Sampling Inspection.

Slides:



Advertisements
Similar presentations
Prepared by Anthony Lizza Penn State University
Advertisements

a form of inspection applied to lots or batches of items before or after a process to judge conformance to predetermined standards Lesson 15 Acceptance.
Ch 12- Control Charts for Attributes
Introduction to Statistical Quality Control, 4th Edition Chapter 14 Lot-by-Lot Acceptance Sampling for Attributes.
4/24/2015IENG 486 Statistical Quality & Process Control 1 IENG Lecture 19 Introduction to Mil Std 105E.
Chapter 9A Process Capability and Statistical Quality Control
Chapter 9A. Process Capability & Statistical Quality Control
Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Example R-Chart.
Lecture 26 Quality inspection systems. Quality Inspection Systems  There are four systems which are used in industry – 4-point system – 10 point system.
ISQA 572/ 449 Models for Quality Control/ Process Control and Improvement Dr. David Raffo Tel: , Fax:
13–1. 13–2 Chapter Thirteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Acceptance Sampling for Attributes Statistical Quality Control
Quality Control Chapter 9- Lot-by-Lot Acceptance Sampling
Section 7 Acceptance Sampling
Acceptance Sampling Acceptance sampling is a method used to accept or reject product based on a random sample of the product. The purpose of acceptance.
1 IES 331 Quality Control Chapter 14 Acceptance Sampling for Attributes – Single Sampling Plan and Military Standard Week 13 August 30 – September 1, 2005.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management Chapter 3 Supplement Roberta Russell &
BPT2423 – STATISTICAL PROCESS CONTROL
15 Lot-by-Lot Acceptance Sampling for Attributes Chapter 15
Myth: “Acceptance sampling assures good quality.” Truth: Acceptance sampling provides confidence that p (the population fraction.
J0444 OPERATION MANAGEMENT SPC Pert 11 Universitas Bina Nusantara.
1 © The McGraw-Hill Companies, Inc., 2004 Technical Note 7 Process Capability and Statistical Quality Control.
CHAPTER 8TN Process Capability and Statistical Quality Control
Statistical Process Control
MIM 558 Comparative Operations Management Dr. Alan Raedels, C.P.M.
TM 720: Statistical Process Control Acceptance Sampling Plans
Lot-by-Lot Acceptance Sampling for Attributes
Acceptance Sampling Lot-by-lot Acceptance Sampling by AttributesLot-by-lot Acceptance Sampling by Attributes Acceptance Sampling SystemsAcceptance Sampling.
Chapter 11 Quality Control.
1 1 Slide | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | UCL CL LCL Chapter 13 Statistical Methods for Quality Control n Statistical.
An AQL System For Lot-By-Lot Acceptance Sampling By Attributes
1 TRAINING SESSION ACCEPTANCE SAMPLING CONFIDENCE INTERVALS.
CHAPTER 10 Quality Control/ Acceptance Sampling McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The.
Quality Control Prof. R. S. Rengasamy Department of Textile Technolgoy
Statistical Quality Control/Statistical Process Control
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 8 Process Capability and Statistical Quality Control.
Statistical Process Control Chapters A B C D E F G H.
9/17/2015IENG 486 Statistical Quality & Process Control 1 IENG Lecture 18 Introduction to Acceptance Sampling, Mil Std 105E.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10S Acceptance Sampling.
Chapter 13 Statistical Quality Control Method
Acceptance Sampling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Statistical Quality Control/Statistical Process Control
Statistical Quality Control
Acceptance Sampling Outline Sampling Some sampling plans
Operations Fall 2015 Bruce Duggan Providence University College.
 What type of Inspection procedures are in use  Where in the process should inspection take place  How are variations in the process detected before.
1 © The McGraw-Hill Companies, Inc., Technical Note 7 Process Capability and Statistical Quality Control.
1 SMU EMIS 7364 NTU TO-570-N Acceptance Sampling Basic Concepts and Mathematical Basis Updated: Statistical Quality Control Dr. Jerrell T. Stracener,
Acceptance Sampling Terminology
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 10S Acceptance Sampling.
1 1 Slide © 2003 South-Western/Thomson Learning™ Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Capability and Statistical Quality Control.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Technical Note 8 Process Capability and Statistical Quality Control.
Lot-by-Lot Acceptance Sampling for Attributes
Double and Multiple Sampling Plan
TM 720: Statistical Process Control Acceptance Sampling Plans
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Acceptance sampling Process of evaluating a portion of the product/material in a lot for the purpose of accepting or rejecting the lot as either conforming.
Introduction to Variability
What will be covered? What is acceptance sampling?
The Certified Quality Process Handbook Chapter 18: Sampling
Acceptance Sampling Outline Sampling Some sampling plans
What will be covered? What is acceptance sampling?
Chapter 11 Quality Control.
ACCEPTANCE SAMPLING FOR ATTRIBUTES
Acceptance Sampling May 2014 PDT155.
Statistical Quality Control, 7th Edition by Douglas C. Montgomery.
Statistical Quality Control
Presentation transcript:

Sampling Inspection

Inspection’s role and type Although the modern QM emphasizes the principle of prevention in advance, sampling inspection has still its special role, especially in inspecting the quality of raw material, WIP and finished goods. Inspection: a. no inspection b. Acceptance sampling c. 100% inspection

When to use acceptance sampling? When testing is destructive. When the cost of 100% inspection is high. When 100% inspection is not technologically feasible or would require so much calendar time and/or expenses. When there are many items to be inspected and the inspection error rate is high. When the vendor has an excellent quality history, and some reduction in inspection from 100% is desired. When there are potentially serious product liability risks.

