Master Schedule Building Presented by the MIS Department Northwest Regional ESD A Quick Overview.

Slides:



Advertisements
Similar presentations
Stage 2: Pathway Selection, Course Selections, & Tallies.
Advertisements

Who Put “Instructional Monitoring” On My To Do List? Suggestions for Principals M. Ann Levett, Ed.D.
Aspen Practical Scheduling Concepts SCH01 Patty White.
Software Quality Assurance Plan
Evaluation Team Chair Training Presented By Dr. Tim Eaton TRACS Regional Representative.
Master Schedule Building Mark Hannan, Principal Therese Gerlits, Assistant Principal Silverton High School.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Scheduling Requests and Request Reports Presented by: Sara Sayasane Presented by:
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
Structured Learning Assistance (SLA) and Training for Success Jim Valkenburg Delta College.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 11 Requirements Workshops
Record of School Achievement: Requirements for Students with Special Education Needs Key Messages.
Master Schedule Building What Building Principals Need To Know.
Webinar Training Series Master Schedule Builder Overview.
What happens next?. Contents Making your choices Late applications/UCAS Extra What is Clearing? Results day Your grades and what to do next Vacancy listings.
th Grade Registration Procedures (Class of 2016) Mason High School.
“It‘ll Be Here Before You Know It!” What you’ll need to know to get your child ready for High School.
1 Coordinated Timetable Process effective
The ABCs of Creating Your Own “Online Day”. What is an Online Day? Students remain at home Students remain at home Teachers prepare online assignments.
AzMERIT/AIMS Science Pre-Test Training for School Teachers & Staff Spring
Software Inspections. Defect Removal Efficiency The number of defects found prior to releasing a product divided by The number of defects found prior.
Presented by: Macomb Intermediate School District Management Technology Department and Dave Swanson.
Press the F5 key to continue Project Manager is a web based Project Management Tool. All your work is done and information stored on the internet cloud.
Understanding the Rules SCH04 Mary Anne Raymond. Define Scheduling Rules Use scheduling rules to alert the system of any constraints that are tied to.
Scheduling Help for Career Academies and SLCs The Agenda 1. Introduction 2. Workshop Goals 3. Scheduling Guide 4. Group Activity 5. Software Options.
Master Schedule Theory Discovering your options….
Scheduling with Campus © 2008 Infinite Campus. All Rights Reserved. DL Jeanie Ponder Technology Trainer K-12 Solutions Group.
Stage 1: Planning, Design & Preliminary Tasks Master Scheduling for Academies, Pathways, & Smaller Learning Communities.
ANTs PI Meeting, Nov. 29, 2000W. Zhang, Washington University1 Flexible Methods for Multi-agent distributed resource Allocation by Exploiting Phase Transitions.
Guest Cycle A division of the flow of business through a hotel that identifies the physical contacts and financial exchanges between guests and hotel employees.
Craig Rutan, Curriculum and Instruction Council Chair 2013 Fall Academic Senate Retreat.
Effective Scheduling 2009 Leadership Retreat Carolyn Williamson Senior Teacher Lee-Davis High School A Beautiful Mind helps, but you do NOT need to be.
Module 11 Session 11.1 Visual 1 Module 11 Executing and Controlling the Work Session 11.1 Managing Execution: Executing and Controlling the Work.
Secondary Master Schedule Development Lesson 4: Finalizing the Master Schedule Amy Illingworth Susan Skinner.
Stage 3: Building the Master Schedule. Phases in the Master Building Process Implementing Common Planning Time for Pathway/Academy/SLC Teaching Teams.
High School Schedule Notes for School Board Meeting
Copyright © 2006, Infinite Campus, Inc. All rights reserved. Scheduling: Using Theory to Generate Best Practice.
Scheduling Terminology and Concepts. Objective Introduce the Build view and the layout Provide an overview of new terminology and concepts in MyEdBC Provide.
MAP the Way to Success in Math: A Hybridization of Tutoring and SI Support Evin Deschamps Northern Arizona University Student Learning Centers.
Stage 4: Analysis, Adjustment, & Distribution of Schedules.
Information Technology Solutions for Education Elementary Scheduling May 16, 2011 (release date TBD)
Workshop designed for San Francisco Unified School District Pupil Services Department Workshop designed for Secondary School District Dr. Patricia Fioriello.
Integrated National Education Information System (iNEIS TM ) Training Slides – Manage School Resources: Scheduling & Timetable.
Census Processing Baku Training Module.  Discuss:  Processing Strategies  Processing operations  Quality Assurance for processing  Technology Issues.
It’s Time to Build! SCH06 Stephen Rando. Agenda Schedule build process Room management Validating Running/analyzing the build Running/analyzing the load.
Elementary School Administration and Management GADS 671 Section 55 and 56.
Daily Math Review 2 nd Grade February 6, :30 – 3:45pm.
Zimmerly Response NMIA Audit. Faculty Response Teacher input on Master Schedule. Instructional Coaches Collaborative work. Design and implement common.
Bridgewater-Raritan Regional School District Program Evaluations A summary of recommendations from the completed program evaluations March 6, 2009.
Day in the Life (DITL) Production Operations with Energy Builder Copyright © 2015 EDataViz LLC.
Y1 SBT Workshop EYFS Input Please ensure you have registered your name before you take a seat.
Scheduling Terminology and Concepts. Objective Outline the training strategy for Scheduling in MyEdBC Introduce the Build view and the layout Provide.
West Virginia University Academic Scheduling April 2009.
Taming the Scheduling Beast- Creating a Secondary Master Schedule Jennifer Wagner – School Counselor & Department Chair Stacy Cook - Principal.
Master Schedule Building. Intervention Time Before… Define the role of classroom teachers in interventions Structure your resources to the correct level.
SLC Master Schedule Implementation From “Paper to Practice” Mike Neubig
The Basics of Master Schedule Building Ken Wagner, Ed.D. Principal, Rancho Mirage High School.
Voluntary Pre-K: SIS Data Entry Good morning.
Promoting Inclusion with Classroom Peers
Please me that you were in attendance today
Completion of Educational Pathways
Macomb Intermediate School District Management Technology Department
Terminology and Concepts
Brainstorming & Project Management
A summary of part 1 of Chapter 7 CEP 812 Kay Paff March 24, 1999
Macomb Intermediate School District Management Technology Department
Title I Annual Meeting Pinewood Elementary, August 30, 2018.
College Work Readiness Assessment
ABC Unified School District
Small School Master Scheduling with Big School Aspirations
Presentation transcript:

