www.access-board.gov AASHTO SCOTE June 19 th, 2007 Update: Public Rights-of-Way Rulemaking Scott Windley, PROW Team Leader Dennis Cannon, Transportation.

Slides:



Advertisements
Similar presentations
Accessible Pedestrian Signals (APS)
Advertisements

Detectable Warnings X Correct Placement if X < 5 feet
ADA Requirements Well-designed sidewalks meet ADA requirements:
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Draft Temporary Pedestrian Access Route (TPAR) Guidance
Presented by: Mike Sisson February 23, It is the Law The Americans with Disabilities Act of It is the Right Thing to do Provide Equal Access.
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
ADA* for Roads & Bridges
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
The Americans with Disabilities Act Will McClure California Division Office.
1 ADA Compliance: Self-evaluations and Transition Plans APA Minnesota State Conference September 28, 2011 Hennepin County’s Experience.
ADA Update Linda I. Singer ADA Title II Coordinator John Gover ADA Review Team Leader Maryland State Highway Administration 1.
FHWA Report on MUTCD Activities Chung Eng, FHWA Office of Transportation Operations NCUTCD Meeting – June 26, 2014.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 15 Publication No. FHWA-HRT Bicycle Lanes.
Sect. 12A-2 – Accessible SW Requirements ADA Clarifications: – When are curb ramps required? – What constitutes an alteration? – Does the scope of resurfacing.
Proposed Changes to the ADA & ABA Accessibility Guidelines This presentation was prepared by the U.S. Access Board for the ADA Distance Learning 2000 program.
 Respond to complaints of inaccessibility and other forms of disability discrimination by enforcing state and federal laws to protect the rights of.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
DUPAGE COUNTY MAYORS & MANAGERS TECHNICAL COMMITTEE MAY 24, 2012 LOMBARD, IL.
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
Dowling Associates, Inc. Combining Pedestrian Plans & ADA Transition Plans Combining Pedestrian Plans and ADA Transition Plans Gail Payne Dowling Associates,
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Accessible Pedestrian Signals Guidelines and Policies Mark Luszcz, P.E., PTOE Assistant Chief Traffic Engineer Delaware Department of Transportation Presentation.
Barriers to Use of Fixed Route Transit Services Janet M. Barlow Certified Orientation and Mobility Specialist Accessible Design for the Blind NCAMPO conference.
Florida Department of Transportation, November 2009
Overview of ADA and the PROW and Roles for LTAP/TTAP Centers
Let’s Get Technical: Standards, Best Practices, and Guidelines for Pedestrian Facilities in the Public Right-of-Way For Montana Department of Transportation.
Accessibility Regulation Scott Windley, PROW Team Leader Dennis Cannon, Transportation Specialist Lois Thibault, Research Coordinator.
Part 3 – Markings. Dotted (not broken) lane lines shall be used for non-continuing lanes:  Lane drops  Auxiliary lanes  Deceleration lanes  Acceleration.
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
Proposed Guidelines for Pedestrian Facilities in the Public Right-of-Way Scott J. Windley Accessibility Specialist US Access Board.
1 Starting a Project – Looking for footpaths or pushed down ROW fences Plan for your pedestrians or they will be walking through your project on the edge.
Caltrans Approval Process: Update Van Ness Avenue BRT Citizens Advisory Committee September 8 th, 2009.