Acceptance Sampling Purposes Determine quality level Ensure quality is within predetermined level 4

Advantages of Acceptance Sampling Less expensive because of less inspection. There is less handling damage of the product. It is applicable to destructive testing. Fewer personnel are involved in inspection activities. It often greatly reduces the amount of inspection error. The rejection of entire lots often provides a stronger motivation to the vendor for quality improvement.

Disadvantages of Acceptance Sampling Risks of accepting ”bad” lots and rejecting “good” lots. In the “good” lot, there might be nonconformities. Sample provides less information than 100-percent inspection Acceptance sampling requires more time on planning and documentation of the acceptance sampling procedure. 5

Data Type Attribute Data:Only conformity and nonconformity Variable Data :length, width etc. -- Liberman, G. J., and G. J. Resnikiff(1955).”Sampling plans for Inspection by variables”Journal of Quality Technology, Vol. 29, No.2.

Types of Acceptance sampling Plans Single-sampling plan Double-sampling plan Multiple-sampling plan Sequential-sampling plan

Single-sampling plan (N, p) (n,c) Total number :N Acc the lot The proportion of defects :P Acc the lot Sn≦C (n,c) (N, p) Reject the lot Sn>C Where Sn is the number of the actual defects in the sample.

Double-sampling plan (N, p) (n,c1 ,r1) Acc the lot (n1+n2, c2) Reject the lot Sn1≦c1 Sn1>c1 (n1+n2, c2) c1<Sn1<r1 S(n1+n2) ≦c2 S(n1+n2) >c2 (N, p)

Multiple-sampling plan (n,p) Acc the lot Reject the lot Sn1≦c1 Sn1>c1 (n1+n2) c1<Sn1<r1 S(n1+n2)<r2 S(n1+n2)≧r2 (n1+n2+n3) c2<S(n1+n2)<r2 ……..

Sequential Sampling Plan

Risk Acceptable Quality Level (AQL) a (Producer’s risk) Max. acceptable percentage of defectives agreed by the producer and user. a (Producer’s risk) The probability of rejecting a good lot. Lot Tolerance Percent Defective (LTPD) Percentage of defectives that defines consumer’s rejection point.  (Consumer’s risk) The probability of accepting a bad lot. 8

Decision Law Accept the lot Reject the lot Acceptable Producer’s Risk sentence quality Accept the lot Reject the lot Acceptable Producer’s Risk Un-acceptable (Rejected) Consumer’s Risk

Operating Characteristic (OC) Curve Probability of acceptance for the lot to be inspected under different percentage of defectives. OC (p)=Pr(Accept the lot |p) ≡P (Sn ≦C |p)

OC Curve

Operating Characteristic Curve 1 0.9 a = .05 (producer’s risk) 0.8 0.7 n = 99 c = 4 0.6 0.5 Probability of acceptance 0.4 0.3  =.17 (consumer’s risk) 0.2 0.1 1 2 3 4 5 6 7 8 9 10 11 12 AQL LTPD Percent defective 9

Example: AQL=1 % LQL=6 % OC (1%)=0.95 OC(6 %)=0.10 (n,c)=(89, 2)

OC-Curve’s calculation for attribute data Type A (Hyper-Geometric approach): Type B (Binomial approach): Type C (Poisson approach):

(n ,c)’s effect on OC-Curve

Acceptance Sampling: Single Sampling Plan A simple goal Determine (1) how many units, n, to sample from a lot, and (2) the maximum number of defective items, c, that can be found in the sample before the lot is rejected. 7

Example: Acceptance Sampling Problem Zypercom, a manufacturer of video interfaces, purchases printed wiring boards from an outside vender, Procard. Procard has set an acceptable quality level of 1% and accepts a 5% risk of rejecting lots at or below this level. Zypercom considers lots with 3% defectives to be unacceptable and will assume a 10% risk of accepting a defective lot. Develop a sampling plan for Zypercom and determine a rule to be followed by the receiving inspection personnel. 10

Example: Step 1. What is given and what is not? In this problem, AQL is given to be 0.01 and LTDP is given to be 0.03. We are also given an alpha of 0.05 and a beta of 0.10. What you need to determine your sampling plan is “c” and “n.” 11

Example: Step 2. Determine “c” First divide LTPD by AQL. Then find the value for “c” by selecting the value in the TN7.10 “n(AQL)”column that is equal to or just greater than the ratio above. Exhibit TN 7.10 c LTPD/AQL n AQL 44.890 0.052 5 3.549 2.613 1 10.946 0.355 6 3.206 3.286 2 6.509 0.818 7 2.957 3.981 3 4.890 1.366 8 2.768 4.695 4 4.057 1.970 9 2.618 5.426 So, c = 6. 11

Example: Step 3. Determine Sample Size Now given the information below, compute the sample size in units to generate your sampling plan. c = 6, from Table n (AQL) = 3.286, from Table AQL = .01, given in problem n(AQL/AQL) = 3.286/.01 = 328.6, or 329 (always round up) Sampling Plan: Take a random sample of 329 units from a lot. Reject the lot if more than 6 units are defective. 13