Master Schedule Building Presented by the MIS Department Northwest Regional ESD A Quick Overview

The Goal of this Training Over-view of the scheduling process. Provide helpful documentation. Is NOT meant to be a comprehensive training. Everyone should attend a full-blown Master Schedule Building Workshop.

What do you need to make a good schedule? Good data A good team A good process

Scheduling Philosophy: STUDENTS E A C H E ROOMS S Schedule around the Students – not the teachers! The children’s needs come first. The schedule is designed to deliver the curriculum to the student.

Establish a Scheduling Team – Why? 1.Division of labor 2.Developing backup plans 3.Provide more options for problem solving

Who should be involved in the Scheduling Team? 1.Administration official(s) 2.Guidance counselors. 3.Software Technicians. 4.Department Chairs/Lead Teachers. Like to haves: Teacher notes on how they’d like to have the course they teach scheduled (for example, German language courses taught by a teacher placed back to back, if they also happen to teach math).

Balance Issues – How to minimize conflict? 1.A conflict - 2 or more courses that meet only in the same time period. 2.On the first run of the schedule builder, allow seats to overfill. 3.Change the Master Schedule.

Scheduling Time-line It is important to develop a scheduling time-line. Start at the end, and work your way forward. Establish when you want to have schedules to the students.

Phases of the Scheduling Process: Phase 1 – Preliminary Tasks Phase 2 – Tally Phase 3 – Construction Phase 4 – Analysis & Adjustment Phase 5 – Final Tasks Invest time in Phases 1 – 3, to avoid too much time spent in Phase 4.

Phase 1 – Preliminary Tasks Review & update Curriculum Determine which courses will be offered this year. Review parameters & constraints List all school parameters List all constraints Note team-teaching arrangements, where applicable.

