IWLC2010Walter Wuensch19 October 2010 Progress on CLIC rf structures.

Slides:



Advertisements
Similar presentations
Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
Advertisements

Choke-mode Damped X-band Structure for CLIC Main Linac Hao ZHA, Jiaru SHI CERN Sep 27, 2011 Jiaru Shi, LCWS11 Workshop, Granada1.
Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
CLIC drive beam accelerating (DBA) structure Rolf Wegner.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
X-band Structures Test Results at NLCTA Faya Wang Chris Adolphsen, Christopher Nantista 9-Feb-11.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Working Group 1: Microwave Acceleration Summary 10 July 2009.
CLIC MAIN LINAC DDS DESIGN AND FORTCOMING Vasim Khan & Roger Jones V. Khan LC-ABD 09, Cockcroft Institute /14.
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Course B: rf technology Normal conducting rf Part 5: Higher-order-mode damping Walter Wuensch, CERN Sixth International Accelerator School for Linear Colliders.
An Overview of the CLIC Testing Program W. Wuensch CLIC ACE
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
Overview of the CLIC RF Structure Development Program W. Wuensch Second Collaboration Meeting on X-band Structures KEK,
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
X-Band: test stand and structure program
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Higher-Order Modes and Beam-Loading Compensation in CLIC Main Linac Oleksiy Kononenko BE/RF, CERN CLIC RF Structure Development Meeting, March 14, 2012.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
Overall strategy for the rf structure development program W. Wuensch CLIC ACE
PBG Structure Experiments, AAC 2008 Photonic Bandgap Accelerator Experiments Roark A. Marsh, Michael A. Shapiro, Richard J. Temkin Massachusetts Institute.
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Fifth International Linear Collider SchoolW. Wuensch 30 October 2010 Room Temperature rf High Gradients: Physics, rf design and Technology When Maxwell’s.
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
TWO-BEAM, MULTI-MODE, DETUNED ACCSELERATING STRUCTURE S.Kazakov 1,2, S.Kuzikov 3, V.Yakovlev 4 J.L. Hirshfield 1,5, 1 Omega-p,Inc., 199 Whitney Ave., New.
W. Wuensch CLIC project meeting High-power rf structure testing.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
Some Results and Analysis from CTF3 1HG2012-April-18 Some Results and Analysis from CTF3 W. Farabolini - A. Palaia.
Accelerating structure and PETS baseline parameters and layouts - selected issues W. Wuensch
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Overall strategy for the rf structure development program W. Wuensch CLIC ACE
Review of the rf working group of the ICFA Mini Workshop on Novel Accelerators and Colliders which was associated with the Bob Siemann Memorial Symposium.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
1 Design and objectives of test accelerating structures Riccardo Zennaro.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Update on PETS experiments (Igor for the CLIC collaboration)
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
High Power Crab Cavity Testing Ben Woolley HG2016 Argonne National Lab. 8 th June 2016.
2010 TESTING PROGRAM AND RESULTS FOR THE CLIC PETS X-BAND WORKSHOP ON RF STRUCTURES, BEAM DYNAMICS AND SOURCES 2 nd December 2010 Alessandro Cappelletti.
Test Accelerating Structures Designs, Objectives and Critical Issues
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
Status of the CLIC main beam injectors
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Brief Review of Microwave Dielectric Accelerators
Review of rf structure test results
Testing Infrastructure, Program and Milestones
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
Progress in the design of a damped an
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

IWLC2010Walter Wuensch19 October 2010 Progress on CLIC rf structures

IWLC2010Walter Wuensch19 October 2010 Outline 1.Accelerating structures 2.PETS (rf power generating structures) 3.Coupled rf system 4.Breakdown simulation 5.Outlook

IWLC2010Walter Wuensch19 October 2010 Accelerating structures – specifications High-gradient: MV/m loaded gradient (flat top)/240 (full) ns pulse length 3.<4x10 -7 /pulse/m breakdown rate Beam dynamics: mm diameter minimum average aperture (short range transverse wake) 2.< 1 V/pC/mm/m long-range transverse wakefield at second bunch (approximately x50 suppression).

