are greater than r 2. at Scale 4: Maximum point of IRR (0.143) and MIRR intersects with IRR between Scale 4 and Scale 5: MIRR is smaller than IRR; MIRR and IRR are greater than r 3. at Scale 5: MIRR is equal to Discount Rate between Scale 5 and Scale N: MIRR is smaller than IRR; MIRR is smaller than r; IRR is greater than r 4. at some Scale N: IRR is equal to Discount Rate Figure 5-3 Relationship between MIRR, IRR and DR Scale IRR>r SnSn MIRR<r Maximum IRR (0.14) Discount Rate (r) Opp. Cost of Funds (0.10) MIRR>r S3S3 S4S4 S5S5 Percent Maximum MIRR 

Figure 5-4 Relationship between MNPV and NPV 1. at Scale 3: Maximum point of MNPV ($3000) at 0.10 Discount rate 2. at Scale 4: Maximum point of NPV (zero) at 0.14 Discount Rate between Scale 0 and Scale 5: NPV is positive and NPV it increases 3. at Scale 5: Maximum point of NPV and MNPV is equal to zero between Scale 5 and Scale N: NPV is positive and it decreases 4. at some Scale N: NPV is equal to zero after Scale N: NPV is negative and it decreases $3010 $3000 Scale NPV (+) NPV(0.10) NPV(0.14) NPV(0.10) 0  S4S4 S5S5 SnSn 0 NPV (-) MNPV (0.10) Percent S3S3 Maximum NPV Maximum MNPV  

Figure 5-5 Relationship between MIRR, IRR, MNPV and NPV   

When MNPV is positive – NPV is increasing When MNPV is zero – NPV is at the maximum and MIRR is equal to Discount Rate When NPV is zero – IRR is equal to Discount Rate When MIRR is greater than IRR – IRR is increasing When MIRR is equal to IRR – IRR is at the maximum When MIRR is smaller than IRR – IRR is decreasing IRR is greater than Discount Rate as long as NPV is positive MIRR is greater than Discount Rate as long as NPV is increasing

Relationship between MIRR, IRR and NPV (cont’d.) Figure 5.5 gives the relationship between MIRR, IRR and NPV. MIRR cuts IRR from above at its maximum point. Scale of the project must be increased until MIRR is just equal to the discount rate. This is the optimal scale (S5). At the optimum scale NPV is maximum and MIRR is equal to the discount rate (10%). When NPV is equal to zero, IRR is equal to the discount rate (10%). To illustrate the procedure, construction of an irrigation dam which could be built at different heights is given as an example in Table 5.1.

Timing of Investments Key Questions: 1.What is right time to start a project? 2.What is right time to end a project? Four Illustrative Cases of Project Timing Case 1. Benefits (net of operating costs) increasing continuously with calendar time. Investments costs are independent of calendar time Case 2. Benefits (net of operating costs) increasing with calendar time. Investment costs function of calendar time Case 3. Benefits (net of operating costs) rise and fall with calendar time. Investment costs are independent of calendar time Case 4. Costs and benefits do not change systematically with calendar time

Case 1: Timing of Projects: When Potential Benefits Are a Continuously Rising Function of Calendar Time but Are Independent of Time of Starting Project rK IDE Time t0t0 t2t2 AC K B (t) rK t B t+1 rK t > B t+1 Postpone rK t < B t+1 Start <><> t1t1 K B1B1 Benefits and Costs

Timing for Start of Operation of Roojport Dam, South Africa of Marginal Economic Unit Water Cost Numbers of Years Postponed Economic Water Cost Rand/m 3

Case 2: Timing of Projects: When Both Potential Benefits and Investments Are A Function of Calendar Time rK t < B t+1 + (K t+1 -K t ) Start rK t >B t+1 + (K t+1 -K t ) Postpone rK 0 DE Time AC B (t) B1B1 t2t2 t3t3 K1K1 K0K0 K1K1 F IH t1t1 K0K0 G B2B2 0 Benefits and Costs

Case 3: Timing of Projects: When Potential Benefits Rise and Decline According to Calendar Time Time rK A C K0K0 B K Start if: rK t* < B t*+1 B (t) 0 K1K1 K2K2 I rSV t0t0 t1t1 t* tntn t n+1 SV Benefits and Costs Stop if: rSV t - B(t n+1 ) - ΔSV t > 0 ; SV t = SV t - SV t n n+1 n Do project if: NPV = ∑ i=t*+1 tntn > 0 - K t* + SV t n (1+r) t - t* n t* r (1+r) i-t* BiBi Do not do project if: NPV = ∑ t* r <0 i=t*+1 tntn (1+r) i-t* BiBi - K t* + SV t n (1+r) t - t* n

The Decision Rule If (rSV t - B t - ΔSV t ) > 0 Stop (ΔSV t = SV t - SV t ) < 0 Continue This rule has 5 special cases: 1. SV > 0 and ΔSV < 0, e.g. Machinery 2. SV > 0 but ΔSV > 0, e.g. Land 3. SV < 0, but ΔSV = 0, e.g. A nuclear plant 4. SV 0, e.g. Severance pay for workers 5. SV < 0 and ΔSV < 0 e.g. Clean-up costs

Timing of Projects: When The Patterns of Both Potential Benefits and Costs Depend on Time of Starting Project t0t0 t1t1 t2t2 A C K0K0 B K0K0 Benefits From K 1 K1K1 0 tntn t n+1 K1K1 D Benefits From K 0 Benefits and Costs