Understand the factors that impact the Master Schedule Curriculum –Number of courses vs. number of students –Percentage of Singletons & Doubletons –Average number of courses selected by a student –Average student density (percent of time scheduled for class) Parameters –Number of periods in a day (more periods add flexibility, but shorten the class) –Number of days in the cycle (more increases complexity & potential for conflict) Organization Facilities Staff Constraints

A constraint is any existing condition which limits or restricts the scheduler in placing course sections in the Master Schedule. Examples: Curricular Constraints –Locked in Singletons, Doubletons & Multi-section courses. –Double period lab sessions –Work study programs –Blocks –Dovetailing courses

More Constraints Examples: Teacher Constraints –Part-time/shared-time teachers –Team teaching –Interdisciplinary teaming –Period assignment requests by teachers –Negotiated agreements Facility Constraints –Specialty rooms used by several teachers –High room density –Shared rooms Other constraints –Late arrival –Early dismissal

There are three key criteria that determine how well the Master Schedule has been constructed: 1.How well the student course selections have been satisfied. 2.The extent to which there is acceptable enrollment balance in multiple section courses. 3.The extent to which the Master Schedule is able to satisfy teacher requests related to course assignment preference.

Phase 2 – Tally Advertise Curriculum, collect student course selections, & print initial tally Edit student course selections Finalize course offerings & make sectioning decisions

Phase 2 – Tally (continued) Print final tally & conflict matrix Determine resource needs & review assignments Prepare Schedule Board, section chips, & Order of Placing Sections.

The Importance of section chips Contributes to the visual effect. Provides a wealth of data that would otherwise have to be looked up. The chips can be different shapes and should be different colors.

The Importance of ‘Order of Placing Sections’ The ‘Order of Placing Sections’ is the Master Schedule building “game plan.” It ensures that there will be a flow and a logical sequence. The tally provides much of the information.

Phase 3 – Construction Build the Master Schedule –Use the conflict matrix. –Courses to be offered, the number of course sections for each course, and the teacher & room assignments are extremely important. Use the Schedule Board to assist in visualizing the process –Make sure that you have someone record it! –A digital camera works well for this. It’s important to look for errors/problems all along the process.

The “Ideal Schedule” The “Ideal Schedule” would have all core classes in the morning, followed by Physical Education and Electives in the afternoon. The Problem – It can’t work, due to constraints such as teacher availability and rooms. The Goal – Spread out the core classes evenly throughout the day.

Order of schedule building: Try to do the following in the same sitting: 1.Singletons 2.Doubletons 3.Constraints

Order of schedule building, Pt 2: Do the following in a different sitting: Multiple section courses Offer each section in as many periods as possible! Place the section in the period with the fewest seats allocated for the grade(s) involved.. Visually scan your Board to make sure that the sections are offered in different periods throughout the year. Visually scan your Board to make sure that the sections are offered in different periods throughout the day.

Phase 4 – Analysis & Adjustment The Master Schedule Board has been built – now it is time to load the software. –Use a computer software program to load (schedule) the students. –Use reports from the software program to analyze the results, and then adjust the Master Schedule accordingly.

Phase 4 – Analysis & Adjustment Load students into Master Schedule: –Students are loaded into the Master Schedule by combining input from the courses & sections to be offered and the student course selections. –This process may be repeated one or more times, depending upon the quality of the Master Schedule that you built. –The better the Master Schedule, the fewer times you will have to load the students to get the best results.

Phase 4 – Analysis & Adjustment Analyze results & adjust Master Schedule. –If the scheduling results are not as good as you need, make changes to the Master Schedule and load the students again. –Things can get worse, as well as better….

Phase 4 – Analysis & Adjustment Resolve final conflicts by adjusting individual student course selections. –If necessary, resolve final conflicts by adjusting student course selections. This is a last resort! –When possible, adjust the Master Schedule to fit the needs of the students.

Phase 5 – Final Tasks The Master Schedule has been adjusted so that you have the scheduling results that you want. After these final tasks, you are ready to start school. –Identify & assign study halls. –Produce final reports.