IWLC2010Walter Wuensch19 October 2010 H s /E a E s /E a S c /E a 2 Accelerating structures – features S c ½ [MW/mm 2 ] E s max [MV/m] E acc [MV/m] ΔT [°C] dashed – unloaded solid – loaded

IWLC2010Walter Wuensch19 October 2010 Accelerating structures – manufacture TD18#3 at SLAC TD18#2 at KEK Stacking disks Temperature treatment for high-gradient Structures ready for test

IWLC2010Walter Wuensch19 October 2010 Our baseline treatment for high-gradient was developed by the NLC/JLC program. Our current understanding of why exactly it works is emerging from our ongoing breakdown physics study. Crystal dislocations appear to be the cause of our gradient limit (ok, there is still a debate!). 1.Etching –Etching occurs preferentially at dislocations due to lower local work function. This is particularly important for milled surfaces, which have significant induced stress and consequently high dislocation density. Also removes particles °C hydrogen fire– Near melting point results in significant annealing. Relieves stresses and reduces dislocation density. Excellent removal of chemical contaminants. Preparation for high-gradients

IWLC2010Walter Wuensch19 October 2010 Prototype accelerating structure test areas (klystron based) NLCTA at SLACNextef at KEK

IWLC2010Walter Wuensch19 October 2010 Structure type FabricationTest location Total testing time [hr] Unloaded gradient [MV/m] Flat top pulse length [ns] Breakdown rate [1/pulse/meter] T18KEK/SLACSLAC x10 -6 T18KEK/SLACKEK x10 -7 T18KEK/SLACSLAC x10 -5 T18CERNSLAC x10 -6 TD18KEK/SLACSLAC (a)2302.4x (b)2307.6x10 -5 TD18KEK/SLACKEK (a)2522x (b)2521.4x10 -5 T24KEK/SLACSLAC x10 -5 TD24CERNTBTS <1 (0.8Hz) 55≈ 100O(10 -2 ) Summary of CLIC accelerating structure test results conditioning continues (a) BDR specification run (b) gradient specification run

IWLC2010Walter Wuensch19 October 2010 Scaling to CLIC conditions: Scaled from lowest measured BDR to BDR=4*10 -7 and  =180 ns (CLIC flat-top is 170 ns), using standard E 29  5 /BDR =const. Correction to compensate for beam loading not included – expected to be less than about 7%. T18 by KEK/SLAC at SLAC #1 T18 by KEK/SLAC at KEK T18 by CERN at SLAC TD18 by KEK/SLAC at SLAC TD18 by KEK/SLAC at KEK unloaded gradient [MV/m] Synthesis of accelerating structure test results scaled to CLIC breakdown rate T24 by KEK/SLAC at SLAC Total testing time [hr] T18 by KEK/SLAC at SLAC #2 280 HOM damping Higher efficiency

IWLC2010Walter Wuensch19 October 2010 A new level of care for CERN-built structures Operation done under laminar flow Individual inspection Boxes under N2 Sealed bag under N2 RF measurement

IWLC2010Walter Wuensch19 October 2010 And now some very recent news! Points of enhanced breakdown rate in TD18 tested at SLAC probably identified. Origin seems to be a combination incomplete bonding and high surface currents. Damping waveguide Inner cell Study of origin of problem and corrective action underway.

IWLC2010Walter Wuensch19 October 2010 Breakdown rate evolution with extended running TD18 test at KEK

IWLC2010Walter Wuensch19 October 2010 Accelerating structures – next steps Resolve issue of enhanced breakdown rate in damped structures Verify performance of nominal design (T24) structure Put the two together for TD24 Add damping material (n.b. CTF3 drive beam linac has ≈ 2000 SiC loads plus PETS-test described below) Add compact coupler Statistics Structure yield – roughly ¼ of structures are down on gradient by about 10-20% for baseline fabrication procedure. Now need to build and test a few tens of structures to work out bugs. Low breakdown rate running – run below our BDR specification pulses takes 2.3 days… Extended running – generally the structures improve with time but we have seen a hot iris develop once (first T18 at SLAC).

IWLC2010Walter Wuensch19 October 2010 PETS – specifications High-power: MW output power (flat top)/240 (full) ns pulse length 3.<2x /pulse/m breakdown rate Beam dynamics: 1.Fundamental mode: gives 23 mm diameter aperture which corresponds to a/ =0.46 and v g /c=0.49 to give 2.2 kΩ/m, longitudinal impedance 2.Single bunch transverse wake: < 8 V/pC/mm/m 3.Long-range transverse wakefield with effective suppression of main HOMs by Q n (1-  n )<8 each

IWLC2010Walter Wuensch19 October 2010 Surface electric field Surface magnetic field PETS – fundamental mode characteristics Beam-driven structure so power rises quadratically with current and length, 135 MW for 100 A beam 213 mm active length Maximum fields at output with values, E surf =56 MV/m ΔT=1.8 (H surf =0.08 MA/m) S c =1.2 MW/mm 2

IWLC2010Walter Wuensch19 October 2010 PETS – HOM suppression features ACE3P analysis of HOM properties GdfidL and ACE3P benchmarking with analysis of PETS HOM properties PETS for high-power testing with SiC absorbers installed.