Public Rights-of-Way 1/Accessibility Regulation Lois Thibault, Research Coordinator U.S. Access Board Capital Region Council of Governments Hartford,
Traffic Engineering Traffic Control Devices. Traffic Control Traffic engineers do not have any control over individual drivers need to develop devices.
Developing traffic engineering guidelines Lessons learned developing guidelines for the Ministry of Municipal and Rural Affairs, Kingdom of Saudi Arabia.
Americans with Disabilities Act Status Update What All Camp Directors Need to Know Presented by Jennifer K. Skulski National Center on Accessibility
Streets, Sidewalks & Everything in Between Part 1 – Background Part 2 – Public Rights of Way Part 3 – Shared Use Paths & Trails Dean Perkins, RA - ADA.
Work Zone Traffic Control for Pedestrians and Bicyclists ATSSA Virginia Chapter Meeting April 15, 2015 Paul Kelley – VDOT Work Zone Safety.
Transportation Operations Group Transportation Institute Texas Transportation Institute Texas.
1 NCHRP Update of the AASHTO Guide for the Planning, Design, and Operations of Pedestrian Facilities Final Report.
San José’s ADA Sidewalk Transition Plan
Research Committee – June 2008 No meeting this week Next meeting: –January 2009, FHWA TFHRC Research presentations Simulator demonstration –More details.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
Public Right-of-Way Accessibility Guidelines and Roundabouts: Update Scott J Windley US Access Board
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Presented by Dan Dawson, Otak Prepared by Janet M. Barlow
NCHRP AASHTO’s Research Program State DOTs Funds (5.5% of SP&R given voluntarily) Problems Applied research focus National issues Shared issues Contract.
Draft/Conceptual Engineering Solutions for Americans with Disabilities Act (ADA) Compliance by the NYSDOT Pedestrian & Bicycle Program for Pro Walk/Pro.
2009 MUTCD -- Compliance Dates NPA Notice of Proposed Amendments to MUTCD: Changes in Compliance Dates Table I-2.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Pedestrian Design at Intersections Lesson 11 Publication No.
Walking is for Everyone Ensuring Access for All Walking Summit October 29, 2015.
Public Space Design Considerations For Individuals Who Are Blind Or Vision Impaired Multimodal and Public Space Design Guidelines August 17, 2011.
Nantucket Accessibility Survey LilyAnne Lewis, Connor McGuirk, Paige Tencati Liason: Mike Burns.
Update on ADA Issues Brooke Struve, PE Design Program Manager Federal Highway Administration AASHTO Subcommittee on Design Annual Meeting—July 13-17, 2008.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
ADA Compliance Program Implementation 28 Image from wikipedia.org.
ADA Compliance in Maryland AASHTO Subcommittee on Design July 2008 By: Kirk McClelland, P.E. Maryland SHA.
Maintenance and Temporary Traffic Control
Geometric Design Strategic Research Program Transportation Research Board AFB10 Geometric Design Committee Brian L. Ray, PE Committee Chair July 27, 2010.
ADA/504 Technical Assistance Tool Ken Woodruff, Civil Rights Program Manager, FHWA.
Synthesis of Recent & Ongoing Studies: Accessibility and Pedestrian Safety at Roundabouts Andrew T. Duerr, P.E. Northeast US Roundabouts Peer Exchange.
What's in the 2009 MUTCD For Bicyclists?
No meeting this week Next meeting: January 2009, FHWA TFHRC
Revisions to Part 7 – Traffic Control for School Areas
Accessible shared streets
Technical Committee on Geometric Design
ODOT’s Responsibilities under the Americans with Disabilities Act
Presentation transcript:

AASHTO SCOTE June 19 th, 2007 Update: Public Rights-of-Way Rulemaking Scott Windley, PROW Team Leader Dennis Cannon, Transportation Specialist Lois Thibault, Research Coordinator U.S. Access Board

New pedestrian guidelines: The Access Board began work on public rights-of-way guidelines (PROWAG) to supplement ADAAG in 1992: ► section 14 (NPRM 2002/IFR 1994); ► sidewalk video and design manual (1997); ► advisory committee (1999); ► PROWAAC report (2001); ► draft PROWAG NoA (June ‘02); ► revised draft PROWAG NoA (November ’05)

PROWAG adapts ADAAG, but.... The PROWAG draft adapts ADAAG to the rights-of-way environment. The new guidelines will be a stand-alone document using rights-of-way industry measures and language. Key differences: ► the slope limits of an accessible route are not applied to sidewalks; ► there is no path-of-travel requirement, ► new communications features (DW, APS) are required, and ► metric units lead.

Organization of the draft (2): ► Preamble (discussion) --explains decision making; highlights changes --Q&A on alterations ► Text --R1: general --R2: scoping requirements --R3: PROW technical provisions --R4: references to other (building) technical provisions in ADA/ABA-AG ►

Table of Contents R1 Application and Administration R2 Scoping Requirements R3 Technical Provisions --Pedestrian access route (PAR) --Alternate circulation path --Curb ramps and blended transitions --Detectable warning surfaces --Pedestrian crossings --Accessible pedestrian signals (APS) --Street furniture --On-street parking --Callboxes R4Supplementary Technical Provisions (from ADA/ABA-AG)

PROWAG Key Provisions: A high degree of convenient access is easiest to achieve in new construction NEW CONSTRUCTION: THE ‘CORN FIELD IN KANSAS’

PROWAG Key Provisions: In alterations, you may not be able to optimize conditions for every user (follow new construction guidelines to the maximum extent feasible) RESURFACING RECONSTRUCTION ALTERATIONS

Next steps in rulemaking: We are currently working with key highway industry stakeholders to develop the data we need to analyze cost/benefit issues for the regulatory assessment: ► AASHTO ► APWA ► FHWA ► ITE ► Tx DOT ► TRB

Key cost issues identified: Highway industry stakeholders reviewed the draft guidelines and a 2001 industry cost study of the PROWAAC recommendations over the course of several meetings. By consensus, five cost items were identified as significant: ► detectable warnings (savings from reduced area) ► APS (integration may lower cost) ► tabled intersections ► temporary pedestrian routes ► roundabout signalization

PROWAG Detectable Warnings: All ramps and raised crossings must have detectable warnings to provide notice underfoot of the change from a pedestrian to a vehicular route. DWs AT WHITE HOUSERETROFIT PORTLAND, OR

PROWAG Detectable Warnings: Blended transitions have a slope of less than 5%. Detectable warnings are provided across the entire transition.

PROWAG Detectable warnings are required at medians.

PROWAG Accessible Pedestrian Signal (APS): When new pedestrian signals are installed, include APS. Audible signal is integrated in pedbutton.

PROWAG APS: Provide 30”x48” clear ground space at all controls within reach range. 10” AWAY 48” HIGH

APS While we don’t know what is happening everywhere we do know… The State of Maryland has a policy in place to include APS in all new Ped signal installations FHWA encourage the use of the draft in absence of specific PROW standards

APS The draft ties installation of APS to: Providing pedestrian signals (in new construction and alterations) It is NOT a retrofit requirement and is NOT tied to the marking of crosswalks. NCHRP 3-62 has helped the signals technical committee develop language for MUTCD which the Access Board will coordinate with for consistancy.

PROWAG Tabled Intersections: Where two directions of travel intersect at corners (or where a turn must be made), the PAR must be ‘level’ (2% in both directions) or ‘tabled’. (5% where intersection has no stop control) THIS… ….NOT THIS!

PROWAG Temporary PARs: When the PAR is detoured, provide an alternate route; same-side is best, if feasible (MUTCD)

PROWAG Temporary PARs: The alternate circulation path needs curb ramps, too

PROWAG Roundabouts: Provide pedestrian signals at roundabouts where pedestrian crossings are more than one lane. TWO HEADS MAY BE BETTER THAN THREE (AND RARELY USED…)

Signalization of Roundabouts Applies to multi-lane roundabouts We currently do not know what jurisdictions are doing. The Access Board with FHWA are trying to do some experimentation. There is also a NCHRP project (3-78) doing research.

Technical assistance coming soon! Technical assistance coming soon! ‘PLANNING AND DESIGN FOR ALTERATIONS IN THE PROW’ TECHNICAL ASSISTANCE RECOMMENDATIONS FROM PROWAAC

Board PROW resources: Publications: accessible sidewalks design manual accessible sidewalks videotape synthesis on detectable warnings bulletin on roundabout accessibility curriculum on accessible pedestrian design Research: controllers and APS; APS case studies wayfinding slope effects on manual wheelchairs exterior lighting roundabout signalization

Questions…? Scott Windley, PROW Team Leader 202/ (v) or Dennis Cannon, Transportation Specialist 202/ (v) or Lois Thibault, Coordinator of Research 202/ (v) or TTY: 202/ ; Fax: 202/