IWLC2010Walter Wuensch19 October 2010 PETS – the high-power testing challenge To high-power test the PETS in nominal conditions would require a 100 A driving beam. “Waveguide” test with klystron/pulse compressor not many 135+ MW X-band power sources – ASTA at SLAC much harder to run, full fields at input Beam-based tests with CTF A beam mm long PETS Connect output to input – beam-driven rf resonant ring for lower, <10 A, current Fields in CLIC and CTF3 at high current Fields in klystron and recirculation tests

IWLC2010Walter Wuensch19 October 2010 PETS testing in ASTA Two klystrons 50 SLED II with variable length and iris reflection Experimental area Uncompressed arm Gate valve Rf Phase shifter ASTA layout PETS waveguide-mode PETS testing is being done at ASTA in SLAC an impressive facility but testing a single object with 135+ MW power is very challenging. The results you will see are a mixture of conditioning of the PETS and ASTA…

IWLC2010Walter Wuensch19 October 2010 load ReflectionTransmission ASTA test PETS version with damping slots and damping material (SiC) Low RF power measurements June 2010

IWLC2010Walter Wuensch19 October 2010 Average and peak power distributions Peak power Ave power Energy BD PETS conditioning and “nominal power” run Typical RF pulse shape in ASTA during last 110 hours

IWLC2010Walter Wuensch19 October 2010 Part of the statistical distribution contributed to the BDR calculation 1.55x10 7 pulses were accumulated in a 125 hour run. 8 PETS breakdowns were identified giving a breakdown rate of 5.3x10 -7 /pulse. Most of the breakdowns were located in the upper tail of the distribution, which makes BDR estimate rather conservative. During the last 80 hours no breakdowns were registered giving a BDR <1.2x10 -7 /pulse. Extraction of PETS breakdown trip rate 1.55x10 7 pulses

IWLC2010Walter Wuensch19 October 2010 TBTS and rf structures in CTF3

IWLC2010Walter Wuensch19 October 2010 PETS power performance status Power in recirculation mode after 3x10 5 pulses (less than 2 hours to compare to 50/60 Hz repetition rate klystron test).

IWLC2010Walter Wuensch19 October 2010 Drive beam ON Coupled rf system with acceleration Two-beam acceleration now starting at X-band (We used to do this all the time at 30 GHz). Energy gain corresponds to 55 MV/m.

IWLC2010Walter Wuensch19 October 2010 The new kid on the block The SLAC-built GHz klystron (XL- 5) for the CLIC structure testing area is now at CERN! This is an extraordinarily important event for CLIC. We clearly need more power sources to have the capacity to test the many tens of structures needed for the next stage of structure development. The bar graph of accelerating structure performance on slide 8 needs to become a histogram.

IWLC2010Walter Wuensch19 October Emission site formation – breakdown rate 3. Field emission to breakdown trigger, including thermal effects Multi-scale simulation of breakdown developed by the Helsinki Institute of Physics E max ↑E0↑E0 JeJe JeJe 1. Calculation of charge distribution in crystal Force Fixed atoms

IWLC2010Walter Wuensch19 October 2010 Multi-scale simulation of breakdown developed by the Helsinki Institute of Physics 4. Breakdown ignition and plasma formation 5. Surface damage mechanism

IWLC2010Walter Wuensch19 October 2010 Outlook 0.1 GV/m acceleration looks feasible GW two-beam power production actually looks rather straightforward. Need to go from performance of individual structures to statistics. We start to understand what is going on rather well.

IWLC2010Walter Wuensch19 October 2010 It has been my privilege to present highlights of scientific and technical work made by the combined effort of groups from roughly 35 institutes based in 17 countries – my sincere thanks to all you! I hope that many of you will be able to attend working group 4 to discuss this work in greater detail and meet the people who are actually doing the work! You are all also welcome to participate in our poster session on Wednesday afternoon. Acknowledgements